Odisha Schedule of Rates — Miscellaneous Items (Chapter 25) 2022

228 rate items from the Odisha Works Department, effective 2023-04-20. Searchable, with Excel and CSV download.

Department
Odisha Works Department
Edition
2022 — effective 2023-04-20
Date of the covering Office Memorandum, which the text layer does not carry — it is an image page, read visually. OM No. WORKS-FA-MISCSB-0015-2022 6785/W dated 20-4-2023 states: "The new Schedule of Rate-2022 are effective from the date of issue of this Office Memorandum."
Items reproduced
228 across 17 chapters
Retrieved
2026-07-29

Transcribed from Government of Odisha, Works Department — Schedule of Rates 2022, Chapter 25 (Miscellaneous Items) only. Chapters 5–24 of this document — earthwork, concrete, RCC, masonry, flooring, painting, roofing, road work, bridge works and the other core trades — carry no rates; each directs the reader to the Analysis of Rates, 2006. Chapters 1–4 are basic rates of materials, labour, conveyance and machinery, not items of work.. Reference only — departments amend rates through correction slips between editions, so verify against the official source before pricing a bid. Items that could not be transcribed unambiguously have been left out rather than guessed.

Other items

18 items in 6 smaller chapters.

18 items — scroll the table to browse

DescriptionUnit
25.4.1Hassain ceiling stretched on Sal wood frame and mountain battens including all aterials, etc. completeSqm47.64
25.4.2Hassain mat ceiling stretched on old frames including all materials etcSqm26.83
25.4.3Bamboo celiling with new Sal frame including all materials etc. completeSqm92.39
25.4.4Bamboo celiling with old Sal frame including all materials etc. c ompleteSqm20.02
25.5.1Picking up old floor for resurfacingSqm5.00
25.5.2Polishing the floor surface with red oxide, bees wax and turpentineSqm16.20
25.5.3Rubbing old marble chips or marble tile flooring and dados skirting including wax polishing to give granolithic finishSqm72.41
25.7.1White washing and refiguring kilometer stones or mile stones or boundary pillarsEach6.57
25.7.2White washing and refiguring furling posts or 100M postEach3.37
25.7.3Chalk washing one coat to receive distemperingSqm2.89
25.7.4Chalk washing two coats to receive distemperingSqm3.00
25.10.9Providing 8 cm deep cement concrete (1:5:10) on top of compound wall and plastering with cement plaster (1:4) completeRm38.35
25.10.11Brick moulding including plastering with cement mortar (1:4) 12cm deep and 11cm projectionRm30.92
25.12.4Supplying fitting and fixing R.C.C. (1:2:4) fencing posts with chips 1.68M long 13cm × 13cm at bottom and 8cm × 8 cm at top and 30cm × 30cm × 8 cm base finished smoothEach197.87
25.15.1Removal of B.T. surface and stacking them away from work site within initial lead of 50 1 RM. and initial lift of 1.5 1 RM. as per direction of Engineer-in-chargeSqm18.24
25.15.2Labour charges for pre-coating 10mm chips as per I.R.C. code 48/72Cum489.81
25.15.3K.B.bricksflat soling including filling on interstics with sand or sandy soilSqm40.52
25.15.4Second class K.B. bricks on dental brick edgingRm11.23

How to use the Odisha Schedule of Rates

The schedule of rates — miscellaneous items (chapter 25) sets the department's accepted rate for each item of work, and estimates for Odisha government projects are built by mapping a project's Bill of Quantities to these items. Rates here run from ₹1.43 per sqm to ₹2,27,616.38 per rm, spanning 17 chapters from earthwork through to finishing trades.

Three things routinely go wrong. Estimators price against a superseded edition, because correction slips are published separately from the main schedule. They pick a nearly-similar item code rather than the exact one, which survives internal review and fails departmental scrutiny. And they miss that a rate is quoted for a different unit than the BOQ uses — a sqm rate applied to a rm quantity is a large error that looks reasonable on a spreadsheet.

For the schedules published by every other state, see the Schedule of Rates by state directory, and for how SOR items relate to a tender's BOQ, the guide to SOR vs BOQ.

Pricing a live tender against this schedule

Mapping a tender BOQ to the right SOR items by hand, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.