Mizoram SOR 2019
Ceiling rates
25 ceiling items from the Mizoram PWD, effective 2019-02-01.
Ceiling rates in the Mizoram Schedule of Rates (Volume I) 2019 run from ₹43.00 to ₹878.70. Transcribed from Mizoram PWD — Schedule of Rates 2019 (Volume I), effective 1 February 2019; rates are inclusive of GST for a 5 km lead within Aizawl. Reference only — verify against the official source before pricing a bid.
/
25 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 15.01(a) | Providing and fixing plain, chamfered edged 1st class local wood beading with screws or nails for walls, ceiling, etc. complete50mm x 12mm | Rmt | 304.40 |
| 15.01(b) | Providing and fixing plain, chamfered edged 1st class local wood beading with screws or nails for walls, ceiling, etc. complete50mm x 20mm WOOD | Rmt | 229.30 |
| 15.06 | Supplying, fitting and fixing 4mm thick plain asbestos cement sheet ceiling with nescessary nails complete excluding frame work of base and beading | Sqm | 493.40 |
| 15.07 | Providing and fixing of bamboo turja ceiling woven in malkalh pattern in single layer including fixing with nescessary nails complete excluding frame work of base and beading | Sqm | 213.80 |
| 15.08 | Providing and fixing of bamboo turja ceiling woven in bawhtah pattern in single layer including fixing with nescessary nails complete excluding frame work of base and beading | Sqm | 279.30 |
| 15.09 | Providing and fixing of bamboo turja ceiling woven in thumbawh pattern in single layer including fixing with nescessary nails complete excluding frame work of base and beading | Sqm | 321.50 |
| 15.15 | Providing and fixing in ceiling flat pressed 3 layer particle board (medium density) 12mm thick conforming to IS: 3087 with necessary nails etc. complete (frame work of base to be paid separately) | Sqm | 750.30 |
| 15.24(a)(i) | Providing and fixing insulating board ceiling of approved quality with necessary nails etc. complete (frame work to be paid separately) — Natural colour insulating board12 mm thick | Sqm | 745.60 |
| 15.24(a)(ii) | Providing and fixing insulating board ceiling of approved quality with necessary nails etc. complete (frame work to be paid separately) — Natural colour insulating board18 mm thick | Sqm | 825.10 |
| 15.24(b)(i) | Providing and fixing insulating board ceiling of approved quality with necessary nails etc. complete (frame work to be paid separately) — White face insulating board12 mm thick | Sqm | 778.50 |
| 15.25(a) | Extra for Circular cutting and waste in ceiling withTeak wood planks 20 mm thick | Rmt | 353.70 |
| 15.25(b)(i) | Extra for Circular cutting and waste in ceiling with — Natural colour insulating board12 mm thick | Rmt | 362.50 |
| 15.25(b)(i) | Extra for Circular cutting and waste in ceiling with — Natural colour insulating board18 mm thick | Rmt | 381.40 |
| 15.25(c)(i) | Extra for Circular cutting and waste in ceiling with — White face insulating board12 mm thick | Rmt | 375.70 |
| 15.25(c)(ii) | Extra for Circular cutting and waste in ceiling with — White face insulating board18 mm thick | Rmt | 347.00 |
| 15.25(d)(i) | Extra for Circular cutting and waste in ceiling with — Flame retardant face insulating board12 mm thick | Rmt | 314.70 |
| 15.25(d)(ii) | Extra for Circular cutting and waste in ceiling with — Flame retardant face insulating board18 mm thick | Rmt | 336.80 |
| 15.26 | Extra for providing and fixing ceiling to curved surfaces in narrow widths | Sqm | 232.30 |
| 15.27 | Providing and fixing false ceiling with 12 mm thick plain/or with design ceiling tiles of BWP type phenol formaldehyde synthetic resin bonded pressed particle board conforming to IS:3087 finished with a coat of aluminium primer on both sides & edges and two coats of synthetic enamel paint of approved quality on exposed face fixed to a grid made out of anodised aluminium(with 15 micron anodic coating) T-sections 35 x15x1.5 mm size main runners and cross runners 23.5x19x1.5 mm fixed to main runners placed 600 mm centre to centre both ways so as to form a grid of 600 mm square. The frame work shall be suspended from ceiling by level adjusting hangers of 6 mm dia M.S rod fixed to roof slab by means of ceiling cleats. The suspenders shall be placed 600x 1200 mm centre to centre including fixing to the frame with C.P brace screws and applying a priming coat of zinc chromate yellow primer | Sqm | 515.30 |
| 15.28 | Extra for using 12mm thick semi perforated ceiling tiles instead of 12mm thick plain ceiling tiles in item above | Sqm | 43.00 |
| 15.30 | Extra for any sunk or raised mouldings in the plaster of Paris (Gypsum anhydrous) ceiling | Sqm | 878.70 |
| 15.31 | Extra for providing plaster of Paris (Gypsum anhydrous) ceiling above 5 metres height from floor level | Sqm | 160.30 |
| 15.33 | Providing and fixing thermal insulation of ceiling (under deck insulation) with Resin Bonded Fibre glass wool conforming to IS: 8183 (Twiga Insul 1000/ 50mm or equivalent) density 24kg/m3, 50mm thick, wrapped in 200 G Virgin Polythene bags fixed to ceiling with metallic cleats (50x50x3 mm) @ 60 cm and wire mesh of 12.5mm x 24g wire and mesh, for top most ceiling of building | Sqm | 604.90 |
| 15.34 | Providing and fixing thermal insulation with Resin Bonded Fibre glass wool conforming to IS: 8183 (Twiga Insul 1000/ 50mm or equivalent). Density 16kg/m3, 50mm thick, wrapped in 200G Virgin Polythene bags placed over existing false ceiling and held in position by criss-crossing GI wire | Sqm | 277.60 |
| 15.36 | Supplying, fitting and fixing PVC board ceiling with nescessary screws etc. complete excluding frame work of base and beading | Sqm | 639.90 |
Other chapters in this schedule
- Preparatory Works - Jungle Clearance (8)
- Earthwork (35)
- Plain Cement Concrete (5)
- Reinforced Cement Concrete (13)
- Brickworks (8)
- Marble and Granite Works (9)
- Wood & PVC Works (33)
- Steel Works (12)
- Aluminium Works (28)
- Flooring (15)
- Walling (11)
- Doors & Windows Fittings (106)
- Roofing (19)
- Sanitary Installations (25)
- Water Supply (112)
- Water Proofing (19)
- Finishing (61)
- Horticulture & Landscaping (14)
- Fencing (5)
- Repairs to Buildings (92)
- Dismantling & Demolishing (40)
Pricing ceiling against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.