Bridge Works: Protective Works rates

8 bridge works: protective works items from the Rajasthan PWD (Roads & Bridges), effective 2025-04-01.
Items
8
Lowest rate
₹1,040.00
Highest rate
₹4,434.00
Effective from
2025-04-01
S-01/RATE ITEMS8 ITEMS

Bridge Works: Protective Works rates in the Rajasthan Basic Schedule of Rates 2025-26 run from ₹1,040.00 to ₹4,434.00. Transcribed from Rajasthan PWD — Unified Basic Schedule of Rates for year 2025-26, Road & Bridge Works (other than NH & PMGSY), Chief Engineer (Roads), P.W.D. Rajasthan, Jaipur; effective from 01-04-2025. For reference only: verify against the official source before pricing a bid.

Download the full schedule (Excel)All 22 chapters
Unit

8 items. Scroll the table to browse

DescriptionUnit
B-5.1.1Providing and laying specified Apron complete as per drawing and technical specification as per MoRTH Specification : Clause: 2503Boulder/Quarry stone weighing not less than 40 kg (specfic gravity not less than 2.65)Cum1,040.00
B-5.1.2Providing and laying specified Apron complete as per drawing and technical specification as per MoRTH Specification : Clause: 2503Boulder/Quarry stone not less than 40 kg in weight, in wire crates, 3x1.5x1.25 metre with wire diametre not less than 4mm mesh not more than 150mmCum1,430.00
B-5.1.3Providing and laying specified Apron complete as per drawing and technical specification as per MoRTH Specification : Clause: 2503Cement concrete blocks (in M-15 grade) weighing not less than 40 kg each complete with form work etc as per MoRTH Specification: Clause:2504Cum3,400.00
B-5.2Providing and laying graded stone aggregate Filter Material underneath pitching on slopes complete as per drawing and technical Specification as per MoRTH Specification : Clause 2504Cum1,420.00
B-5.4.1Providing and laying flooring of Rubble stone/ C.C M15 block over bedding complete as per drawing and technical specification as per MoRTH Specification : Clause 2505,1700Rubble stone laid in cement mortar 1:3Cum3,500.00
B-5.4.2Providing and laying flooring of Rubble stone/ C.C M15 block over bedding complete as per drawing and technical specification as per MoRTH Specification : Clause 2505,1700Cement concrete block of M-15 grade including form workCum4,434.00
B-5.4.3Providing and laying flooring of Rubble stone/ C.C M15 block over bedding complete as per drawing and technical specification as per MoRTH Specification : Clause 2505,1700P/L cement concrete M-15 beddingCum3,740.00
B-5.5Providing fixing and erecting 50mm dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC Series) 100mm x 50mm,1.2m high above ground, 2m centre-to -centre, complete as per approved drawings MoRTH clause 2703Rmt1,810.00
S-02/SOURCE RECORD2025-26
ISSUED BY
Rajasthan PWD (Roads & Bridges)
EFFECTIVE
2025-04-01
RETRIEVED
2026-07-29
S-03/CHAPTERS20 MORE

Other chapters in this schedule

SHOW ALL 20 CHAPTERS
ARCHED / ESTIMATING

Pricing bridge works: protective works against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.