S-01/RATE ITEMS12 ITEMS

RCC Work rates in the Assam Civil Works Schedule of Rates 2023-24 run from ₹241.97 to ₹12,997.96. Transcribed from Assam Water Resources (Irrigation) Department — Schedule of Rates (Civil Works) 2023-24. For reference only: verify against the official source before pricing a bid.

Download the full schedule (Excel)All 22 chapters
Unit

12 items. Scroll the table to browse

DescriptionUnit
12.1 (A)(i)IN PROPORTION 1:1½:3 (M20) — WITH HARD BROKEN STONE AGGREGATE SIZE 6 MM TORCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc, complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)Cum11,982.56
12.1 (A)(ii)IN PROPORTION 1:1½:3 (M20) — WITH HARD BROKEN STONE AGGREGATE SIZE 6 MM TORCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirt wall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)Cum12,366.21
12.1 (B)(i)IN PROPORTION 1:1½:3 (M20) — HARD RIVER SHINGLES SIZE 6 MM TO 20 MMRCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:1½:3 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)Cum10,363.62
12.1 (B)(ii)IN PROPORTION 1:1½:3 (M20) — HARD RIVER SHINGLES SIZE 6 MM TO 20 MMRCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:1½:3 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)Cum10,747.27
12.2 (A)(i)IN PROPORTION 1:2:4 (M15) — WITH HARD BROKEN STONE AGGREGATE SIZE 6 MM TORCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)Cum11,562.41
12.2 (A)(ii)IN PROPORTION 1:2:4 (M15) — WITH HARD BROKEN STONE AGGREGATE SIZE 6 MM TORCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing, dewatering etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)Cum11,816.87
12.2 (B)(i)IN PROPORTION 1:2:4 (M15) — WITH HARD RIVER SHINGLES SIZE 6 MM TO 20 MMRCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)Cum9,794.45
12.2 (B)(ii)IN PROPORTION 1:2:4 (M15) — WITH HARD RIVER SHINGLES SIZE 6 MM TO 20 MMRCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing, dewatering etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)Cum10,178.10
12.3 (i)RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:1:2 (M25) with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Reinforcement, shuttering, scaffolding cost will be paid separately)Without shutteringCum12,591.99
12.4Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directedQuintal12,997.96
12.5Machine mixing charge of cement concrete / reinforced cement concrete with different types of concrete mixture machine of 10 / 7 CuFt capacityCum289.29
12.6Vibrating in CC / RCC work with vibrator including local carriage of vibrator etc. complete as directedCum241.97
S-02/SOURCE RECORD2023-24
ISSUED BY
Assam Water Resources Department
EFFECTIVE
2023-04-01Financial year start. The schedule states only that it is for the year 2023-24 and effective from the date of publication; it prints no commencement date.
RETRIEVED
2026-07-29
S-03/CHAPTERS14 MORE

Other chapters in this schedule

SHOW ALL 14 CHAPTERS
ARCHED / ESTIMATING

Pricing rcc work against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.