5 canal work items from the Assam Water Resources Department, effective 2023-04-01.
Canal Work rates in the Assam Civil Works Schedule of Rates 2023-24 run from ₹66.25 to ₹8,386.85. Transcribed from Assam Water Resources (Irrigation) Department — Schedule of Rates (Civil Works) 2023-24. Reference only — verify against the official source before pricing a bid.
/
5 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 18.1 | Providing 50 mm wide expansion joints with bituminous compound mixed with coarse sand for canal work at an interval of 10 M apart including laying, fitting the compound in proper position, etc, complete as directed | Rm | 539.05 |
| 18.2 | Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing | Sqm | 802.20 |
| 18.3 (i) | Labour for preparation of subgrade of lined canal section as per design drawing and grade by ramming and rolled to level and according to the required cross section of the typical lined canal including cutting, filling the existing canal section where necessary compacting the earth in layers in not more than 15 cm thick to form a firm compacted bed & side for lining including watering to obtain required moisture content where necessary etc, complete as directedFor ordinary soil | Sqm | 66.25 |
| 18.3 (ii) | Labour for preparation of subgrade of lined canal section as per design drawing and grade by ramming and rolled to level and according to the required cross section of the typical lined canal including cutting, filling the existing canal section where necessary compacting the earth in layers in not more than 15 cm thick to form a firm compacted bed & side for lining including watering to obtain required moisture content where necessary etc, complete as directedFor sandy soil | Sqm | 80.49 |
| 18.4 | CC Work in lined canal in prop 1:2:4 with river shingles of size 6 mm to 20 mm free from dust, dirt and other foreign materials conforming to IS 2116-1965 and 542- 1962 as specified by the department, water used for mixing the mortar should be free from all impurities including laying the concrete over the subgrade, moistened thoroughly by hand placing / mechanical placing in canal of not more than 3 M sides with suitable joints in between including providing bed sleepers (cast-in-situ or pre cast) under joints in between including providing all sealing materials as per design and drawing before laying concrete including finishing the surface smooth, clean of all impurities with curing the bed by manual labours and side by sprinkling for at least 28 days etc, complete as directed. (Proper arrangement for obtaining clean water should be made at site) | Cum | 8,386.85 |
Other chapters in this schedule
Pricing canal work against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.