Assam Civil Works Schedule of Rates 2023-24

257 rate items from the Assam Water Resources Department, effective 2023-04-01. Searchable, with Excel and CSV download.

Department
Assam Water Resources Department
Edition
2023-24 — effective 2023-04-01
Financial year start. The schedule states only that it is for the year 2023-24 and effective from the date of publication; it prints no commencement date.
Items reproduced
257 across 22 chapters
Retrieved
2026-07-29

Transcribed from Assam Water Resources (Irrigation) Department — Schedule of Rates (Civil Works) 2023-24. Reference only — departments amend rates through correction slips between editions, so verify against the official source before pricing a bid. Items that could not be transcribed unambiguously have been left out rather than guessed.

Other items

10 items in 7 smaller chapters.

10 items — scroll the table to browse

DescriptionUnit
2.1 (B)(i)Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed — st For 1 KM of Quarry RoadWithout Contractor's Profit & GSTCum81.73
5.1Turfing with grass sode of largest possible rectangular and minimum size 30 cm X 30 cm X 10 cm placing closely after dressing hard the surface and fixing sode with split bamboo pegs, watering till the grass grows with lead up to 90 M and lift of 1.50 M, complete as directedSqm28.15
7.1 (i)Dewatering of CC works considering 1 no. 10 HP and 1 no. of 5 HP pump including POL, carriage and operator's pay etcWithout Contractor's Profit & GSTCum295.57
8.1Providing scaffolding work with rows of bhaluka bamboo and jati bamboo horizontal one row jati bamboo cross and placing second class planks of 0.025 M thick in between the rows tying with coir strings lacing two nos. vertical jati bamboo at both end including dismantling the scaffolding etc, complete as directedCum106.16
9.1 (A)Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered)Shuttering (Slab)Sqm369.38
17.1 (i)Construction and manufacturing of CC lined precast "U" shaped section in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm including supplying expanded 18 gauge metal, horizontal reinforcement and vibrating, carrying to stack yard, curing, etc, complete as directedFor 1 cusecRm2,291.85
17.1 (ii)Construction and manufacturing of CC lined precast "U" shaped section in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm including supplying expanded 18 gauge metal, horizontal reinforcement and vibrating, carrying to stack yard, curing, etc, complete as directedFor 1.5 cusecRm3,254.52
17.1 (iii)Construction and manufacturing of CC lined precast "U" shaped section in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm including supplying expanded 18 gauge metal, horizontal reinforcement and vibrating, carrying to stack yard, curing, etc, complete as directedFor 2 cusecRm3,601.67
17.2Labour charge for laying and fixing RCC "U" shaped section in proper position and grade as per design drawing and specification including fitting and joints voids as of main concrete on top inside to wall finished with 12 mm thick cement mortar in proportion 1:3 including curing and local carriage, etc, complete as directedRm545.93
20.1Supply of Z-type Sheet Pile of effective width 0.69 M, thickness 8 mm and average weight 68.30 Kg/M including loading and unloadingMT1,42,195.00

How to use the Assam Schedule of Rates

The civil works schedule of rates sets the department's accepted rate for each item of work, and estimates for Assam government projects are built by mapping a project's Bill of Quantities to these items. Rates here run from ₹17.86 per sqm to ₹1,90,128.27 per cum, spanning 22 chapters from earthwork through to finishing trades.

Three things routinely go wrong. Estimators price against a superseded edition, because correction slips are published separately from the main schedule. They pick a nearly-similar item code rather than the exact one, which survives internal review and fails departmental scrutiny. And they miss that a rate is quoted for a different unit than the BOQ uses — a sqm rate applied to a cum quantity is a large error that looks reasonable on a spreadsheet.

For the schedules published by every other state, see the Schedule of Rates by state directory, and for how SOR items relate to a tender's BOQ, the guide to SOR vs BOQ.

Pricing a live tender against this schedule

Mapping a tender BOQ to the right SOR items by hand, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.