S-01/RATE ITEMS14 ITEMS
Horticulture & Landscaping rates in the Mizoram Schedule of Rates (Volume I) 2019 run from ₹4.80 to ₹677.10. Transcribed from Mizoram PWD — Schedule of Rates 2019 (Volume I), effective 1 February 2019; rates are inclusive of GST for a 5 km lead within Aizawl. For reference only: verify against the official source before pricing a bid.
/
Unit
14 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 21.01 | Trenching in ordinary soil upto a depth of 60cm including removal and stacking of serviceable materials and then disposing off by spreading and neatly leveling within a lead of 50m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge and/or manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure) | Cum | 92.50 |
| 21.02 | Supplying and stacking of good earth at site including royalty and carriage upto 1 km ( earth measured in stacks will be reduced by 20% for payment) | Cum | 677.10 |
| 21.03 | Supplying and stacking sludge at site including royalty and carriage upto 5 k.m. lead complete (sludge measured in stacks will be reduced by 8% for payment) | Cum | 458.30 |
| 21.04(a) | Supplying and stacking at site dump manure from approved source, including carriage upto 5 k.m. lead complete (manure measured in stacks will be reduced by 8% for payment)Screened through sieve of I.S. designation 20mm | Cum | 525.90 |
| 21.04(b) | Supplying and stacking at site dump manure from approved source, including carriage upto 5 k.m. lead complete (manure measured in stacks will be reduced by 8% for payment)Screened through sieve of I.S. designation 16mm | Cum | 549.10 |
| 21.04(c) | Supplying and stacking at site dump manure from approved source, including carriage upto 5 k.m. lead complete (manure measured in stacks will be reduced by 8% for payment)Screened through sieve of I.S. designation 4.75mm | Cum | 567.70 |
| 21.05 | Rough dressing the trenched ground including breaking clods | Sqm | 108.90 |
| 21.09 | Mixing earth and sludge or manure in proportion specified or directed | Cum | 21.80 |
| 21.14(a) | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume ( 2 parts of stacked volume of earth after reduction by 20%; 1 part of stacked volume of earth after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately)Holes 1.2 m dia and 1.2 m deep | Nos | 660.80 |
| 21.14(b) | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume ( 2 parts of stacked volume of earth after reduction by 20%; 1 part of stacked volume of earth after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately)Holes 60 cm dia and 60 cm deep | Nos | 93.30 |
| 21.20 | Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material lead upto 50m and lift upto 1.5m disposed material to be neatly dressed | Cum | 304.90 |
| 21.21 | Excavation in bajri path including stacking of serviceable and unserviceable material lead upto 50 m and lift upto 1.5m disposed material to be neatly dressed | Cum | 342.10 |
| 21.22 | Excavation in water bound macadam road including stacking the serviceable and unserviceable material separately and disposal of unserviceable material lead upto 50m and lift upto 1.5 m disposed material to be neatly dressed | Cum | 421.10 |
| 21.23 | Flooding the ground with water including making kiaries and dismantling the same | Sqm | 4.80 |
S-02/SOURCE RECORD2019
- ISSUED BY
- Mizoram PWD
- EFFECTIVE
- 2019-02-01
- RETRIEVED
- 2026-07-29
S-03/CHAPTERS21 MORE
Other chapters in this schedule
ARCHED / ESTIMATING
Pricing horticulture & landscaping against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.