Bridge Works: Earthwork for Bridges rates

17 bridge works: earthwork for bridges items from the Rajasthan PWD (Roads & Bridges), effective 2025-04-01.
Items
17
Lowest rate
₹190.00
Highest rate
₹780.00
Effective from
2025-04-01
S-01/RATE ITEMS17 ITEMS

Bridge Works: Earthwork for Bridges rates in the Rajasthan Basic Schedule of Rates 2025-26 run from ₹190.00 to ₹780.00. Transcribed from Rajasthan PWD — Unified Basic Schedule of Rates for year 2025-26, Road & Bridge Works (other than NH & PMGSY), Chief Engineer (Roads), P.W.D. Rajasthan, Jaipur; effective from 01-04-2025. For reference only: verify against the official source before pricing a bid.

Download the full schedule (Excel)All 22 chapters

17 items. Scroll the table to browse

DescriptionUnit
B-1.1.1In ordinary soil Depth upto 3 metreDepth upto 3 metreCum190.00
B-1.1.2In ordinary soil Depth upto 3 metreDepth above 3 metre & upto 6 metreCum225.00
B-1.1.2.1In ordinary soil Depth upto 3 metre In hard soilDepth upto 3 metreCum252.00
B-1.1.2.2In ordinary soil Depth upto 3 metre In hard soilDepth above 3 metre & upto 6 metreCum297.00
B-1.1.2.3In ordinary soil Depth upto 3 metre In hard soilDepth above 6 metreCum340.00
B-1.1.3In ordinary soil Depth upto 3 metreDepth above 6 metreCum275.00
B-1.1.3.1In ordinary soil Depth upto 3 metre In hard soil mixed with kankar,boulders etc. upto 20%Depth upto 3 metreCum275.00
B-1.1.3.2In ordinary soil Depth upto 3 metre In hard soil mixed with kankar,boulders etc. upto 20%Depth above 3 metre & upto 6 metreCum340.00
B-1.1.3.3In ordinary soil Depth upto 3 metre In hard soil mixed with kankar,boulders etc. upto 20%Depth above 6 metreCum430.00
B-1.1.4.1In ordinary soil Depth upto 3 metre In hard soil mixed with kankar,boulders etc. above 20%Depth upto 3 metreCum350.00
B-1.1.4.2In ordinary soil Depth upto 3 metre In hard soil mixed with kankar,boulders etc. above 20%Depth above 3 metre & upto 6 metreCum430.00
B-1.1.4.3In ordinary soil Depth upto 3 metre In hard soil mixed with kankar,boulders etc. above 20%Depth above 6 metreCum530.00
B-1.1.7In ordinary soil Depth upto 3 metreIn marshy soil upto 3 metre depthCum382.00
B-1.2Sand filling with compaction in wells complete as per drawing and technical specification as per MoRTH Specification : Section 1210Cum660.00
B-1.3.1Back filling behind abutment, wing wall and return wall in 150mm layers, with mechanical compaction, complete with all lead and lift as per drawing and technical specification as per MoRTH Specification : Clause : 304Gravelly materialCum604.00
B-1.3.2Back filling behind abutment, wing wall and return wall in 150mm layers, with mechanical compaction, complete with all lead and lift as per drawing and technical specification as per MoRTH Specification : Clause : 304Sandy materialCum350.00
B-1.4Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRT&H specifications with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification including all material, labour, machinery as per clause 710.1.4 of IRC:78 and clause 2200 of MoRT&H specificationCum780.00
S-02/SOURCE RECORD2025-26
ISSUED BY
Rajasthan PWD (Roads & Bridges)
EFFECTIVE
2025-04-01
RETRIEVED
2026-07-29
S-03/CHAPTERS20 MORE

Other chapters in this schedule

SHOW ALL 20 CHAPTERS
ARCHED / ESTIMATING

Pricing bridge works: earthwork for bridges against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.