Bridge Works: Earthwork for Bridges rates
- Items
- 17
- Lowest rate
- ₹190.00
- Highest rate
- ₹780.00
- Effective from
- 2025-04-01
Bridge Works: Earthwork for Bridges rates in the Rajasthan Basic Schedule of Rates 2025-26 run from ₹190.00 to ₹780.00. Transcribed from Rajasthan PWD — Unified Basic Schedule of Rates for year 2025-26, Road & Bridge Works (other than NH & PMGSY), Chief Engineer (Roads), P.W.D. Rajasthan, Jaipur; effective from 01-04-2025. For reference only: verify against the official source before pricing a bid.
17 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| B-1.1.1 | In ordinary soil Depth upto 3 metreDepth upto 3 metre | Cum | 190.00 |
| B-1.1.2 | In ordinary soil Depth upto 3 metreDepth above 3 metre & upto 6 metre | Cum | 225.00 |
| B-1.1.2.1 | In ordinary soil Depth upto 3 metre In hard soilDepth upto 3 metre | Cum | 252.00 |
| B-1.1.2.2 | In ordinary soil Depth upto 3 metre In hard soilDepth above 3 metre & upto 6 metre | Cum | 297.00 |
| B-1.1.2.3 | In ordinary soil Depth upto 3 metre In hard soilDepth above 6 metre | Cum | 340.00 |
| B-1.1.3 | In ordinary soil Depth upto 3 metreDepth above 6 metre | Cum | 275.00 |
| B-1.1.3.1 | In ordinary soil Depth upto 3 metre In hard soil mixed with kankar,boulders etc. upto 20%Depth upto 3 metre | Cum | 275.00 |
| B-1.1.3.2 | In ordinary soil Depth upto 3 metre In hard soil mixed with kankar,boulders etc. upto 20%Depth above 3 metre & upto 6 metre | Cum | 340.00 |
| B-1.1.3.3 | In ordinary soil Depth upto 3 metre In hard soil mixed with kankar,boulders etc. upto 20%Depth above 6 metre | Cum | 430.00 |
| B-1.1.4.1 | In ordinary soil Depth upto 3 metre In hard soil mixed with kankar,boulders etc. above 20%Depth upto 3 metre | Cum | 350.00 |
| B-1.1.4.2 | In ordinary soil Depth upto 3 metre In hard soil mixed with kankar,boulders etc. above 20%Depth above 3 metre & upto 6 metre | Cum | 430.00 |
| B-1.1.4.3 | In ordinary soil Depth upto 3 metre In hard soil mixed with kankar,boulders etc. above 20%Depth above 6 metre | Cum | 530.00 |
| B-1.1.7 | In ordinary soil Depth upto 3 metreIn marshy soil upto 3 metre depth | Cum | 382.00 |
| B-1.2 | Sand filling with compaction in wells complete as per drawing and technical specification as per MoRTH Specification : Section 1210 | Cum | 660.00 |
| B-1.3.1 | Back filling behind abutment, wing wall and return wall in 150mm layers, with mechanical compaction, complete with all lead and lift as per drawing and technical specification as per MoRTH Specification : Clause : 304Gravelly material | Cum | 604.00 |
| B-1.3.2 | Back filling behind abutment, wing wall and return wall in 150mm layers, with mechanical compaction, complete with all lead and lift as per drawing and technical specification as per MoRTH Specification : Clause : 304Sandy material | Cum | 350.00 |
| B-1.4 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRT&H specifications with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification including all material, labour, machinery as per clause 710.1.4 of IRC:78 and clause 2200 of MoRT&H specification | Cum | 780.00 |
- ISSUED BY
- Rajasthan PWD (Roads & Bridges)
- EFFECTIVE
- 2025-04-01
- RETRIEVED
- 2026-07-29
Other chapters in this schedule
- Road Works: Loading, Unloading, Carriage Crushing of Materials and Setting24
- Road Works: Site Clearance62
- Road Works: Earthwork, Erosion Control and Drainage28
- Road Works: Granular Sub-Bases, Bases (Non-Bituminous) and Shoulders21
- Road Works: Bases and Surface Courses (Bituminous)13
- Road Works: Cement Concrete Pavement32
- Road Works: Pipe Culverts16
- Road Works: Traffic Signs, Markings and Other Road Appurtenances60
- Road Works: Foundation31
- Road Works: Substructure36
- Road Works: Superstructure32
- Road Works: Protection Works20
Pricing bridge works: earthwork for bridges against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.