Fencing rates

5 fencing items from the Mizoram PWD, effective 2019-02-01.
Items
5
Lowest rate
₹104.20
Highest rate
₹964.40
Effective from
2019-02-01
S-01/RATE ITEMS5 ITEMS

Fencing rates in the Mizoram Schedule of Rates (Volume I) 2019 run from ₹104.20 to ₹964.40. Transcribed from Mizoram PWD — Schedule of Rates 2019 (Volume I), effective 1 February 2019; rates are inclusive of GST for a 5 km lead within Aizawl. For reference only: verify against the official source before pricing a bid.

Download the full schedule (Excel)All 24 chapters

5 items. Scroll the table to browse

DescriptionUnit
22.04(a)1.0m high plastic net fencing with 1.5m angle iron posts 40 x 40 x 6mm size placed at 2.5m apart embedded in cement concrete block 1:3:6 (1 cement: 3 sand: 6 stone aggegate) of size 25 x 25 x 60 cm with necessary fittings including earthwork completePerimeter fencing 2MWRmt964.40
22.04(b)1.0m high plastic net fencing with 1.5m angle iron posts 40 x 40 x 6mm size placed at 2.5m apart embedded in cement concrete block 1:3:6 (1 cement: 3 sand: 6 stone aggegate) of size 25 x 25 x 60 cm with necessary fittings including earthwork completeSGP - 16 41" MWRmt757.80
22.05(a)1.2m high steel wire fabric fencing with 1.8m angle iron posts 40 x 40 x 6mm size placed at 2.0m apart embedded in cement concrete block 1:3:6 (1 cement: 3 sand: 6 stone aggegate) of size 25 x 25 x 60 cm with necessary fittings including earthwork completeExpanded wire mesh 3"Rmt796.30
22.06Bamboo fencing 1.00m high using seasoned bamboos of 30 mm average diameter quartered and smoothened, in Zawngdaikhalh pattern with specified spacing and strengthened (covered) with two semi-circular sections both at the top and bottom with balli posts at 2 metres intervals and binding with wires including earthwork completeRmt118.20
22.09Extra for applying two coats of synthetic enamel paints over one coat of red oxide zinc primer on angle iron posts and struts, complete in all respects as per drawing and direction of Engineer-in-chargeRmt104.20
S-02/SOURCE RECORD2019
ISSUED BY
Mizoram PWD
EFFECTIVE
2019-02-01
RETRIEVED
2026-07-29
S-03/CHAPTERS21 MORE

Other chapters in this schedule

SHOW ALL 21 CHAPTERS
ARCHED / ESTIMATING

Pricing fencing against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.