12 steel works items from the Mizoram PWD, effective 2019-02-01.

Steel Works rates in the Mizoram Schedule of Rates (Volume I) 2019 run from ₹86.40 to ₹921.50. Transcribed from Mizoram PWD — Schedule of Rates 2019 (Volume I), effective 1 February 2019; rates are inclusive of GST for a 5 km lead within Aizawl. Reference only — verify against the official source before pricing a bid.

12 items — scroll the table to browse

DescriptionUnit
10.02Providing and fixing ball bearing for rolling shuttersNos300.10
10.03(a)Extra for providing mechanical device, chain and crank operation for operating rolling shuttersExceeding 10.00 sqm and upto 16.80 sqm in area. (average say 14.00 sqm)Sqm722.20
10.03(b)Extra for providing mechanical device, chain and crank operation for operating rolling shuttersExceeding 16.80 sqm in areaSqm921.50
10.07Structural steel work rivetted, bolted welded in built up sections, trusses and framed works, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (In Tees, R.S. Joists, Angles, Flats and Channels.)KG215.10
10.08Steel work in built up tubular (round, square or rectangular hollow tubes etc.)trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. completeKG176.40
10.10(a)Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. (round, square or rectangular hollow tubes etc.)MS tube 40mm @ 3.6 Kg/mKG178.20
10.10(a)Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. (round, square or rectangular hollow tubes etc.)GI tube 40mm @ 3.72 Kg/mKG189.70
10.12Providing and fixing a pair of flat iron brackets in concrete work while laying for jointing with timber post etc. including cost of bolts and nuts completePair164.40
10.13Providing and fixing M.S. round or square bars without M.S flats at required spacings in wooden frame of windows and clerestory windowsKG90.60
10.14Providing and fixing M.S. round or square bars with M.S flats at required spacings in wooden frame of windows and clerestory windowsKG86.40
10.16(a)Steel work welded in built up sections/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as requiredIn stringers, treads, landings etc. of stair-cases including use of chequered plates wherever required all completeKG159.90
10.17Structural steel work in single section fixed with or without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all completeKG122.80

Pricing steel works against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.