Dismantling & Demolishing rates

40 dismantling & demolishing items from the Mizoram PWD, effective 2019-02-01.

Dismantling & Demolishing rates in the Mizoram Schedule of Rates (Volume I) 2019 run from ₹1.30 to ₹885.90. Transcribed from Mizoram PWD — Schedule of Rates 2019 (Volume I), effective 1 February 2019; rates are inclusive of GST for a 5 km lead within Aizawl. Reference only — verify against the official source before pricing a bid.

40 items — scroll the table to browse

DescriptionUnit
24.01(b)Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - chargeNominal concrete 1:4:8 or leaner mixCum654.20
24.04Extra for cutting reinforcement bars in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work)Sqm672.00
24.05Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. workKG5.60
24.06(a)Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres leadIn cement mortarCum885.90
24.10(a)Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured)In cement mortarCum306.30
24.16(a)Dismantling Steel work in single section including dismembering and stacking within 50 meters lead inR.S. JoistsKG1.80
24.16(b)Dismantling Steel work in single section including dismembering and stacking within 50 meters lead inChannels, angles, tees and flatsKG1.30
24.17Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50metres leadKG3.00
24.18Dismantling steel work in built-up sections without dismembering and stacking within 50 metres leadKG1.90
24.22(a)Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres leadFor thickness of tiles 10 mm to 25 mmSqm35.80
24.22(b)Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres leadFor thickness of tiles above 25mm and upto 40mmSqm55.40
24.23Demolishing dry brick pitching in floors, drains etc. including stacking serviceable material and disposal of unserviceable material within 50 metres leadCum553.10
24.24Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres leadSqm121.70
24.25Demolishing brick tile covering in terracing including stacking of serviceable material and disposal of unserviceable material within 50 metres leadSqm51.30
24.26(a)Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 metres lead ofG.S. SheetSqm83.00
24.26(b)Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 metres lead ofAsbestos sheetSqm40.80
24.27Dismantling jack arch roofing and floors including stacking of serviceable material and disposal of unserviceable material within 50 metres leadSqm113.50
24.28Dismantling tiled roofing with battens boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres leadSqm99.50
24.29Demolishing thatch roofing including mats, bamboo, jaffari etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres leadSqm29.20
24.30Dismantling wooden ballies in posts and struts including stacking within 50 metres leadRmt8.80
24.31(a)Dismantling and stacking within 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base ofT ’ or ‘ L ’ iron or pipeNos247.71
24.31(b)Dismantling and stacking within 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base ofR.C.CNos343.40
24.32Cutting ballies or wooden posts of fencing at the point of projection above the concrete or ground and stacking the same within 50 metres leadNos46.40
24.33Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres leadKG16.90
24.34Dismantling wooden trellis work excluding frames but including stacking the serviceable material within 50 metres leadSqm30.60
24.35Dismantling expanded metal or I.R.C. fabrics with necessary battens and beading including stacking the serviceable material within 50 metres leadSqm37.20
24.36(b)Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres leadThickness above 10 mm upto 25 mmSqm40.90
24.36(c)Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres leadThickness above 25 mm upto 40 mmSqm52.70
24.37(a)Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 metres leadThickness upto 40 mmSqm139.80
24.37(b)Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 metres leadThickness above 40 mm upto 75 mmSqm208.30
24.38Dismantling cement asbestos, Celotax or other hard board ceiling or partition walls including stacking of serviceable materials and disposal of unserviceable materials within 50 metres leadRmt30.00
24.39(a)Dismantling including stacking of serviceable material and disposal of unserviceable material within 50metres leadWater bound macadam roadSqm116.80
24.40(a)Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, including stacking of pipes within 50 metres lead15 mm to 40 mm nominal boreRmt97.50
24.41Dismantling of flushing cistern of any size including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres leadNos693.70
24.42(a)Dismantling of cement concrete platform along with curtain walls and base concrete etc. including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead120 x 120 cm (outside to outside)Nos477.60
24.42(b)Dismantling of cement concrete platform along with curtain walls and base concrete etc. including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead210 x 120 cm (outside to outside)Nos735.20
24.43Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres leadSqm24.80
24.44Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable surplus material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-chargeSqm31.60
24.45Dismantling W.C. Pan of all sizes including disposal of dismantled materials all complete as per directions of Engineer-in-ChargeSqm80.40
24.46Hacking of CC flooring including cleaning for surface etc. complete as per direction of the Engineer-in-ChargeSqm36.20

Pricing dismantling & demolishing against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.