Timber Bridges rates
- Items
- 6
- Lowest rate
- ₹6.41
- Highest rate
- ₹23,277.90
- Effective from
- 2023-04-20
Timber Bridges rates in the Odisha Schedule of Rates — Miscellaneous Items (Chapter 25) 2022 run from ₹6.41 to ₹23,277.90. Transcribed from Government of Odisha, Works Department — Schedule of Rates 2022, Chapter 25 (Miscellaneous Items) only. Chapters 5–24 of this document — earthwork, concrete, RCC, masonry, flooring, painting, roofing, road work, bridge works and the other core trades — carry no rates; each directs the reader to the Analysis of Rates, 2006. Chapters 1–4 are basic rates of materials, labour, conveyance and machinery, not items of work.. For reference only: verify against the official source before pricing a bid.
6 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 25.14.1 | Sal bullah rough squared beams including fixing with new nails spikes for bridge work, etc. inclusive of cost of all materials complete | Cum | 10,408.50 |
| 25.14.2 | Refixing old wood including cost of new nails etc | Cum | 595.88 |
| 25.14.3 | Dismanting old wood work of bridges and stacking at site | Cum | 291.38 |
| 25.14.4 | Sal wood planks and sawn scantling for bridge including fixing and cost of new nails, etc. complete | Cum | 23,277.90 |
| 25.14.5 | Labour for fitting and fixing old sal planks for fair-weather road including cost of nails | Sqm | 12.66 |
| 25.14.6 | Labour for fixing old sal bullah including cost of nails after cutting to required sizes | Rm | 6.41 |
- ISSUED BY
- Odisha Works Department
- EFFECTIVE
- 2023-04-20Date of the covering Office Memorandum, which the text layer does not carry — it is an image page, read visually. OM No. WORKS-FA-MISCSB-0015-2022 6785/W dated 20-4-2023 states: "The new Schedule of Rate-2022 are effective from the date of issue of this Office Memorandum."
- RETRIEVED
- 2026-07-29
Other chapters in this schedule
Pricing timber bridges against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.