Mizoram Schedule of Rates (Volume I) 2019
- Items reproduced
- 702
- Chapters
- 24
- Edition
- 2019
- Effective from
- 2019-02-01
- ISSUED BY
- Mizoram PWD
- EFFECTIVE
- 2019-02-01
- RETRIEVED
- 2026-07-29
Transcribed from Mizoram PWD — Schedule of Rates 2019 (Volume I), effective 1 February 2019; rates are inclusive of GST for a 5 km lead within Aizawl. For reference only. Departments amend rates through correction slips between editions, so verify against the official source before pricing a bid. Items we could not transcribe unambiguously have been left out.
Browse by chapter
702 items across 24 chapters. Each chapter is searchable and sortable.
- 01Preparatory Works - Jungle Clearance8
- 02Earthwork35
- 03Plain Cement Concrete5
- 04Reinforced Cement Concrete13
- 05Brickworks8
- 06Marble and Granite Works9
- 07Wood & PVC Works33
- 08Steel Works12
- 09Aluminium Works28
- 10Flooring15
- 11Walling11
- 12Doors & Windows Fittings106
- 13Ceiling25
- 14Roofing19
- 15Sanitary Installations25
- 16Water Supply112
- 17Water Proofing19
- 18Finishing61
- 19Horticulture & Landscaping14
- 20Fencing5
- 21Repairs to Buildings92
- 22Dismantling & Demolishing40
Other items
7 items in 2 smaller chapters.
7 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 3.05(a)(i) | Providing and mixing pidicrete CF 121 or equivalent to substantially increase the quality of concrete in cement mortar for concrete repair and lining, floor toppings, floor screeds etc, — Cement mortar 1:2Pedecrete CF 121 | Cum | 466.30 |
| 3.05(a)(ii) | Providing and mixing pidicrete CF 121 or equivalent to substantially increase the quality of concrete in cement mortar for concrete repair and lining, floor toppings, floor screeds etc, — Cement mortar 1:2Pedecrete CF 51 | Cum | 530.00 |
| 3.05(b)(i) | Providing and mixing pidicrete CF 121 or equivalent to substantially increase the quality of concrete in cement mortar for concrete repair and lining, floor toppings, floor screeds etc, — Cement mortar 1:3Pedecrete CF 121 | Cum | 349.70 |
| 3.05(b)(ii) | Providing and mixing pidicrete CF 121 or equivalent to substantially increase the quality of concrete in cement mortar for concrete repair and lining, floor toppings, floor screeds etc, — Cement mortar 1:3Pedecrete CF 51 | Cum | 397.50 |
| 7.02 | Extra for regular coursed rubble masonry with hard stone in superstructure above floor two level for every two floors or part thereof | Cum | 598.80 |
| 7.14 | Dry stone pitching 22.50 cm thick including supply of stones and preparing surface complete | Sqm | 560.60 |
| 7.18 | Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete, abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structure with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification | Rmt | 635.70 |
How to use the Mizoram Schedule of Rates
The schedule of rates (volume i) sets the department's accepted rate for each item of work, and estimates for Mizoram government projects are built by mapping a project's Bill of Quantities to these items. Rates here run from ₹0.40 per litre to ₹6,019.70 per sqm, spanning 24 chapters from earthwork through to finishing trades.
Three things routinely go wrong. Estimators price against a superseded edition, because correction slips are published separately from the main schedule. They pick a nearly-similar item code rather than the exact one, which can pass an internal review and still be rejected by the department. And they miss that a rate is quoted for a different unit than the BOQ uses. A litre rate applied to a sqm quantity is a large error that looks reasonable on a spreadsheet.
For the schedules published by every other state, see the Schedule of Rates by state directory, and for how SOR items relate to a tender's BOQ, the guide to SOR vs BOQ.
Pricing a live tender against this schedule
Mapping a tender BOQ to the right SOR items by hand, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.