Assam SOR 2023-24
Dismantling rates
12 dismantling items from the Assam Water Resources Department, effective 2023-04-01.
Dismantling rates in the Assam Civil Works Schedule of Rates 2023-24 run from ₹362.16 to ₹5,451.65. Transcribed from Assam Water Resources (Irrigation) Department — Schedule of Rates (Civil Works) 2023-24. Reference only — verify against the official source before pricing a bid.
/
12 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 22.1 | For Bridge Labour for dismantling all member of the bridge (except piles) and stacking them at suitable place as directed. (All members will be under custody of the Contractors till taken over by the Department) | Rm | 1,158.00 |
| 22.2 (A)(i) | For Culvert — Dismantling the existing culvert including clearing and removing the dismantled materials to a safe place and stacking the serviceable material at a suitable place as directedIn Brick arch culvert | Cum | 1,608.48 |
| 22.2 (A)(ii) | For Culvert — Dismantling the existing culvert including clearing and removing the dismantled materials to a safe place and stacking the serviceable material at a suitable place as directedIn RCC slab culvert | Cum | 2,346.96 |
| 22.2 (A)(iii) | For Culvert — Dismantling the existing culvert including clearing and removing the dismantled materials to a safe place and stacking the serviceable material at a suitable place as directedIn ARMCO earthen pipe culvert | Rm | 821.53 |
| 22.2 (B) | For CulvertDismantling the CC abutment wall and wing wall of upper portion of ground level including removing the debris from the site of works as directed | Rm | 662.42 |
| 22.3 | For Hume Pipe Labour charge for dismantling / replacing the old damaged hume pipe of 1200 mm dia of canal structure and carriage of the same upto a lead of 30 M and lift of 2.5 M and depositing the same in a safe distance as directed | Nos | 2,560.44 |
| 22.4 | For Boulder Sausage Dismantling of old serviciable hexagonal wire netting encased boulder sausage including hammering digging carrying, unlifting the boulders including carriage upto 60 M lead and upto 3.60 M lift including stacking in suitable and measurable stacks etc, complete as directed | Cum | 790.96 |
| 22.5 (A) | For CanalLabour charge for dismantling of old CC works of canal structures and carriage the spoils and depositing the same in a safe distance as directed.: Carriage up to lead of 30 M and lift upto 1.50 M | Cum | 3,009.35 |
| 22.5 (B) | For CanalLabour cost for dismantling of old CC canal lining and carriage of the materials and depositing the same in a safe distance as directed complete.: Carriage up to lead of 30 M and lift upto 1.50 M | Sqm | 362.16 |
| 22.5 (C) | For CanalLabour charge for dismantling of old CC works of canal structures and carriage the spoils and depositing the same in a safe distance as directed.: Carriage up to lead of 60 M and lift upto 9 M | Cum | 4,683.86 |
| 22.5 (D) | For CanalLabour cost for dismantling of old CC canal lining and carriage of the materials and depositing the same in a safe distance as directed complete: Carriage up to lead of 60 M and lift upto 9 M | Sqm | 697.06 |
| 22.6 | Labour for dismantling of old CC work and stacking the spoils at suitable place including local carriage, complete as directed | Cum | 5,451.65 |
Other chapters in this schedule
Pricing dismantling against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.