9 painting items from the Odisha Works Department, effective 2023-04-20.
Items
9
Lowest rate
₹2.01
Highest rate
₹9.19
Effective from
2023-04-20
S-01/RATE ITEMS9 ITEMS

Painting rates in the Odisha Schedule of Rates — Miscellaneous Items (Chapter 25) 2022 run from ₹2.01 to ₹9.19. Transcribed from Government of Odisha, Works Department — Schedule of Rates 2022, Chapter 25 (Miscellaneous Items) only. Chapters 5–24 of this document — earthwork, concrete, RCC, masonry, flooring, painting, roofing, road work, bridge works and the other core trades — carry no rates; each directs the reader to the Analysis of Rates, 2006. Chapters 1–4 are basic rates of materials, labour, conveyance and machinery, not items of work.. For reference only: verify against the official source before pricing a bid.

Download the full schedule (Excel)All 17 chapters
Unit

9 items. Scroll the table to browse

DescriptionUnit
25.8.1Painting figures and letters of various size upto 120mmEach2.04
25.8.2Painting figures and letters above 120 mm sizeRm2.01
25.8.3Engraving letters of various sizes from 5cm to 10cm including painting, etc. CompleteRm3.41
25.8.4Painting and writing road signs of all kinds as per I.R.C. standard including painting boardsRm9.19
25.8.5Marking and painting lines or arrowsRm2.79
25.8.6Wall painting with any approved paint 1 coat (Labour only)Sqm5.75
25.8.7Wall painting with any approved paint 2 coats (Labour only)Sqm6.93
25.8.8Scraping old paint with scrapers, sand papering andwashing with soap water or soda including scaffolding charges upto 5M heightSqm5.12
25.8.9Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges above 5M high and upto 8M heightSqm7.01
S-02/SOURCE RECORD2022
ISSUED BY
Odisha Works Department
EFFECTIVE
2023-04-20Date of the covering Office Memorandum, which the text layer does not carry — it is an image page, read visually. OM No. WORKS-FA-MISCSB-0015-2022 6785/W dated 20-4-2023 states: "The new Schedule of Rate-2022 are effective from the date of issue of this Office Memorandum."
RETRIEVED
2026-07-29
S-03/CHAPTERS10 MORE

Other chapters in this schedule

ARCHED / ESTIMATING

Pricing painting against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.