Rajasthan SOR 2025-26
Bridge Works: Protective Works rates
8 bridge works: protective works items from the Rajasthan PWD (Roads & Bridges), effective 2025-04-01.
Bridge Works: Protective Works rates in the Rajasthan Basic Schedule of Rates 2025-26 run from ₹1,040.00 to ₹4,434.00. Transcribed from Rajasthan PWD — Unified Basic Schedule of Rates for year 2025-26, Road & Bridge Works (other than NH & PMGSY), Chief Engineer (Roads), P.W.D. Rajasthan, Jaipur; effective from 01-04-2025. Reference only — verify against the official source before pricing a bid.
8 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| B-5.1.1 | Providing and laying specified Apron complete as per drawing and technical specification as per MoRTH Specification : Clause: 2503Boulder/Quarry stone weighing not less than 40 kg (specfic gravity not less than 2.65) | Cum | 1,040.00 |
| B-5.1.2 | Providing and laying specified Apron complete as per drawing and technical specification as per MoRTH Specification : Clause: 2503Boulder/Quarry stone not less than 40 kg in weight, in wire crates, 3x1.5x1.25 metre with wire diametre not less than 4mm mesh not more than 150mm | Cum | 1,430.00 |
| B-5.1.3 | Providing and laying specified Apron complete as per drawing and technical specification as per MoRTH Specification : Clause: 2503Cement concrete blocks (in M-15 grade) weighing not less than 40 kg each complete with form work etc as per MoRTH Specification: Clause:2504 | Cum | 3,400.00 |
| B-5.2 | Providing and laying graded stone aggregate Filter Material underneath pitching on slopes complete as per drawing and technical Specification as per MoRTH Specification : Clause 2504 | Cum | 1,420.00 |
| B-5.4.1 | Providing and laying flooring of Rubble stone/ C.C M15 block over bedding complete as per drawing and technical specification as per MoRTH Specification : Clause 2505,1700Rubble stone laid in cement mortar 1:3 | Cum | 3,500.00 |
| B-5.4.2 | Providing and laying flooring of Rubble stone/ C.C M15 block over bedding complete as per drawing and technical specification as per MoRTH Specification : Clause 2505,1700Cement concrete block of M-15 grade including form work | Cum | 4,434.00 |
| B-5.4.3 | Providing and laying flooring of Rubble stone/ C.C M15 block over bedding complete as per drawing and technical specification as per MoRTH Specification : Clause 2505,1700P/L cement concrete M-15 bedding | Cum | 3,740.00 |
| B-5.5 | Providing fixing and erecting 50mm dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC Series) 100mm x 50mm,1.2m high above ground, 2m centre-to -centre, complete as per approved drawings MoRTH clause 2703 | Rmt | 1,810.00 |
Other chapters in this schedule
- Road Works: Loading, Unloading, Carriage Crushing of Materials and Setting (24)
- Road Works: Site Clearance (62)
- Road Works: Earthwork, Erosion Control and Drainage (28)
- Road Works: Granular Sub-Bases, Bases (Non-Bituminous) and Shoulders (21)
- Road Works: Bases and Surface Courses (Bituminous) (13)
- Road Works: Cement Concrete Pavement (32)
- Road Works: Pipe Culverts (16)
- Road Works: Traffic Signs, Markings and Other Road Appurtenances (60)
- Road Works: Foundation (31)
- Road Works: Substructure (36)
- Road Works: Superstructure (32)
- Road Works: Protection Works (20)
- Road Works: Maintenance of Roads (28)
- Road Works: Additional Items (101)
- Road Works: Additional Items (New) (307)
- Bridge Works: Earthwork for Bridges (17)
- Bridge Works: Foundation (85)
- Bridge Works: Substructure (38)
- Bridge Works: Super Structure (39)
- Bridge Works: Repair and Rehabilitation (6)
Pricing bridge works: protective works against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.