Skip to main content

Rajasthan SOR 2025-26

Bridge Works: Substructure rates

38 bridge works: substructure items from the Rajasthan PWD (Roads & Bridges), effective 2025-04-01.

Bridge Works: Substructure rates in the Rajasthan Basic Schedule of Rates 2025-26 run from ₹220.00 to ₹1,02,300.00. Transcribed from Rajasthan PWD — Unified Basic Schedule of Rates for year 2025-26, Road & Bridge Works (other than NH & PMGSY), Chief Engineer (Roads), P.W.D. Rajasthan, Jaipur; effective from 01-04-2025. Reference only — verify against the official source before pricing a bid.

38 items — scroll the table to browse

DescriptionUnit
B-3.3.1Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkP.C.C. grade M15 upto 5 metre heightCum4,050.00
B-3.3.2Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkP.C.C. grade M20 upto 5 metre heightCum4,500.00
B-3.3.3Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkP.C.C. grade M25 upto 5 metre heightCum4,860.00
B-3.3.4Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkP.C.C. grade M25 above 5 metre & upto 10 metre heightCum5,070.00
B-3.3.5Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkP.C.C. grade M25 above 10 metre heightCum5,370.00
B-3.3.6Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkP.C.C. grade M30 upto 5 metre heightCum4,900.00
B-3.3.7Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkP.C.C. grade M30 above 5 metre & upto 10 metre heightCum5,070.00
B-3.3.8Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkP.C.C. grade M30 above 10 metre heightCum5,440.00
B-3.3.9Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkP.C.C. grade M35 upto 5 metre heightCum5,050.00
B-3.3.10Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkP.C.C. grade M35 above 5 metre & upto 10 metre heightCum5,170.00
B-3.3.11Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkP.C.C. grade M35 above 10 metre heightCum5,500.00
B-3.3.12Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkP.C.C. grade M40 upto 5 metre heightCum5,170.00
B-3.3.13Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkP.C.C. grade M40 above 5 metre & upto 10 metre heightCum5,390.00
B-3.3.14Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkP.C.C. grade M40 above 10 metre heightCum5,650.00
B-3.3.15Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkR.C.C. grade M20 upto 5 metre heightCum4,500.00
B-3.3.16Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkR.C.C. grade M20 above 5 metre & upto 10 metre heightCum4,650.00
B-3.3.17Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkR.C.C. grade M20 above 10 metre heightCum4,950.00
B-3.3.18Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkR.C.C. grade M25 upto 5 metre heightCum4,950.00
B-3.3.19Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkR.C.C. grade M25 above 5 metre & upto 10 metre heightCum4,950.00
B-3.3.20Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkR.C.C. grade M25 above 10 metre heightCum5,150.00
B-3.3.21Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkR.C.C. grade M30 upto 5 metre heightCum4,950.00
B-3.3.22Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkR.C.C. grade M30 above 5 metre & upto 10 metre heightCum4,950.00
B-3.3.23Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkR.C.C. grade M30 above 10 metre heightCum5,250.00
B-3.3.24Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkR.C.C. grade M35 upto 5 metre heightCum5,300.00
B-3.3.25Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkR.C.C. grade M35 above 5 metre & upto 10 metre heightCum5,350.00
B-3.3.26Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formworkR.C.C. grade M35 above 10 metre heightCum5,650.00
B-3.5.1.1Supplying, fitting and placing reinforcement in sub structure/ superstructure at all level complete as per drawing and clause 1600 & 2200 of MoRT&H Specification including all material, labour, machinary etc. The structural steel to be used should be Primary Steel manufactured and approved by Engineering in chargedMild Steel reinforcementTonne1,00,100.00
B-3.5.1.2Supplying, fitting and placing reinforcement in sub structure/ superstructure at all level complete as per drawing and clause 1600 & 2200 of MoRT&H Specification including all material, labour, machinary etc. The structural steel to be used should be Primary Steel manufactured and approved by Engineering in chargedFE 415/500D HYSD Steel reinforcementTonne1,01,200.00
B-3.5.1.3Supplying, fitting and placing reinforcement in sub structure/ superstructure at all level complete as per drawing and clause 1600 & 2200 of MoRT&H Specification including all material, labour, machinary etc. The structural steel to be used should be Primary Steel manufactured and approved by Engineering in chargedTMT Steel reinforcementTonne1,02,300.00
B-3.5.2.1Supplying, fitting and placing reinforcement in sub structure/ superstructure at all level complete as per drawing and clause 1600 & 2200 of MoRT&H Specification including all material, labour, machinary etc. The structural steel to be used should be used ballot by Primary Steel manufactured and approved by Engineering in chargedMild Steel reinforcementTonne91,000.00
B-3.5.2.2Supplying, fitting and placing reinforcement in sub structure/ superstructure at all level complete as per drawing and clause 1600 & 2200 of MoRT&H Specification including all material, labour, machinary etc. The structural steel to be used should be used ballot by Primary Steel manufactured and approved by Engineering in chargedFE 415/500D HYSD Steel reinforcementTonne92,000.00
B-3.5.2.3Supplying, fitting and placing reinforcement in sub structure/ superstructure at all level complete as per drawing and clause 1600 & 2200 of MoRT&H Specification including all material, labour, machinary etc. The structural steel to be used should be used ballot by Primary Steel manufactured and approved by Engineering in chargedTMT Steel reinforcementTonne93,000.00
B-3.12P&F on culverts/ bridges deck rain water spouts made of cast iron as per MoRTH specification completeEach1,550.00
B-3.13Providing A.C pipe Weep holes 150mm dia in Masonry/Plain Concrete/.Reinforced Concrete abutment, wing wall/return wall complete as per drawing and technical specfication as per MoRTH Specification Clause 2205Metre220.00
B-3.14Providing, laying and fixing of strip seal expansion joint catering to maximum horizontal movement upto 70 mm complete as per approved drawings and as per clause 2600 of MoRT&H specifications to be installed by manufacturer's authorized representative ensuring to compliance to manufacturer's instruction for installation including preparing the edges of bridge, welding to exposed reinforcement, concreting with design mix of grade of bridge or M-35 whichever is richer including all material, labour, machinery etc completeMetre12,500.00
B-3.14.2.1Providing and laying Expansion Joint complete as per drawing and technical specification With corrugated copper plate, compressible fibre board, pre-moulded joint filter and joint sealing compound as per MoRTH Specfication section 2600Providing and fixing 2mm thick corrugated copper plate in expansion joint completeSqm10,400.00
B-3.14.2.2Providing and laying Expansion Joint complete as per drawing and technical specification With corrugated copper plate, compressible fibre board, pre-moulded joint filter and joint sealing compound as per MoRTH Specfication section 2600Providing and fixing 20mm thick compressible fibre board in expansion joint completeSqm909.00
B-3.14.2.3Providing and laying Expansion Joint complete as per drawing and technical specification With corrugated copper plate, compressible fibre board, pre-moulded joint filter and joint sealing compound as per MoRTH Specfication section 2600Providing & Fixing in position 20mm thick pre-moulded joint filler in expansion joint completeSqm420.00

Pricing bridge works: substructure against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works