15 r.c.c. works items from the Odisha Works Department, effective 2023-04-20.

R.C.C. Works rates in the Odisha Schedule of Rates — Miscellaneous Items (Chapter 25) 2022 run from ₹2.01 to ₹6,117.36. Transcribed from Government of Odisha, Works Department — Schedule of Rates 2022, Chapter 25 (Miscellaneous Items) only. Chapters 5–24 of this document — earthwork, concrete, RCC, masonry, flooring, painting, roofing, road work, bridge works and the other core trades — carry no rates; each directs the reader to the Analysis of Rates, 2006. Chapters 1–4 are basic rates of materials, labour, conveyance and machinery, not items of work.. Reference only — verify against the official source before pricing a bid.

15 items — scroll the table to browse

DescriptionUnit
25.1.1Making R.C.C. jally as per approved design 2.5 cm to 5.00 cm thick and fixing in cement mortar in position after cutting the grooves, etc. complete including cost of all materialsSqm283.21
25.1.2Providing and fixing in position 50mm, thick precast cement concere jally (1:2:4) hard granite chips including roughening, cleaning, fixing and finishing in cement mortar (1:3) etc., completeSqm424.59
25.1.4R.C.C. boundary stones (1:2:4) with washed shingles or hard tone chips 10cm × 10cm and 1.2M high fitted and fixed completeEach74.41
25.1.5R.C.C. post (1:2:4) using 12mm size hard granite chips using 75Kgs of steel reinforcement per Cu.M. including cost of all materials and labour fitting and fixing in position etcCum6,117.36
25.1.6Supplying and fixing 15cm dia and 1.00 M. long guard posts of cement concrete (1:2:4) with hard granite chips including cost of all reinforcementEach93.06
25.1.7Labour for fixing 15 cm dia and 1 m long R.C.C. guard posts in position 45cm below ground levelEach3.04
25.1.8(a)Providing and fixing pre-cast R.C.C. (1:2:4) kilometre stone as per I.R.C. design including finished smooth110cm long ordinary Km. Stone for N.H., S.H. and M.D.REach409.45
25.1.8(b)Providing and fixing pre-cast R.C.C. (1:2:4) kilometre stone as per I.R.C. design including finished smooth150cm long ordinary 5 Km. Stone for N.H., S.H. and M.D.REach585.61
25.1.8(c)Providing and fixing pre-cast R.C.C. (1:2:4) kilometre stone as per I.R.C. design including finished smooth95cm long ordinary Km. Stone for N.H., S.H. and village roadsEach300.80
25.1.10R.C.C. railing (1:2:4), 8 cm thick 90cm high with hard granite chips 6mm to 20mm size complete as per approved designRm452.71
25.1.11I.R.C. standard R.C.C. railing (1:2:4) using black hard granite chips 12mm size including cost of centering and shuttering and cost and conveyance of all materials and labour etc. completeRm760.70
25.1.12Boxing with cement concrete (1:3:6) with wire netting and washed pit singles or hard stone chips including cement plaster 6mm, thick finished smooth completeCum1,834.48
25.1.13Filling bitumen and cement and jute fibre in expansion joints inclusive of cost of materials, bitumen and cement proportion (3:1) including cleaning before pouring 12mm to 25mm and 15cm depthRm14.25
25.1.14Ditto extra for each additional 2.5cm depth over the depth of 15cmRm3.02
25.1.15Inserting premoulded expansion joint including cleaning (labour only)Rm2.01

Pricing r.c.c. works against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.