Iron Work rates

12 iron work items from the Odisha Works Department, effective 2023-04-20.
Items
12
Lowest rate
₹3.98
Highest rate
₹355.25
Effective from
2023-04-20
S-01/RATE ITEMS12 ITEMS

Iron Work rates in the Odisha Schedule of Rates — Miscellaneous Items (Chapter 25) 2022 run from ₹3.98 to ₹355.25. Transcribed from Government of Odisha, Works Department — Schedule of Rates 2022, Chapter 25 (Miscellaneous Items) only. Chapters 5–24 of this document — earthwork, concrete, RCC, masonry, flooring, painting, roofing, road work, bridge works and the other core trades — carry no rates; each directs the reader to the Analysis of Rates, 2006. Chapters 1–4 are basic rates of materials, labour, conveyance and machinery, not items of work.. For reference only: verify against the official source before pricing a bid.

Download the full schedule (Excel)All 17 chapters
Unit

12 items. Scroll the table to browse

DescriptionUnit
25.6.1Labour for fitting and fixing flat iron wind ties including drilling holes and supplying bolts and nutsQuintal278.02
25.6.2Fabricated iron works (Labour only)Quintal355.25
25.6.3Labour for fixing M.S. bed plates 12mm thick set in cementSqm157.04
25.6.4(a)Welding of rods to proper specification and strength including cutting and shaping the ends to receive the welding materials and cutting to proper sizes as required for the work complete25mm dia M.S. RodsJoint98.03
25.6.4(b)Welding of rods to proper specification and strength including cutting and shaping the ends to receive the welding materials and cutting to proper sizes as required for the work complete28mm dia M.S. RodsJoint117.86
25.6.4(c)Welding of rods to proper specification and strength including cutting and shaping the ends to receive the welding materials and cutting to proper sizes as required for the work complete30mm dia M.S. RodsJoint117.50
25.6.4(d)Welding of rods to proper specification and strength including cutting and shaping the ends to receive the welding materials and cutting to proper sizes as required for the work complete35mm dia M.S. RodsJoint121.59
25.6.4(e)Welding of rods to proper specification and strength including cutting and shaping the ends to receive the welding materials and cutting to proper sizes as required for the work complete38mm dia M.S. RodsJoint123.08
25.6.5Labour for fitting and fixing of M.S. window grills including cost of screws completeSqm16.22
25.6.6Labour for fitting and fixing of M.S. Gates as per approved design including cost of all materials completeSqm93.32
25.6.7Labour for fixing holding down bolts in cement mortarEach3.98
25.6.8Labour for fixing fan hooks in existing R.C. ceilingEach20.59
S-02/SOURCE RECORD2022
ISSUED BY
Odisha Works Department
EFFECTIVE
2023-04-20Date of the covering Office Memorandum, which the text layer does not carry — it is an image page, read visually. OM No. WORKS-FA-MISCSB-0015-2022 6785/W dated 20-4-2023 states: "The new Schedule of Rate-2022 are effective from the date of issue of this Office Memorandum."
RETRIEVED
2026-07-29
S-03/CHAPTERS10 MORE

Other chapters in this schedule

ARCHED / ESTIMATING

Pricing iron work against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.