9 surveying items from the Assam Water Resources Department, effective 2023-04-01.
Surveying rates in the Assam Civil Works Schedule of Rates 2023-24 run from ₹104.93 to ₹34,878.73. Transcribed from Assam Water Resources (Irrigation) Department — Schedule of Rates (Civil Works) 2023-24. Reference only — verify against the official source before pricing a bid.
/
9 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 4.3 | Carrying out levelling survey taking long section and cross section at 30 M interval of proposed canal system, afflux bund, approach road and along the stream including chaining, pegging, holding staff, carrying out instrument, clearing jungle etc, complete as directed | KM | 34,878.73 |
| 4.4 | Fly levelling for checking the level after completion of survey along the existing canal and connection of BM pillars | KM | 3,332.01 |
| 4.6 | Supplying of wooden pegs of size 0.60 M x 0.045 M x 0.045 M made of 2nd class local wood | Nos | 104.93 |
| 4.7 | Carrying out block contour survey of the commanded area covering stream, dong, channel, road etc. and the whole area considering square block system and spot system and spot levels are to be within 30 M x 30 M for preparation of contour including clearing light jungles, chaining, pegging holding staff, umbrella and compass lining etc. where required, complete as directed | Hectare | 2,030.97 |
| 4.8 | Carrying out levelling survey, taking long section including cross section at 30 M interval of proposed canal system, afflux bund, guide bund, approach road and along the stream including chaining, pegging, holding staff, carrying out instrument, clearing jungle etc, complete as directed | KM | 32,836.10 |
| 4.9 | Carrying out levelling survey for taking long section of field channel at an interval not more than 30 M or part thereof including ranging, chaining, holding staff, driving pegs, clearing light jungles and carrying survey materials etc, complete as directed | KM | 3,057.38 |
| 4.10 | Supplying wooden hammer of size 15 cm x 10 cm with 45 cm long & 5 cm wodden handle etc, complete as directed | Nos | 948.74 |
| 4.11 | Construction of R.C.C BM Pillar of size 0.15 M X 0.10 M in proportion 1:2:4 with required reinforcement including E/W in excavation, brick soling, centering, shuttering and propping, etc, complete as directed | Nos | 4,706.34 |
| 4.12 | Final Survey before and after execution across existing damaged canal system for checking cross section and long section at the interval of 25 M including supplying of labour and other materials such as jati bamboo kamies, coir rope, paint and local wood chainage peg of size 1½" x 1½" x 3' etc, complete as directed | KM | 17,748.33 |
Other chapters in this schedule
Pricing surveying against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.