Skip to main content
R/MIZORAM SOR 2019

Brickworks rates

8 brickworks items from the Mizoram PWD, effective 2019-02-01.
Items
8
Lowest rate
₹74.10
Highest rate
₹965.00
Effective from
2019-02-01
S-01/RATE ITEMS8 ITEMS

Brickworks rates in the Mizoram Schedule of Rates (Volume I) 2019 run from ₹74.10 to ₹965.00. Transcribed from Mizoram PWD — Schedule of Rates 2019 (Volume I), effective 1 February 2019; rates are inclusive of GST for a 5 km lead within Aizawl. For reference only: verify against the official source before pricing a bid.

Download the full schedule (Excel)All 24 chapters
Unit

8 items. Scroll the table to browse

DescriptionUnit
6.07Extra for providing and placing in position 2 nos 6mm dia. MS bars at every third course of half brick masonrySqm75.70
6.08Honey-comb half brick masonry with first class brick in foundation upto one storey above and below ground level including curing, etc. complete. a) in cement mortar 1: 3 ( 1 cement: 3 coarse sand ) b) in cement mortar 1: 4 ( 1 cement: 4 coarse sand )Sqm965.00
6.10Extra for 7.5 cm thick brick masonry in superstructure above floor two level for every two floors or part thereofSqm74.10
6.11Extra for providing and placing in position 2 nos 6mm dia. MS bars at every third course of 7.5 cm thick brick masonrySqm77.50
6.13Extra for forming cavity 5cm to 7.5cm wide in cavity walls with necessary weep and vent holes including use of cores and cost of providing and fixing bitumastic coated M.S. ties 300mm long of 25x3mm section at not less than 3 ties per sqm as per approved designSqm166.10
6.16Extra for additional cost of centring for arches exceeding 6m span including all shuttering, bolting, wedging and removal (Area of the soffit to be measured)Sqm276.70
6.19Brick edging laid lengthwise with 2nd Class half brick depth including excavation, refilling and disposal of surplus earth lead upto 50 metresRmt85.70
6.21Brick edging 7cm wide 11.4cm deep to plinth protection with First Class Bricks including grouting with cement mortar 1:4 (1 cement: 4 fine sand)Rmt117.80
S-02/SOURCE RECORD2019
ISSUED BY
Mizoram PWD
EFFECTIVE
2019-02-01
RETRIEVED
2026-07-29
S-03/CHAPTERS21 MORE

Other chapters in this schedule

SHOW ALL 21 CHAPTERS
ARCHED / ESTIMATING

Pricing brickworks against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.