R/ASSAM SOR 2023-24
PCC Work with Plum rates
8 pcc work with plum items from the Assam Water Resources Department, effective 2023-04-01.
- Items
- 8
- Lowest rate
- ₹6,137.69
- Highest rate
- ₹7,658.98
- Effective from
- 2023-04-01
S-01/RATE ITEMS8 ITEMS
PCC Work with Plum rates in the Assam Civil Works Schedule of Rates 2023-24 run from ₹6,137.69 to ₹7,658.98. Transcribed from Assam Water Resources (Irrigation) Department — Schedule of Rates (Civil Works) 2023-24. For reference only: verify against the official source before pricing a bid.
/
8 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 11.1 (A)(i) | PLAIN CC WORK WITH 40% PLUM HARD BOULDER IN PROPORTION — WITH HARD BLASTED BOULDERPlain CC work in 40% plum hard blasted boulder of 15 cm to 23 cm size and filled interstices with 60% cement concrete in proportion 1:3:6 with 13 mm to 38 mm size stone aggregate including curing, shuttering etc, complete as directed. (Shuttering cost will be paid separately) | Cum | 7,275.34 |
| 11.1 (A)(ii) | PLAIN CC WORK WITH 40% PLUM HARD BOULDER IN PROPORTION — WITH HARD BLASTED BOULDERPlain CC work in 40% plum hard blasted boulder of 15 cm to 23 cm size and filled interstices with 60% cement concrete in proportion 1:3:6 with 13 mm to 38 mm size stone aggregate including curing, dewatering shuttering etc, complete as directed. (Shuttering cost will be paid separately) | Cum | 7,658.98 |
| 11.1 (A)(iii) | PLAIN CC WORK WITH 40% PLUM HARD BOULDER IN PROPORTION — WITH HARD BLASTED BOULDERPlain CC work in 40% plum hard blasted boulder of 15 cm to 23 cm size and filled interstices with 60% cement concrete in proportion 1:3:6 with 13 mm to 38 mm size river shingles including curing, shuttering etc, complete as directed. (Cost of shuttering will be paid separately) | Cum | 6,387.06 |
| 11.1 (A)(iv) | PLAIN CC WORK WITH 40% PLUM HARD BOULDER IN PROPORTION — WITH HARD BLASTED BOULDERPlain CC work in 40% plum hard blasted boulder of 15 cm to 23 cm size and filled interstices with 60% cement concrete in proportion 1:3:6 with 13 mm to 38 mm size river shingles including curing, dewatering, shuttering etc, complete as directed. (Shuttering cost will be paid separately) | Cum | 6,770.71 |
| 11.1 (B)(i) | PLAIN CC WORK WITH 40% PLUM HARD BOULDER IN PROPORTION — WITH HARD RIVER BOULDERPlain CC work in 40% plum hard river boulder of 15 cm to 23 cm size and filled interstices with 60% cement concrete in proportion 1:3:6 with 13 mm to 38 mm size river shingles including curing, shuttering etc, complete as directed. (Shuttering cost will be paid separately) | Cum | 6,137.69 |
| 11.1 (B)(ii) | PLAIN CC WORK WITH 40% PLUM HARD BOULDER IN PROPORTION — WITH HARD RIVER BOULDERPlain CC work in 40% plum hard river boulder of 15 cm to 23 cm size and filled interstices with 60% cement concrete in proportion 1:3:6 with 13 mm to 38 mm size river shingles including curing, dewatering, shuttering etc, complete as directed. (Shuttering cost will be paid separately) | Cum | 6,521.34 |
| 11.1 (B)(iii) | PLAIN CC WORK WITH 40% PLUM HARD BOULDER IN PROPORTION — WITH HARD RIVER BOULDERPlain CC work in 40% plum hard river boulder of 15 cm to 23 cm size and filled interstices with 60% cement concrete in proportion 1:3:6 with 13 mm to 38 mm size stone aggregate including curing, shuttering etc. complete as directed. (Shuttering cost will be paid separately) | Cum | 7,025.97 |
| 11.1 (B)(iv) | PLAIN CC WORK WITH 40% PLUM HARD BOULDER IN PROPORTION — WITH HARD RIVER BOULDERPlain CC work in 40% plum hard river boulder of 15 cm to 23 cm size and filled interstices with 60% cement concrete in proportion 1:3:6 with 13 mm to 38 mm size stone aggregate including curing, dewatering shuttering etc, complete as directed. (Shuttering cost will be paid separately) | Cum | 7,409.62 |
S-02/SOURCE RECORD2023-24
- ISSUED BY
- Assam Water Resources Department
- EFFECTIVE
- 2023-04-01Financial year start. The schedule states only that it is for the year 2023-24 and effective from the date of publication; it prints no commencement date.
- RETRIEVED
- 2026-07-29
S-03/CHAPTERS14 MORE
Other chapters in this schedule
- Collection17
- Jungle Clearance11
- Surveying9
- Earthwork48
- CC Work36
- RCC Work12
- Plastering5
- Bridge35
- Culvert5
- Canal Work5
- PVC Distribution System17
- Protection Work11
SHOW ALL 14 CHAPTERS
ARCHED / ESTIMATING
Pricing pcc work with plum against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.