Other Miscellaneous Items rates

43 other miscellaneous items items from the Odisha Works Department, effective 2023-04-20.

Other Miscellaneous Items rates in the Odisha Schedule of Rates — Miscellaneous Items (Chapter 25) 2022 run from ₹1.98 to ₹502.89. Transcribed from Government of Odisha, Works Department — Schedule of Rates 2022, Chapter 25 (Miscellaneous Items) only. Chapters 5–24 of this document — earthwork, concrete, RCC, masonry, flooring, painting, roofing, road work, bridge works and the other core trades — carry no rates; each directs the reader to the Analysis of Rates, 2006. Chapters 1–4 are basic rates of materials, labour, conveyance and machinery, not items of work.. Reference only — verify against the official source before pricing a bid.

43 items — scroll the table to browse

DescriptionUnit
25.16.3Cutting and uprooting trees including removal and making good to the damages to ground, trees up to 1.50M girthEach39.94
25.16.4Cutting and uprooting trees including removal and making good to the damages to ground treesabove 1.50M upto 3.00 M girthEach64.20
25.16.5Cutting and uprooting trees including removal and making good to the damages to ground trees above 3.00M. girthEach95.98
25.16.6Washing newer cot including refixing each cotEach24.79
25.16.7Dewatering and removing rubbish and silt and disinfecting wells upto 1.5M diaEach134.91
25.16.8Dewatering and removing rubbish and silt and disinfecting wells above 1.50M and upto 2.50M diaEach218.14
25.16.9Supplying fitting and fixing teak wood hand rails 8cm to 10cm wide and 5cm to 8cm depth complete in all respects polishedRm315.78
25.16.10Supplying fitting and fixing teak wood picture rail 8 cm to 10cm wide and 12cm tick including polishng, etc. completeRm94.09
25.16.11Bamboo gabions 60cm dia 1.50 M high including coaltaring 2 coats to 30 cm bottom fitted and fixed completeEach47.31
25.16.12Bamboo gabions 1m dia 1.50 M high including coaltaring 2 coats to 30 cm bottom fitted and fixed completeEach76.82
25.16.13Recanning arm of dining chair with nylon cane (Back)Each41.79
25.16.14Recanning arm of dining chair with country cane (Back)Each33.98
25.16.15Recaning arm of dining chair with nylon cane (seat)Each75.74
25.16.16Recaning arm of dining chair with country cane (seat)Each56.22
25.16.17Recanning easy chair with nylon caneEach190.37
25.16.18Recanning easy chair with country caneEach170.51
25.16.19(a)Construction of brick gabions with dry brick and cement mortar in honey comb joints and two layers solid masonry in cement mortar (1:6)in all joints1.25M dia and 1.50M highEach502.89
25.16.19(b)Construction of brick gabions with dry brick and cement mortar in honey comb joints and two layers solid masonry in cement mortar (1:6)in all joints1.00M dia and 1.50M highEach405.25
25.16.20(a)Laying and fixing in position R.C.C. spun pipes with collars jointed with cement mortar 1:3 complete excluding cost of spun pipes and collars100mm dia R.C.C. pipeRm12.28
25.16.20(b)Laying and fixing in position R.C.C. spun pipes with collars jointed with cement mortar 1:3 complete excluding cost of spun pipes and collars150mm dia R.C.C. pipeRm13.87
25.16.20(c)Laying and fixing in position R.C.C. spun pipes with collars jointed with cement mortar 1:3 complete excluding cost of spun pipes and collars250mm dia R.C.C. pipeRm20.01
25.16.20(d)Laying and fixing in position R.C.C. spun pipes with collars jointed with cement mortar 1:3 complete excluding cost of spun pipes and collars300mm dia R.C.C. pipeRm24.18
25.16.20(e)Laying and fixing in position R.C.C. spun pipes with collars jointed with cement mortar 1:3 complete excluding cost of spun pipes and collars450mm dia R.C.C. pipeRm30.32
25.16.20(f)Laying and fixing in position R.C.C. spun pipes with collars jointed with cement mortar 1:3 complete excluding cost of spun pipes and collars600mm dia R.C.C. pipeRm37.35
25.16.20(g)Laying and fixing in position R.C.C. spun pipes with collars jointed with cement mortar 1:3 complete excluding cost of spun pipes and collars900mm dia R.C.C. pipeRm55.56
25.16.20(h)Laying and fixing in position R.C.C. spun pipes with collars jointed with cement mortar 1:3 complete excluding cost of spun pipes and collars1200mm dia R.C.C. pipeRm96.80
25.16.21Labour for fixing bullahs 30cm to 50cm below ground for barricading purposeEach2.02
25.16.24Non-sal bullah 13cm to 15cm dia fitted and fixed completeMetre50.05
25.16.25Non-sal bullah 18cm to 20cm dia fitted and fixed completeMetre71.74
25.16.27Fitting and fixing unitex board after cutting rebate and grooves and fixing with necessary beads, nails or screws etc. (Labour) nails or screws etc (labour)Sqm117.92
25.16.28Renewing bases of lightening conductors terminals with pillar 25cm × 25cm and12mm cement plaster (1:6) completeEach82.95
25.16.29Making empty coalter drum gabions with thick coat of colatar to exposed surface (drums to be supplied departmentally)Each14.54
25.16.30Cutting chase or grooves upto 15cm × 15cm in old walls including fixing C.I. sheet in cement mortar (1:3)Rm14.88
25.16.32Labour for cutting the empty coalter drums and flattering the sameEach4.72
25.16.33Providing 12cm thick and 30cm high ornamental brick parapet as per design with (1:6) cement mortar and cement plaster (1:6) finished smooth completeRm138.01
25.16.34Labour for fitting and fixing masonite sheet lining to wall faces etc. completeSqm25.36
25.16.35Crack repair to walls 8cm × 2.5cm with cement mortar (1:3)Rm3.61
25.16.36(a)Clearing of water hyacinth from canal and drainage channelsThickely grownSqm2.80
25.16.36(b)Clearing of water hyacinth from canal and drainage channelsModerately grownSqm1.98
25.16.38Drilling hole 25cm to 37mm dia in granite rockRm168.08
25.16.39Drilling hole 25cm to 37mm dia in rock other than graniteRm142.45
25.16.40Sawing charges of wood by machine as per specified sizeCum477.59
25.16.41Sewing charges by hand including cost of the thread hand needless per R.MRm2.00

Pricing other miscellaneous items against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.