Skip to main content
R/ODISHA SOR 2022

Timber Bridges rates

6 timber bridges items from the Odisha Works Department, effective 2023-04-20.
Items
6
Lowest rate
₹6.41
Highest rate
₹23,277.90
Effective from
2023-04-20
S-01/RATE ITEMS6 ITEMS

Timber Bridges rates in the Odisha Schedule of Rates — Miscellaneous Items (Chapter 25) 2022 run from ₹6.41 to ₹23,277.90. Transcribed from Government of Odisha, Works Department — Schedule of Rates 2022, Chapter 25 (Miscellaneous Items) only. Chapters 5–24 of this document — earthwork, concrete, RCC, masonry, flooring, painting, roofing, road work, bridge works and the other core trades — carry no rates; each directs the reader to the Analysis of Rates, 2006. Chapters 1–4 are basic rates of materials, labour, conveyance and machinery, not items of work.. For reference only: verify against the official source before pricing a bid.

Download the full schedule (Excel)All 17 chapters
Unit

6 items. Scroll the table to browse

DescriptionUnit
25.14.1Sal bullah rough squared beams including fixing with new nails spikes for bridge work, etc. inclusive of cost of all materials completeCum10,408.50
25.14.2Refixing old wood including cost of new nails etcCum595.88
25.14.3Dismanting old wood work of bridges and stacking at siteCum291.38
25.14.4Sal wood planks and sawn scantling for bridge including fixing and cost of new nails, etc. completeCum23,277.90
25.14.5Labour for fitting and fixing old sal planks for fair-weather road including cost of nailsSqm12.66
25.14.6Labour for fixing old sal bullah including cost of nails after cutting to required sizesRm6.41
S-02/SOURCE RECORD2022
ISSUED BY
Odisha Works Department
EFFECTIVE
2023-04-20Date of the covering Office Memorandum, which the text layer does not carry — it is an image page, read visually. OM No. WORKS-FA-MISCSB-0015-2022 6785/W dated 20-4-2023 states: "The new Schedule of Rate-2022 are effective from the date of issue of this Office Memorandum."
RETRIEVED
2026-07-29
S-03/CHAPTERS10 MORE

Other chapters in this schedule

ARCHED / ESTIMATING

Pricing timber bridges against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.