13 reinforced cement concrete items from the Mizoram PWD, effective 2019-02-01.

Reinforced Cement Concrete rates in the Mizoram Schedule of Rates (Volume I) 2019 run from ₹48.70 to ₹609.80. Transcribed from Mizoram PWD — Schedule of Rates 2019 (Volume I), effective 1 February 2019; rates are inclusive of GST for a 5 km lead within Aizawl. Reference only — verify against the official source before pricing a bid.

13 items — scroll the table to browse

DescriptionUnit
5.09Extra for plain and reinforced cement concrete works in superstructure above floor five level for every floor or part thereofCum609.80
5.10(a)Centering and shuttering including strutting, propping etc. and removal of form for all heightsFoundations, footings, bases of columns etc. for mass concreteSqm359.10
5.10(b)Centering and shuttering including strutting, propping etc. and removal of form for all heightsWalls including attached pillasters, buttresses, string courses, etcSqm512.00
5.11Smooth finishing of the exposed surface of RCC work with 6mm thick cement mortar 1:3 (1cement: 3fine sand)Sqm222.50
5.12Applying cement slurry on RCC slabs or on cement concrete work using 2.75 kg/sqm for receiving cement concrete floor including roughening, clearing etc. completeSqm52.60
5.19Extra for rendering smooth the top of suspended floors, landings and staircases (treads and risers) with cement mortar 1:2 (1 cement: 2 coarse sand) including a floating coat of neat cement and protecting the surface with a layer of 7.5 cm of earth laid over 15 mm of fine sand in case of suspended floor and bricks laid in mud mortar in case of landings and steps including subsequent removal and cleaning of the sameSqm201.20
5.21Providing and fixing in position copper plate as per design for expansion jointsKG285.20
5.25Add for plaster drip course / groove in plastered surface or moulding to RCC projectionsRmt48.70
5.26Extra for laying reinforced cement concrete in or under water and/ or liquid mud including cost of pumping or bailing out water and removing slush etc., completeCum553.90
5.27Extra for laying reinforced cement concrete in or under foul positionsCum192.80
5.29Extra for R.C.C. work above floor V level for each four floors or part thereofCum609.80
5.30(a)Extra for providing richer or leaner mixes respectively at all floor levelsProviding M-25 grade concrete instead of M-20 grade BMC/ RMC. (Note:- Cement content considered in M-25 is @ 330 kg/cum)Cum122.00
5.30(b)Extra for providing richer or leaner mixes respectively at all floor levelsProviding M-30 grade concrete instead of M-20 grade BMC/ RMC. (Note: Cement content considered in M-30 is @ 340 kg/ cum) ( c) Providing M-35 grade concrete instead of M-20 grade BMC/ RMC.(Note: Cement content considered in M-35 is @ 350 kg/ cum)Cum244.00

Pricing reinforced cement concrete against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works