Skip to main content
R/ODISHA SOR 2022

Drain rates

5 drain items from the Odisha Works Department, effective 2023-04-20.
Items
5
Lowest rate
₹12.69
Highest rate
₹374.03
Effective from
2023-04-20
S-01/RATE ITEMS5 ITEMS

Drain rates in the Odisha Schedule of Rates — Miscellaneous Items (Chapter 25) 2022 run from ₹12.69 to ₹374.03. Transcribed from Government of Odisha, Works Department — Schedule of Rates 2022, Chapter 25 (Miscellaneous Items) only. Chapters 5–24 of this document — earthwork, concrete, RCC, masonry, flooring, painting, roofing, road work, bridge works and the other core trades — carry no rates; each directs the reader to the Analysis of Rates, 2006. Chapters 1–4 are basic rates of materials, labour, conveyance and machinery, not items of work.. For reference only: verify against the official source before pricing a bid.

Download the full schedule (Excel)All 17 chapters
Unit

5 items. Scroll the table to browse

DescriptionUnit
25.11.4Shallow brick drain in courtyard 6cm deep with cement plaster (1:3) finished smoothRm46.35
25.11.8Ditto 60cm wide and 30cm depthRm374.03
25.11.9Ditto 30cm wide and 30cm depthRm189.75
25.11.10Waste water outlet in cement including cost of gratingsEach24.70
25.11.11Waste water outlet in cement without gratingsEach12.69
S-02/SOURCE RECORD2022
ISSUED BY
Odisha Works Department
EFFECTIVE
2023-04-20Date of the covering Office Memorandum, which the text layer does not carry — it is an image page, read visually. OM No. WORKS-FA-MISCSB-0015-2022 6785/W dated 20-4-2023 states: "The new Schedule of Rate-2022 are effective from the date of issue of this Office Memorandum."
RETRIEVED
2026-07-29
S-03/CHAPTERS10 MORE

Other chapters in this schedule

ARCHED / ESTIMATING

Pricing drain against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.