Brickworks rates
8 brickworks items from the Mizoram PWD, effective 2019-02-01.
Brickworks rates in the Mizoram Schedule of Rates (Volume I) 2019 run from ₹74.10 to ₹965.00. Transcribed from Mizoram PWD — Schedule of Rates 2019 (Volume I), effective 1 February 2019; rates are inclusive of GST for a 5 km lead within Aizawl. Reference only — verify against the official source before pricing a bid.
/
8 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 6.07 | Extra for providing and placing in position 2 nos 6mm dia. MS bars at every third course of half brick masonry | Sqm | 75.70 |
| 6.08 | Honey-comb half brick masonry with first class brick in foundation upto one storey above and below ground level including curing, etc. complete. a) in cement mortar 1: 3 ( 1 cement: 3 coarse sand ) b) in cement mortar 1: 4 ( 1 cement: 4 coarse sand ) | Sqm | 965.00 |
| 6.10 | Extra for 7.5 cm thick brick masonry in superstructure above floor two level for every two floors or part thereof | Sqm | 74.10 |
| 6.11 | Extra for providing and placing in position 2 nos 6mm dia. MS bars at every third course of 7.5 cm thick brick masonry | Sqm | 77.50 |
| 6.13 | Extra for forming cavity 5cm to 7.5cm wide in cavity walls with necessary weep and vent holes including use of cores and cost of providing and fixing bitumastic coated M.S. ties 300mm long of 25x3mm section at not less than 3 ties per sqm as per approved design | Sqm | 166.10 |
| 6.16 | Extra for additional cost of centring for arches exceeding 6m span including all shuttering, bolting, wedging and removal (Area of the soffit to be measured) | Sqm | 276.70 |
| 6.19 | Brick edging laid lengthwise with 2nd Class half brick depth including excavation, refilling and disposal of surplus earth lead upto 50 metres | Rmt | 85.70 |
| 6.21 | Brick edging 7cm wide 11.4cm deep to plinth protection with First Class Bricks including grouting with cement mortar 1:4 (1 cement: 4 fine sand) | Rmt | 117.80 |
Other chapters in this schedule
- Preparatory Works - Jungle Clearance (8)
- Earthwork (35)
- Plain Cement Concrete (5)
- Reinforced Cement Concrete (13)
- Marble and Granite Works (9)
- Wood & PVC Works (33)
- Steel Works (12)
- Aluminium Works (28)
- Flooring (15)
- Walling (11)
- Doors & Windows Fittings (106)
- Ceiling (25)
- Roofing (19)
- Sanitary Installations (25)
- Water Supply (112)
- Water Proofing (19)
- Finishing (61)
- Horticulture & Landscaping (14)
- Fencing (5)
- Repairs to Buildings (92)
- Dismantling & Demolishing (40)
Pricing brickworks against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works