Dismantling rates

12 dismantling items from the Assam Water Resources Department, effective 2023-04-01.
Items
12
Lowest rate
₹362.16
Highest rate
₹5,451.65
Effective from
2023-04-01
S-01/RATE ITEMS12 ITEMS

Dismantling rates in the Assam Civil Works Schedule of Rates 2023-24 run from ₹362.16 to ₹5,451.65. Transcribed from Assam Water Resources (Irrigation) Department — Schedule of Rates (Civil Works) 2023-24. For reference only: verify against the official source before pricing a bid.

Download the full schedule (Excel)All 22 chapters
Unit

12 items. Scroll the table to browse

DescriptionUnit
22.1For Bridge Labour for dismantling all member of the bridge (except piles) and stacking them at suitable place as directed. (All members will be under custody of the Contractors till taken over by the Department)Rm1,158.00
22.2 (A)(i)For Culvert — Dismantling the existing culvert including clearing and removing the dismantled materials to a safe place and stacking the serviceable material at a suitable place as directedIn Brick arch culvertCum1,608.48
22.2 (A)(ii)For Culvert — Dismantling the existing culvert including clearing and removing the dismantled materials to a safe place and stacking the serviceable material at a suitable place as directedIn RCC slab culvertCum2,346.96
22.2 (A)(iii)For Culvert — Dismantling the existing culvert including clearing and removing the dismantled materials to a safe place and stacking the serviceable material at a suitable place as directedIn ARMCO earthen pipe culvertRm821.53
22.2 (B)For CulvertDismantling the CC abutment wall and wing wall of upper portion of ground level including removing the debris from the site of works as directedRm662.42
22.3For Hume Pipe Labour charge for dismantling / replacing the old damaged hume pipe of 1200 mm dia of canal structure and carriage of the same upto a lead of 30 M and lift of 2.5 M and depositing the same in a safe distance as directedNos2,560.44
22.4For Boulder Sausage Dismantling of old serviciable hexagonal wire netting encased boulder sausage including hammering digging carrying, unlifting the boulders including carriage upto 60 M lead and upto 3.60 M lift including stacking in suitable and measurable stacks etc, complete as directedCum790.96
22.5 (A)For CanalLabour charge for dismantling of old CC works of canal structures and carriage the spoils and depositing the same in a safe distance as directed.: Carriage up to lead of 30 M and lift upto 1.50 MCum3,009.35
22.5 (B)For CanalLabour cost for dismantling of old CC canal lining and carriage of the materials and depositing the same in a safe distance as directed complete.: Carriage up to lead of 30 M and lift upto 1.50 MSqm362.16
22.5 (C)For CanalLabour charge for dismantling of old CC works of canal structures and carriage the spoils and depositing the same in a safe distance as directed.: Carriage up to lead of 60 M and lift upto 9 MCum4,683.86
22.5 (D)For CanalLabour cost for dismantling of old CC canal lining and carriage of the materials and depositing the same in a safe distance as directed complete: Carriage up to lead of 60 M and lift upto 9 MSqm697.06
22.6Labour for dismantling of old CC work and stacking the spoils at suitable place including local carriage, complete as directedCum5,451.65
S-02/SOURCE RECORD2023-24
ISSUED BY
Assam Water Resources Department
EFFECTIVE
2023-04-01Financial year start. The schedule states only that it is for the year 2023-24 and effective from the date of publication; it prints no commencement date.
RETRIEVED
2026-07-29
S-03/CHAPTERS14 MORE

Other chapters in this schedule

SHOW ALL 14 CHAPTERS
ARCHED / ESTIMATING

Pricing dismantling against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.