Skip to main content

Assam SOR 2023-24

Jungle Clearance rates

11 jungle clearance items from the Assam Water Resources Department, effective 2023-04-01.

Jungle Clearance rates in the Assam Civil Works Schedule of Rates 2023-24 run from ₹17.86 to ₹1,592.84. Transcribed from Assam Water Resources (Irrigation) Department — Schedule of Rates (Civil Works) 2023-24. Reference only — verify against the official source before pricing a bid.

11 items — scroll the table to browse

DescriptionUnit
3.1 (i)Cutting jungles and trees upto 50 cm girth including uprooting roots and stumps and removing them from site of work etc, complete as directedLight junglesSqm17.86
3.1 (ii)Cutting jungles and trees upto 50 cm girth including uprooting roots and stumps and removing them from site of work etc, complete as directedMedium junglesSqm25.01
3.1 (iii)Cutting jungles and trees upto 50 cm girth including uprooting roots and stumps and removing them from site of work etc, complete as directedHeavy junglesSqm41.68
3.2 (A)FELLING AND REMOVINGBamboo clumpsSqm418.54
3.2 (B)FELLING AND REMOVINGBamboo clumps including uprooting stumpsSqm492.90
3.2 (C)(i)FELLING AND REMOVING — Cutting trees including uprooting and removing where necessary50 cm to 100 cm girthNos345.07
3.2 (C)(ii)FELLING AND REMOVING — Cutting trees including uprooting and removing where necessary100 cm to 150 cm girthNos752.34
3.2 (C)(iii)FELLING AND REMOVING — Cutting trees including uprooting and removing where necessary150 cm to 180 cm girthNos1,592.84
3.2 (D)FELLING AND REMOVINGTea BushesNos18.39
3.2 (E)FELLING AND REMOVINGTea Bushes including uprootingNos65.14
3.2 (F)FELLING AND REMOVINGCutting and clearing bushes consisting of plants and all sorts of bamboos including uprooting and removing as necessary and filling up the holes with earth including dressing, ramming, complete as directedSqm47.22

Pricing jungle clearance against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works