Mizoram SOR 2019

Fencing rates

5 fencing items from the Mizoram PWD, effective 2019-02-01.

Fencing rates in the Mizoram Schedule of Rates (Volume I) 2019 run from ₹104.20 to ₹964.40. Transcribed from Mizoram PWD — Schedule of Rates 2019 (Volume I), effective 1 February 2019; rates are inclusive of GST for a 5 km lead within Aizawl. Reference only — verify against the official source before pricing a bid.

5 items — scroll the table to browse

DescriptionUnit
22.04(a)1.0m high plastic net fencing with 1.5m angle iron posts 40 x 40 x 6mm size placed at 2.5m apart embedded in cement concrete block 1:3:6 (1 cement: 3 sand: 6 stone aggegate) of size 25 x 25 x 60 cm with necessary fittings including earthwork completePerimeter fencing 2MWRmt964.40
22.04(b)1.0m high plastic net fencing with 1.5m angle iron posts 40 x 40 x 6mm size placed at 2.5m apart embedded in cement concrete block 1:3:6 (1 cement: 3 sand: 6 stone aggegate) of size 25 x 25 x 60 cm with necessary fittings including earthwork completeSGP - 16 41" MWRmt757.80
22.05(a)1.2m high steel wire fabric fencing with 1.8m angle iron posts 40 x 40 x 6mm size placed at 2.0m apart embedded in cement concrete block 1:3:6 (1 cement: 3 sand: 6 stone aggegate) of size 25 x 25 x 60 cm with necessary fittings including earthwork completeExpanded wire mesh 3"Rmt796.30
22.06Bamboo fencing 1.00m high using seasoned bamboos of 30 mm average diameter quartered and smoothened, in Zawngdaikhalh pattern with specified spacing and strengthened (covered) with two semi-circular sections both at the top and bottom with balli posts at 2 metres intervals and binding with wires including earthwork completeRmt118.20
22.09Extra for applying two coats of synthetic enamel paints over one coat of red oxide zinc primer on angle iron posts and struts, complete in all respects as per drawing and direction of Engineer-in-chargeRmt104.20

Pricing fencing against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.