Mizoram SOR 2019
Preparatory Works - Jungle Clearance rates
8 preparatory works - jungle clearance items from the Mizoram PWD, effective 2019-02-01.
Preparatory Works - Jungle Clearance rates in the Mizoram Schedule of Rates (Volume I) 2019 run from ₹3.00 to ₹252.90. Transcribed from Mizoram PWD — Schedule of Rates 2019 (Volume I), effective 1 February 2019; rates are inclusive of GST for a 5 km lead within Aizawl. Reference only — verify against the official source before pricing a bid.
8 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 1.01 | Clearing grass and removal of rubbish upto a distance of 50 metres outside the periphery of the area cleared. By Manual means | Sqm | 6.80 |
| 1.02(a)(i) | Clearing and grubbing road land including uprooting rank vegetation, grass, brush shrubs, saplings and trees of girth upto 300 mm, removal of stumps, disposal of unserviceable material and stacking of serviceable material upto 100 metres from road boundary — By manual meansIn area of light jungle | Sqm | 9.10 |
| 1.02(a)(ii) | Clearing and grubbing road land including uprooting rank vegetation, grass, brush shrubs, saplings and trees of girth upto 300 mm, removal of stumps, disposal of unserviceable material and stacking of serviceable material upto 100 metres from road boundary — By manual meansIn area of thorny jungle | Sqm | 13.60 |
| 1.02(b) | Clearing and grubbing road land including uprooting rank vegetation, grass, brush shrubs, saplings and trees of girth upto 300 mm, removal of stumps, disposal of unserviceable material and stacking of serviceable material upto 100 metres from road boundaryBy Mechanical means. (for all classes of jungle) | Sqm | 3.00 |
| 1.03(a)(i) | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50 metres outside the periphery of the area cleared — By manual meansLight jungle | Sqm | 7.00 |
| 1.03(a)(ii) | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50 metres outside the periphery of the area cleared — By manual meansMedium jungle | Sqm | 10.60 |
| 1.03(a)(iii) | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50 metres outside the periphery of the area cleared — By manual meansHeavy jungle | Sqm | 14.10 |
| 1.04(a) | Felling trees of girth (measured at a height of 1m above ground level) including cutting of trunks and branches and removing the roots and stacking of serviceable material and disposal of unserviceable material with all lifts and upto a lead of 100 metres and earth filling in the depression/pitG irth from 30 cm to 60 cm | Nos | 252.90 |
Other chapters in this schedule
- Earthwork (35)
- Plain Cement Concrete (5)
- Reinforced Cement Concrete (13)
- Brickworks (8)
- Marble and Granite Works (9)
- Wood & PVC Works (33)
- Steel Works (12)
- Aluminium Works (28)
- Flooring (15)
- Walling (11)
- Doors & Windows Fittings (106)
- Ceiling (25)
- Roofing (19)
- Sanitary Installations (25)
- Water Supply (112)
- Water Proofing (19)
- Finishing (61)
- Horticulture & Landscaping (14)
- Fencing (5)
- Repairs to Buildings (92)
- Dismantling & Demolishing (40)
Pricing preparatory works - jungle clearance against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works