R/ASSAM SOR 2023-24
Culvert rates
5 culvert items from the Assam Water Resources Department, effective 2023-04-01.
- Items
- 5
- Lowest rate
- ₹211.79
- Highest rate
- ₹897.84
- Effective from
- 2023-04-01
S-01/RATE ITEMS5 ITEMS
Culvert rates in the Assam Civil Works Schedule of Rates 2023-24 run from ₹211.79 to ₹897.84. Transcribed from Assam Water Resources (Irrigation) Department — Schedule of Rates (Civil Works) 2023-24. For reference only: verify against the official source before pricing a bid.
/
Unit
5 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 16.1 (i) | Cement pointing including racking out joints and curing etc, complete as directedIn proportion 1:3 | Sqm | 211.79 |
| 16.1 (ii) | Cement pointing including racking out joints and curing etc, complete as directedIn proportion 1:2 LABOUR FOR JOINING HUME PIPE | Sqm | 222.53 |
| 16.2 (i) | Labour for fitting and fixing hume pipe in position with collars including joining the cement mortar in proportion 1:3 and curing, including carrying the same from godown to site and complete as directedFor 30 cm to 60 cm dia | Rm | 374.09 |
| 16.2 (ii) | Labour for fitting and fixing hume pipe in position with collars including joining the cement mortar in proportion 1:3 and curing, including carrying the same from godown to site and complete as directedFor 60 cm to 90 cm dia | Rm | 555.57 |
| 16.2 (iii) | Labour for fitting and fixing hume pipe in position with collars including joining the cement mortar in proportion 1:3 and curing, including carrying the same from godown to site and complete as directedFor 90 cm to 120 cm dia | Rm | 897.84 |
S-02/SOURCE RECORD2023-24
- ISSUED BY
- Assam Water Resources Department
- EFFECTIVE
- 2023-04-01Financial year start. The schedule states only that it is for the year 2023-24 and effective from the date of publication; it prints no commencement date.
- RETRIEVED
- 2026-07-29
S-03/CHAPTERS14 MORE
Other chapters in this schedule
- Collection17
- Jungle Clearance11
- Surveying9
- Earthwork48
- CC Work36
- PCC Work with Plum8
- RCC Work12
- Plastering5
- Bridge35
- Canal Work5
- PVC Distribution System17
- Protection Work11
SHOW ALL 14 CHAPTERS
ARCHED / ESTIMATING
Pricing culvert against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.