Odisha SOR 2022
Roofing rates
14 roofing items from the Odisha Works Department, effective 2023-04-20.
Roofing rates in the Odisha Schedule of Rates — Miscellaneous Items (Chapter 25) 2022 run from ₹1.43 to ₹758.01. Transcribed from Government of Odisha, Works Department — Schedule of Rates 2022, Chapter 25 (Miscellaneous Items) only. Chapters 5–24 of this document — earthwork, concrete, RCC, masonry, flooring, painting, roofing, road work, bridge works and the other core trades — carry no rates; each directs the reader to the Analysis of Rates, 2006. Chapters 1–4 are basic rates of materials, labour, conveyance and machinery, not items of work.. Reference only — verify against the official source before pricing a bid.
14 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 25.3.4 | G.I. sheet gutter upto 30cm wide including fixing with clamps and making connection with rain water pipes, etc. complete | Rm | 97.97 |
| 25.3.5 | Taking out choked up rain water C.I. down pipe including refixing the same in position with cement | Each | 34.04 |
| 25.3.6 | Labour for fitting and fixing 8 cm to 10 cm C.I down pipe | Rm | 6.31 |
| 25.3.7 | Labour for fixing rain water down pipe with necessary bend shoes and heads etc. including cost of clamps and nails | Rm | 13.33 |
| 25.3.9 | Cleaning flues of chimneys | Each | 14.22 |
| 25.3.10 | Fixing ridges and valley in C.I. sheet roofing (Labour only) | Sqm | 13.79 |
| 25.3.11 | Lime mortar ridge over pan tiled roof | Rm | 20.95 |
| 25.3.12 | Labour for changing burgas irrespective of length and size including repairs to damages | Each | 11.97 |
| 25.3.13 | Labour for laying local Raniganj tile roofing | Sqm | 8.02 |
| 25.3.14 | Leak repairs to single Nuria tile roofing | Sqm | 2.00 |
| 25.3.15 | Leak repairs to double Nuria tile roofing | Sqm | 1.48 |
| 25.3.16 | Labour for fitting and fixing old roof timbers including cost of nails | Cum | 758.01 |
| 25.3.17 | Labour for removal of old bamboo frame including stacking the useful materials for reuse | Sqm | 1.43 |
| 25.3.18 | Labour for fixing ‘J’ ‘L’ or ‘U’ hooks for repair works only | Each | 2.34 |
Other chapters in this schedule
Pricing roofing against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.