Reinforced Cement Concrete rates
13 reinforced cement concrete items from the Mizoram PWD, effective 2019-02-01.
- Items
- 13
- Lowest rate
- ₹48.70
- Highest rate
- ₹609.80
- Effective from
- 2019-02-01
S-01/RATE ITEMS13 ITEMS
Reinforced Cement Concrete rates in the Mizoram Schedule of Rates (Volume I) 2019 run from ₹48.70 to ₹609.80. Transcribed from Mizoram PWD — Schedule of Rates 2019 (Volume I), effective 1 February 2019; rates are inclusive of GST for a 5 km lead within Aizawl. For reference only: verify against the official source before pricing a bid.
/
Unit
13 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 5.09 | Extra for plain and reinforced cement concrete works in superstructure above floor five level for every floor or part thereof | Cum | 609.80 |
| 5.10(a) | Centering and shuttering including strutting, propping etc. and removal of form for all heightsFoundations, footings, bases of columns etc. for mass concrete | Sqm | 359.10 |
| 5.10(b) | Centering and shuttering including strutting, propping etc. and removal of form for all heightsWalls including attached pillasters, buttresses, string courses, etc | Sqm | 512.00 |
| 5.11 | Smooth finishing of the exposed surface of RCC work with 6mm thick cement mortar 1:3 (1cement: 3fine sand) | Sqm | 222.50 |
| 5.12 | Applying cement slurry on RCC slabs or on cement concrete work using 2.75 kg/sqm for receiving cement concrete floor including roughening, clearing etc. complete | Sqm | 52.60 |
| 5.19 | Extra for rendering smooth the top of suspended floors, landings and staircases (treads and risers) with cement mortar 1:2 (1 cement: 2 coarse sand) including a floating coat of neat cement and protecting the surface with a layer of 7.5 cm of earth laid over 15 mm of fine sand in case of suspended floor and bricks laid in mud mortar in case of landings and steps including subsequent removal and cleaning of the same | Sqm | 201.20 |
| 5.21 | Providing and fixing in position copper plate as per design for expansion joints | KG | 285.20 |
| 5.25 | Add for plaster drip course / groove in plastered surface or moulding to RCC projections | Rmt | 48.70 |
| 5.26 | Extra for laying reinforced cement concrete in or under water and/ or liquid mud including cost of pumping or bailing out water and removing slush etc., complete | Cum | 553.90 |
| 5.27 | Extra for laying reinforced cement concrete in or under foul positions | Cum | 192.80 |
| 5.29 | Extra for R.C.C. work above floor V level for each four floors or part thereof | Cum | 609.80 |
| 5.30(a) | Extra for providing richer or leaner mixes respectively at all floor levelsProviding M-25 grade concrete instead of M-20 grade BMC/ RMC. (Note:- Cement content considered in M-25 is @ 330 kg/cum) | Cum | 122.00 |
| 5.30(b) | Extra for providing richer or leaner mixes respectively at all floor levelsProviding M-30 grade concrete instead of M-20 grade BMC/ RMC. (Note: Cement content considered in M-30 is @ 340 kg/ cum) ( c) Providing M-35 grade concrete instead of M-20 grade BMC/ RMC.(Note: Cement content considered in M-35 is @ 350 kg/ cum) | Cum | 244.00 |
S-02/SOURCE RECORD2019
- ISSUED BY
- Mizoram PWD
- EFFECTIVE
- 2019-02-01
- RETRIEVED
- 2026-07-29
S-03/CHAPTERS21 MORE
Other chapters in this schedule
ARCHED / ESTIMATING
Pricing reinforced cement concrete against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.