Bridge Work rates in the Odisha Schedule of Rates — Miscellaneous Items (Chapter 25) 2022 run from ₹4.99 to ₹28,141.38. Transcribed from Government of Odisha, Works Department — Schedule of Rates 2022, Chapter 25 (Miscellaneous Items) only. Chapters 5–24 of this document — earthwork, concrete, RCC, masonry, flooring, painting, roofing, road work, bridge works and the other core trades — carry no rates; each directs the reader to the Analysis of Rates, 2006. Chapters 1–4 are basic rates of materials, labour, conveyance and machinery, not items of work.. Reference only — verify against the official source before pricing a bid.
30 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 25.13.1(a) | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete3.00 M dia outside circular or octagonal single wall upto 10.00 M depth | Rm | 6,683.27 |
| 25.13.1(b) | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete3.25M dia outside circular or octagonal single wall, upto 10.00M add | Rm | 8,625.55 |
| 25.13.1(c) | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete3.50M dia outside circular or octagonal single well upto 10.00M depth | Rm | 10,589.17 |
| 25.13.1(d) | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete4.00 M dia outside circular or octagonal single well upto 10.00M depth | Rm | 13,161.19 |
| 25.13.1(e) | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete4.25 M dia outside circular or octagonal single well | Rm | 16,076.10 |
| 25.13.1(f) | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete4.50M dia outside circular or octagonal single well | Rm | 16,624.48 |
| 25.13.1(g) | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete4.75M dia outside circula or octagonal single well | Rm | 17,464.39 |
| 25.13.1(h) | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete5.00 M dia outside circular or octagonal single well | Rm | 18,764.77 |
| 25.13.1(i) | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete5.50 M dia outside circular or octagonal single well | Rm | 19,440.75 |
| 25.13.1(j) | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete5.75M dia outside circular or octagonal single well | Rm | 20,481.96 |
| 25.13.1(k) | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete6.00 dia outside circular or octagonal single well | Rm | 21,969.51 |
| 25.13.1(l) | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete6.50M dia outside circular or octagonal single well | Rm | 23,180.55 |
| 25.13.1(m) | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete6.75M dia outside circular or octagonal single well | Rm | 24,303.57 |
| 25.13.1(n) | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete7.00M dia outside circular to octagonal single well | Rm | 25,663.97 |
| 25.13.1(o) | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete7.25M dia outside circular or octagonal single well | Rm | 26,619.62 |
| 25.13.1(p) | Labour for sinking wells in all kinds of soil other than rock, to lines, levels and plumb by scooping out from inside and below the staining including cost of necessary tools and plant supplying and working of pumps bailing out of water or dredging, removal of all materials and obstacles from inside the well by divers, hire and labour for cantiledge jetting, if necessary and sinking to a depth of 10M taking precaution against shifting and tilting disposal of the spoil with all leads and lifts, etc complete7.50M dia outside circular or octagonal single well | Rm | 28,141.38 |
| 25.13.3(b) | Earth work in excavation of foundation in all kinds of soil with all leads and lifts includings shoring, shuttering, propping bullahs, piling dewatering from foundation, supplying and working pumps and stacking the excavated materials away form working area as ordered by the Engineer-in-charge upto 60M etc. complete with coffer dam if requiredBeyond 3.00M and upto 6.00 M. Depth | Cum | 6,775.56 |
| 25.13.3(c) | Earth work in excavation of foundation in all kinds of soil with all leads and lifts includings shoring, shuttering, propping bullahs, piling dewatering from foundation, supplying and working pumps and stacking the excavated materials away form working area as ordered by the Engineer-in-charge upto 60M etc. complete with coffer dam if requiredBeyond 6.00M depth | Cum | 8,328.03 |
| 25.13.6 | Leveling the hard rock surface under wells for piers, abutments and wings under water | Sqm | 212.66 |
| 25.13.7 | Fixing anchoring bars upto 25mm to 38mm dia to the foundation of piers and abutments after drilling holes grouting with cement or cement mortar as per approved proportion, etc. all complete but excluding cost of rods | Each | 126.65 |
| 25.13.8 | Labour for fitting and fixing in position steel cutting edge as per approved design using M.S. angle plates, bolts and nuts complete including cutting angles to required size, bending to shape, drilling holes, reverting and welding, etc. complete in all respect but excluding cost of angles and plates | Quintal | 1,213.36 |
| 25.13.10 | Providing C.I. grating to holes size upto 15cm dia for each drainage of water including cost of all materials | Each | 59.61 |
| 25.13.11 | Cement concrete in foundation including dewatering add extra to the respective rate of cement concrete | Cum | 76.51 |
| 25.13.12 | Cement concrete in substructure including frame work (shuttering and hoisting) add extra to the respective items of work | Cum | 140.63 |
| 25.13.13 | Masonry work in foundation below bed level add extra to respective rates of foundation for dewatering and lowering of materials | Cum | 44.28 |
| 25.13.14 | Shoring foundation trenches, pits, etc. with closed wood sheet piles excluding cost of wood (Labour only) | Sqm | 17.55 |
| 25.13.15 | Shuttering in foundation excluding cost of wood (Labour only) | Sqm | 4.99 |
| 25.13.16 | Trial boring in river-bed 38mm to 50mm dia upto 9.15M depth | Rm | 46.67 |
| 25.13.17 | Removing and refixing old wood work saving to the required sizes where necessary including cost of new nails but excluding cost of bolts complete for bridge work (labour only) | Cum | 556.54 |
| 25.13.18 | Fixing wooden planks and scantling for bridge decking including cost of new nails (Labour only) | Cum | 581.17 |
Other chapters in this schedule
Pricing bridge work against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.