Mizoram Schedule of Rates (Volume I) 2019

702 rate items from the Mizoram PWD, effective 2019-02-01. Searchable, with Excel and CSV download.
Items reproduced
702
Chapters
24
Edition
2019
Effective from
2019-02-01
S-01/SOURCE RECORDRETRIEVED 2026-07-29
ISSUED BY
Mizoram PWD
EFFECTIVE
2019-02-01
RETRIEVED
2026-07-29

Transcribed from Mizoram PWD — Schedule of Rates 2019 (Volume I), effective 1 February 2019; rates are inclusive of GST for a 5 km lead within Aizawl. For reference only. Departments amend rates through correction slips between editions, so verify against the official source before pricing a bid. Items we could not transcribe unambiguously have been left out.

S-02/CHAPTERS24 CHAPTERS

Browse by chapter

702 items across 24 chapters. Each chapter is searchable and sortable.

S-03/SMALLER CHAPTERS7 ITEMS

Other items

7 items in 2 smaller chapters.

Chapter
Unit

7 items. Scroll the table to browse

DescriptionUnit
3.05(a)(i)Providing and mixing pidicrete CF 121 or equivalent to substantially increase the quality of concrete in cement mortar for concrete repair and lining, floor toppings, floor screeds etc, — Cement mortar 1:2Pedecrete CF 121Cum466.30
3.05(a)(ii)Providing and mixing pidicrete CF 121 or equivalent to substantially increase the quality of concrete in cement mortar for concrete repair and lining, floor toppings, floor screeds etc, — Cement mortar 1:2Pedecrete CF 51Cum530.00
3.05(b)(i)Providing and mixing pidicrete CF 121 or equivalent to substantially increase the quality of concrete in cement mortar for concrete repair and lining, floor toppings, floor screeds etc, — Cement mortar 1:3Pedecrete CF 121Cum349.70
3.05(b)(ii)Providing and mixing pidicrete CF 121 or equivalent to substantially increase the quality of concrete in cement mortar for concrete repair and lining, floor toppings, floor screeds etc, — Cement mortar 1:3Pedecrete CF 51Cum397.50
7.02Extra for regular coursed rubble masonry with hard stone in superstructure above floor two level for every two floors or part thereofCum598.80
7.14Dry stone pitching 22.50 cm thick including supply of stones and preparing surface completeSqm560.60
7.18Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete, abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structure with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specificationRmt635.70
S-04/HOW TO USEMIZORAM

How to use the Mizoram Schedule of Rates

The schedule of rates (volume i) sets the department's accepted rate for each item of work, and estimates for Mizoram government projects are built by mapping a project's Bill of Quantities to these items. Rates here run from ₹0.40 per litre to ₹6,019.70 per sqm, spanning 24 chapters from earthwork through to finishing trades.

Three things routinely go wrong. Estimators price against a superseded edition, because correction slips are published separately from the main schedule. They pick a nearly-similar item code rather than the exact one, which can pass an internal review and still be rejected by the department. And they miss that a rate is quoted for a different unit than the BOQ uses. A litre rate applied to a sqm quantity is a large error that looks reasonable on a spreadsheet.

For the schedules published by every other state, see the Schedule of Rates by state directory, and for how SOR items relate to a tender's BOQ, the guide to SOR vs BOQ.

ARCHED / ESTIMATING

Pricing a live tender against this schedule

Mapping a tender BOQ to the right SOR items by hand, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.