Odisha Schedule of Rates — Miscellaneous Items (Chapter 25) 2022
- Items reproduced
- 228
- Chapters
- 17
- Edition
- 2022
- Effective from
- 2023-04-20
- ISSUED BY
- Odisha Works Department
- EFFECTIVE
- 2023-04-20Date of the covering Office Memorandum, which the text layer does not carry — it is an image page, read visually. OM No. WORKS-FA-MISCSB-0015-2022 6785/W dated 20-4-2023 states: "The new Schedule of Rate-2022 are effective from the date of issue of this Office Memorandum."
- RETRIEVED
- 2026-07-29
Transcribed from Government of Odisha, Works Department — Schedule of Rates 2022, Chapter 25 (Miscellaneous Items) only. Chapters 5–24 of this document — earthwork, concrete, RCC, masonry, flooring, painting, roofing, road work, bridge works and the other core trades — carry no rates; each directs the reader to the Analysis of Rates, 2006. Chapters 1–4 are basic rates of materials, labour, conveyance and machinery, not items of work.. For reference only. Departments amend rates through correction slips between editions, so verify against the official source before pricing a bid. Items we could not transcribe unambiguously have been left out.
Browse by chapter
228 items across 17 chapters. Each chapter is searchable and sortable.
Other items
18 items in 6 smaller chapters.
18 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 25.4.1 | Hassain ceiling stretched on Sal wood frame and mountain battens including all aterials, etc. complete | Sqm | 47.64 |
| 25.4.2 | Hassain mat ceiling stretched on old frames including all materials etc | Sqm | 26.83 |
| 25.4.3 | Bamboo celiling with new Sal frame including all materials etc. complete | Sqm | 92.39 |
| 25.4.4 | Bamboo celiling with old Sal frame including all materials etc. c omplete | Sqm | 20.02 |
| 25.5.1 | Picking up old floor for resurfacing | Sqm | 5.00 |
| 25.5.2 | Polishing the floor surface with red oxide, bees wax and turpentine | Sqm | 16.20 |
| 25.5.3 | Rubbing old marble chips or marble tile flooring and dados skirting including wax polishing to give granolithic finish | Sqm | 72.41 |
| 25.7.1 | White washing and refiguring kilometer stones or mile stones or boundary pillars | Each | 6.57 |
| 25.7.2 | White washing and refiguring furling posts or 100M post | Each | 3.37 |
| 25.7.3 | Chalk washing one coat to receive distempering | Sqm | 2.89 |
| 25.7.4 | Chalk washing two coats to receive distempering | Sqm | 3.00 |
| 25.10.9 | Providing 8 cm deep cement concrete (1:5:10) on top of compound wall and plastering with cement plaster (1:4) complete | Rm | 38.35 |
| 25.10.11 | Brick moulding including plastering with cement mortar (1:4) 12cm deep and 11cm projection | Rm | 30.92 |
| 25.12.4 | Supplying fitting and fixing R.C.C. (1:2:4) fencing posts with chips 1.68M long 13cm × 13cm at bottom and 8cm × 8 cm at top and 30cm × 30cm × 8 cm base finished smooth | Each | 197.87 |
| 25.15.1 | Removal of B.T. surface and stacking them away from work site within initial lead of 50 1 RM. and initial lift of 1.5 1 RM. as per direction of Engineer-in-charge | Sqm | 18.24 |
| 25.15.2 | Labour charges for pre-coating 10mm chips as per I.R.C. code 48/72 | Cum | 489.81 |
| 25.15.3 | K.B.bricksflat soling including filling on interstics with sand or sandy soil | Sqm | 40.52 |
| 25.15.4 | Second class K.B. bricks on dental brick edging | Rm | 11.23 |
How to use the Odisha Schedule of Rates
The schedule of rates — miscellaneous items (chapter 25) sets the department's accepted rate for each item of work, and estimates for Odisha government projects are built by mapping a project's Bill of Quantities to these items. Rates here run from ₹1.43 per sqm to ₹2,27,616.38 per rm, spanning 17 chapters from earthwork through to finishing trades.
Three things routinely go wrong. Estimators price against a superseded edition, because correction slips are published separately from the main schedule. They pick a nearly-similar item code rather than the exact one, which can pass an internal review and still be rejected by the department. And they miss that a rate is quoted for a different unit than the BOQ uses. A sqm rate applied to a rm quantity is a large error that looks reasonable on a spreadsheet.
For the schedules published by every other state, see the Schedule of Rates by state directory, and for how SOR items relate to a tender's BOQ, the guide to SOR vs BOQ.
Pricing a live tender against this schedule
Mapping a tender BOQ to the right SOR items by hand, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.