R/ASSAM SOR 2023-24
Plastering rates
5 plastering items from the Assam Water Resources Department, effective 2023-04-01.
- Items
- 5
- Lowest rate
- ₹224.59
- Highest rate
- ₹299.65
- Effective from
- 2023-04-01
S-01/RATE ITEMS5 ITEMS
Plastering rates in the Assam Civil Works Schedule of Rates 2023-24 run from ₹224.59 to ₹299.65. Transcribed from Assam Water Resources (Irrigation) Department — Schedule of Rates (Civil Works) 2023-24. For reference only: verify against the official source before pricing a bid.
/
5 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 14.1 (i) | 6 mm cement plastering including clearing surface and curing, complete as directedIn proportion 1:2 | Sqm | 235.84 |
| 14.1 (ii) | 6 mm cement plastering including clearing surface and curing, complete as directedIn proportion 1:3 | Sqm | 224.59 |
| 14.2 (i) | 12 mm cement plastering including clearing surface and curing, complete as directedIn proportion 1:3 | Sqm | 299.65 |
| 14.2 (ii) | 12 mm cement plastering including clearing surface and curing, complete as directedIn proportion 1:4 | Sqm | 281.89 |
| 14.2 (iii) | 12 mm cement plastering including clearing surface and curing, complete as directedIn proportion 1:5 | Sqm | 273.01 |
S-02/SOURCE RECORD2023-24
- ISSUED BY
- Assam Water Resources Department
- EFFECTIVE
- 2023-04-01Financial year start. The schedule states only that it is for the year 2023-24 and effective from the date of publication; it prints no commencement date.
- RETRIEVED
- 2026-07-29
S-03/CHAPTERS14 MORE
Other chapters in this schedule
- Collection17
- Jungle Clearance11
- Surveying9
- Earthwork48
- CC Work36
- PCC Work with Plum8
- RCC Work12
- Bridge35
- Culvert5
- Canal Work5
- PVC Distribution System17
- Protection Work11
SHOW ALL 14 CHAPTERS
ARCHED / ESTIMATING
Pricing plastering against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.