14 roofing items from the Odisha Works Department, effective 2023-04-20.

Roofing rates in the Odisha Schedule of Rates — Miscellaneous Items (Chapter 25) 2022 run from ₹1.43 to ₹758.01. Transcribed from Government of Odisha, Works Department — Schedule of Rates 2022, Chapter 25 (Miscellaneous Items) only. Chapters 5–24 of this document — earthwork, concrete, RCC, masonry, flooring, painting, roofing, road work, bridge works and the other core trades — carry no rates; each directs the reader to the Analysis of Rates, 2006. Chapters 1–4 are basic rates of materials, labour, conveyance and machinery, not items of work.. Reference only — verify against the official source before pricing a bid.

14 items — scroll the table to browse

DescriptionUnit
25.3.4G.I. sheet gutter upto 30cm wide including fixing with clamps and making connection with rain water pipes, etc. completeRm97.97
25.3.5Taking out choked up rain water C.I. down pipe including refixing the same in position with cementEach34.04
25.3.6Labour for fitting and fixing 8 cm to 10 cm C.I down pipeRm6.31
25.3.7Labour for fixing rain water down pipe with necessary bend shoes and heads etc. including cost of clamps and nailsRm13.33
25.3.9Cleaning flues of chimneysEach14.22
25.3.10Fixing ridges and valley in C.I. sheet roofing (Labour only)Sqm13.79
25.3.11Lime mortar ridge over pan tiled roofRm20.95
25.3.12Labour for changing burgas irrespective of length and size including repairs to damagesEach11.97
25.3.13Labour for laying local Raniganj tile roofingSqm8.02
25.3.14Leak repairs to single Nuria tile roofingSqm2.00
25.3.15Leak repairs to double Nuria tile roofingSqm1.48
25.3.16Labour for fitting and fixing old roof timbers including cost of nailsCum758.01
25.3.17Labour for removal of old bamboo frame including stacking the useful materials for reuseSqm1.43
25.3.18Labour for fixing ‘J’ ‘L’ or ‘U’ hooks for repair works onlyEach2.34

Pricing roofing against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.