Assam SOR 2023-24
Collection rates
17 collection items from the Assam Water Resources Department, effective 2023-04-01.
Collection rates in the Assam Civil Works Schedule of Rates 2023-24 run from ₹434.47 to ₹3,595.63. Transcribed from Assam Water Resources (Irrigation) Department — Schedule of Rates (Civil Works) 2023-24. Reference only — verify against the official source before pricing a bid.
/
17 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 1.1 (i) | SAND Collection of sand at quarry free from dust & other foreign materials including screening etc, complete as directedWithout Contractor's Profit & GST | Cum | 434.47 |
| 1.2 (A) | BOULDERCollection of one man size 25 cm to 30 cm hard river boulder including stacking in measurable stacks of not more than 1.00 M height at quarry site and complete as directed | Cum | 1,024.75 |
| 1.2 (B) | BOULDERCollection of blasted boulder of size 25 cm to 30 cm including stacking at quarry site, complete as directed | Cum | 1,536.03 |
| 1.2 (C) | BOULDERCollection of blasted boulder of size 15 cm to 23 cm including stacking in measurable stacks not more than 1.00 M in height at quarry site and complete as directed | Cum | 1,788.07 |
| 1.2 (D) | BOULDERCollection of 15 cm to 23 cm hard river boulder including stacking in measurable stacks not more than 1.00 M in height at quarry site and complete as directed | Cum | 1,164.65 |
| 1.3 (A) | HARD RIVER GRAVELCollection of hard river gravel, chips of size 6 mm to 20 mm free from dust and dirt from quarry including loading and unloading etc, complete as directed | Cum | 1,412.01 |
| 1.3 (B) | HARD RIVER GRAVELCollection of hard river gravel, chips of size 13 mm to 25 mm free from dust and dirt from quarry including loading and unloading etc, complete as directed | Cum | 1,278.59 |
| 1.3 (C) | HARD RIVER GRAVELCollection of hard river gravel of size 5 cm to 15 cm free from dust and dirt from quarry including loading and unloading etc, complete as directed | Cum | 1,291.57 |
| 1.3 (D) | HARD RIVER GRAVELCollection of hard river gravel of size 13 mm to 38 mm free from dust and dirt from quarry including loading and unloading etc, complete as directed | Cum | 1,158.16 |
| 1.4 (i) | PEA GRAVEL Collection of 4 mm to 8 mm river pea gravel free from dust, dirt and other foreign materials, collecting from approved quarry including double screening, loading, unloading, local carriage and stacking in measurable stacks at site not more than 1.00 M height and complete as directedWithout Contractor's Profit & GST | Cum | 975.05 |
| 1.5 (A)(i) | HARD BROKEN STONECollection of hard broken stone of size 6 mm to 20 mm from river boulder free from dust and dirt and foreign materials including stacking at quarry site, complete as directed | Cum | 3,116.80 |
| 1.5 (A)(ii) | HARD BROKEN STONECollection of hard broken stone of size 6 mm to 20 mm from blasted boulder free from dust and dirt and foreign materials including stacking at quarry site, complete as directed | Cum | 3,595.63 |
| 1.5 (B)(i) | HARD BROKEN STONECollection of hard broken stone of size 13 mm to 25 mm from river boulder free from dust and dirt and foreign materials including stacking at quarry site, complete as directed | Cum | 2,983.39 |
| 1.5 (B)(ii) | HARD BROKEN STONECollection of hard broken stone of size 13 mm to 25 mm from blasted boulder free from dust and dirt and foreign materials including stacking at quarry site, complete as directed | Cum | 3,449.24 |
| 1.5 (C)(i) | HARD BROKEN STONECollection of hard broken stone of size 13 mm to 38 mm from river boulder free from dust and dirt and foreign materials including stacking at quarry site, complete as directed | Cum | 2,716.56 |
| 1.5 (C)(ii) | HARD BROKEN STONECollection of hard broken stone of size 13 mm to 38 mm from blasted boulder free from dust and dirt and foreign materials including stacking at quarry site, complete as directed | Cum | 3,227.84 |
| 1.6 | Collection of sand gravel (40% sand and 60% gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and complete as directed | Cum | 898.91 |
Other chapters in this schedule
Pricing collection against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works