Haryana Schedule of Rates 2021
- Items reproduced
- 4,983
- Chapters
- 28
- Edition
- 2021
- Effective from
- 2021-03-31
- ISSUED BY
- Haryana PWD (Buildings & Roads)
- EFFECTIVE
- 2021-03-31HSR 2021 states no commencement date. This is the date the foreword records the schedule as issued, with the approval of the Direction Committee of Chief Engineers, and is inferred rather than transcribed.
- RETRIEVED
- 2026-07-29
Transcribed from Haryana PWD (B&R) — Haryana Schedule of Rates 2021, issued with the approval of the Direction Committee of Chief Engineers, 31 March 2021. For reference only. Departments amend rates through correction slips between editions, so verify against the official source before pricing a bid. Items we could not transcribe unambiguously have been left out.
Browse by chapter
4,983 items across 28 chapters. Each chapter is searchable and sortable.
- 01Earth Work and Rock Cutting71
- 02Dismantling and Demolition93
- 03Concrete and RCC Work148
- 04Brick Work and Stone Masonry101
- 05Cladding Work61
- 06Hoisting and Roofing126
- 07Flooring and Dados181
- 08Finishing Works129
- 09Wood Work, PVC and Aluminum Doors and Windows291
- 10Steel and Iron Work64
- 11Lining and Outlets71
- 12Deep Foundations141
- 13River and Canal Protection Works57
- 14Road Works112
- 15Miscellaneous (Buildings)114
- 16Water Supply879
- 17Sewerage and Drainage1,019
- 18Sanitary Installations642
- 19Horticulture and Land Scaping125
- 20Bridges (Substructure, Superstructure, Bearings & Expansion Joints)32
- 21Water Proofing and Heat Insulation of Buildings54
- 22Structural & Aluminium Glazing7
- 23Repairs and Maintenance of Buildings146
- 24Strengthening and Retrofitting of Buildings34
- 25Innovating Technologies, New Materials and Solar Panels123
- 26Rain Water Harvesting & Tube wells45
- 27Road Furniture82
- 28Miscellaneous (Roads)35
How to use the Haryana Schedule of Rates
The haryana schedule of rates sets the department's accepted rate for each item of work, and estimates for Haryana government projects are built by mapping a project's Bill of Quantities to these items. Rates here run from ₹0.31 per sqm to ₹89,33,459.00 each, spanning 28 chapters from earthwork through to finishing trades.
Three things routinely go wrong. Estimators price against a superseded edition, because correction slips are published separately from the main schedule. They pick a nearly-similar item code rather than the exact one, which can pass an internal review and still be rejected by the department. And they miss that a rate is quoted for a different unit than the BOQ uses. A sqm rate applied to a each quantity is a large error that looks reasonable on a spreadsheet.
For the schedules published by every other state, see the Schedule of Rates by state directory, and for how SOR items relate to a tender's BOQ, the guide to SOR vs BOQ.
Pricing a live tender against this schedule
Mapping a tender BOQ to the right SOR items by hand, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.