Skip to main content

Haryana SOR 2021

Miscellaneous (Buildings) rates

114 miscellaneous (buildings) items from the Haryana PWD (Buildings & Roads), effective 2021-03-31.

Miscellaneous (Buildings) rates in the Haryana Haryana Schedule of Rates 2021 run from ₹9.00 to ₹85,085.00. Transcribed from Haryana PWD (B&R) — Haryana Schedule of Rates 2021, issued with the approval of the Direction Committee of Chief Engineers, 31 March 2021. Reference only — verify against the official source before pricing a bid.

114 items — scroll the table to browse

DescriptionUnit
18.1Brick work with common burnt clay bricks of class designation 7.5 in mud mortar STONE MASONRYCum4,091.00
18.2Extra for stone work (veneer work) curved on plan with a mean radius not exceeding 6 mCum779.00
18.3Providing and fixing stone dowels 1O x5x2.50 cm cut to double wedge shape as per design in cement mortar 1:2 (1 cement: 2 coarse sand), including making the necessary chases. ROOFINGEach19.00
18.4Providing, erecting, laying and fixing in position in 3.5 to 4 mm thick bamboo mat corrugated sheet (BMCS) as per IS: 15476-2004 in roofing with self drilling screws along with EPDM washers complete or with galvanized iron J or L hooks 8mm dia G.I. plain and bitumen washers etc, all complete as per direction of Engineer-in-ChargeSqm4,938.00
18.5Providing and fixing in position ridges of 3.5 to 4 mm thick bamboo mat ridge cap (BMRC) as per IS: 15476-2004 in roofing with self drilling screws along with EPDM washers complete or with galvanized iron J or L hooks 8mm dia G.I. plain and bitumen washers etc, all complete as per direction of Engineer- in-ChargeMetre3,997.00
18.6Providing and fixing at all height false ceiling of 4mm thick phenol bonded Bamboo Mat board (595x595mm) conforming to IS:13958-1994 including providing and fixing of frame work made of GI angle 25x25x0.4 mm thick all around suitably fixed to wall with the help of dash fastener and hanger frame (600x600 c/c) made GI slotted Tee having powder coating on bottom side (30x25x0.3 mm thick for main member & 25x25x0.3 mm for cross member) connected to ceiling with 2.64mm GI wire and anchor fastener at every junction and also including cost of making openings for light fittings, grills, diffusers, cut outs made with frame of perimeter channels suitably fixed all complete as per direction of Engineer-in-charge. FLOORING & DADOSSqm2,943.00
18.7Providing & fixing in position Phenol bonded Bamboo wood flooring with planks of sizes 14mm thick, 1800mm length (minimum) and 130 mm wide(minimum), in approved colour, texture and finish, having Performance Appraisal Certificate (PAC) issued by Building Materials & Technology Promotion Council (BMTPC). The flooring shall be fixed with tongue and groove interlocking system, with underlayment of 4mm thick expanded polyethylene foam sheets having density 40kg/cum, over prepared surface with necessary quarter round planks of size 1900mm x 18mm and door reducer of size 1900mm x 44mm, wherever required. The bamboo wood planks shall have minimum density of 1000 kg/cum & minimum Hardness 1000 kgf. with Eco friendly UV coating, all complete as per direction of the Engineer in-chargeSqm5,093.00
18.8Providing & fixing in position Phenol bonded Bamboo wood in wall skirting with planks of sizes 14mm thick, 1900mm length (minimum) and 85mm wide(minimum), in approved colour, texture and finish, having Performance Appraisal Certificate (PAC) issued by Building Materials & Technology Promotion Council (BMTPC). The skirting shall be fixed with SS screws & rawl plugs, over underlayment of 4mm thick, expanded polyethylene foam sheets having 40kg/cum density over prepared surface. The bamboo wood planks shall have minimum density of 1 OOOkg/cum & minimum Hardness 1000 kgf. with Eco friendly UV coating, all complete as per direction of the Engineer in-charge. WOODWORKSqm4,911.00
18.9.1Providing beams including hoisting, fixing in position and applying wood preservative for the unexposed surfaces, etc. complete withSal woodCum85,085.00
18.9.2Providing beams including hoisting, fixing in position and applying wood preservative for the unexposed surfaces, etc. complete withHollockwoodCum51,968.00
18.10Providing and fixing panelling or panelling and glazing in panelled or panelled and glazed shutters for doors, windows and clerestory windows ( area of opening for panel inserts excluding portion inside grooves or rebated to be measured). Panelling for panelled and glazed shutters 25mm to 40mm thick: Pre-laminated with decorative lamination on both side exterior Grade - I MDF Board 12 mm thick confirming to IS:14587Sqm1,153.00
18.11.1Providing and fixing Pre -laminated medium density fibre board exterior grade (Grade-I) IS:14587:1998 marked, to frame, backing or studding with screws etc. complete ( Frames, backing or studding to be paid separately)Pre-laminated with decorative lamination on both side exterior Grade- I MDF Board 12 mm thick confirming to IS:14587Sqm727.00
18.11.2Providing and fixing Pre -laminated medium density fibre board exterior grade (Grade-I) IS:14587:1998 marked, to frame, backing or studding with screws etc. complete ( Frames, backing or studding to be paid separately)Pre-laminated with decorative lamination on both side exterior Grade- I MDF Board 18 mm thick confirming to IS:14587Sqm914.00
18.12.1Providing and fixing Pre-laminated medium density fibre board IS: 14587:1998 marked, with one side decorative lamination other side balancing lamination Grade-l(exterior grade) in shelves with screws and fittings wherever required, edges to be sealed with PVC edge bending tape 2.00 mm thick of approved brand (fittings to be paid separately)Pre-laminated with decorative lamination one side and other side balancing lamination exterior Grade - I MDF Board 18 mm thick confirming to 15:14587Sqm1,023.00
18.12.2Providing and fixing Pre-laminated medium density fibre board IS: 14587:1998 marked, with one side decorative lamination other side balancing lamination Grade-l(exterior grade) in shelves with screws and fittings wherever required, edges to be sealed with PVC edge bending tape 2.00 mm thick of approved brand (fittings to be paid separately)Pre-laminated with decorative lamination one side and other side balancing lamination exterior Grade - I MDF Board 25 mm thick confirming to 15:14587Sqm1,426.00
18.13.1Providing and fixing in wall lining medium density fibre board IS: 14587:1998 marked, Pre-laminated one side decorative lamination and other side balancing lamination, with necessary fixing arrangement and screws etc. complete12 mm thickSqm891.00
18.13.2Providing and fixing in wall lining medium density fibre board IS: 14587:1998 marked, Pre-laminated one side decorative lamination and other side balancing lamination, with necessary fixing arrangement and screws etc. complete18 mm thickSqm1,084.00
18.13.3Providing and fixing in wall lining medium density fibre board IS: 14587:1998 marked, Pre-laminated one side decorative lamination and other side balancing lamination, with necessary fixing arrangement and screws etc. complete25 mm thickSqm1,443.00
18.14Providing and fixing 25mm thick pre-laminated medium density fibre board exterior grade ( Grade-I) IS:14587:1998 marked with one side decorative and other side balancing lamination for cupboard shutters edges to be sealed with PVC edge bending tape 2.00 mm thick of approved brand including ISi marked nickel plated bright finishing M.S. piano hinges conforming to 15:3818 marked with necessary screw etc all completeSqm1,509.00
18.15.1Providing and fixing skirting with Pre-laminated medium density fibre board exterior grade (Grade-I) conforming to IS: 14587:1998 marked, with (one side decorative and other side balancing lamination and edges to be sealed with PVC edge bending tape 2.00 mm thick of approved brand with necessary fixing arrangements and screws, including drilling necessary holes for rawl plugs etc. all complete18 mm thickSqm1,611.00
18.15.2Providing and fixing skirting with Pre-laminated medium density fibre board exterior grade (Grade-I) conforming to IS: 14587:1998 marked, with (one side decorative and other side balancing lamination and edges to be sealed with PVC edge bending tape 2.00 mm thick of approved brand with necessary fixing arrangements and screws, including drilling necessary holes for rawl plugs etc. all complete25 mm thick. DOORS & WINDOWSSqm2,032.00
18.16Providing & fixing in position Phenol bonded Bamboo wood panelled or panelled and glazed shutters for doors windows, clerestory windows with pre­ molded 30mm thick planks, in approved colours, texture & finished. It shall have 10mm wide, 25mm deep grove to fit in panels. The bamboo wood shall have minimum density of 1000 kg/cum, minimum Hardness 1000 kgf. All styles and rails shall have profiled interlocking system locked in place by bamboo pins, all complete as per direction of Engineer in charge. (The panelling will be paid for separately)Sqm5,147.00
18.17Providing & fixing in position Phenol bonded Bamboo wood panelling of 10mm thick, in 25 to 40 mm thick panelled or panelled & glazed shutters for doors, windows, clerestory windows, in approved colour, texture & finish. The bamboo wood planks shall have minimum density of 1000 kg/cum & minimum Hardness 1000 kgf. The panels shall have profiled interlocking system locked in place with bamboo pins all complete as per direction of the Engineer in-charge. (area of opening for panel inserts excluding portion inside grooves or rebates to be measured)Sqm3,058.00
18.19Providing and fixing concealed hinge of approved quality for 19-20mm thick door with stainless steel screws complete PARTITIONSEach92.00
18.20Providing and laying Gypsum panel partitions 100 mm thick with water proof Gypsum panels of size 666x500x100 mm, made of calcite phosphor Gypsum fixed with tongue and groove, jointed with bonding plaster as per manufacturer's specifications in superstructure above plinth level up to floor IV level. Gypsum blocks will have a minimum compressive strength of 9.3 kg/cm2Sqm783.00
18.21Extra for Gypsum panel Partitions in superstructure above floor IV level for every three floors or part thereofSqm41.00
18.22.1Providing and fixing at Bamboo Mat board confonning to IS:13958-1994 for partition to frame by bucking or studding with screws etc. complete (Frames,3mm thicknessSqm2,196.00
18.22.2Providing and fixing at Bamboo Mat board confonning to IS:13958-1994 for partition to frame by bucking or studding with screws etc. complete (Frames,4mm thicknessSqm2,531.00
18.22.3Providing and fixing at Bamboo Mat board confonning to IS:13958-1994 for partition to frame by bucking or studding with screws etc. complete (Frames,6mm thicknessSqm3,044.00
18.22.4Providing and fixing at Bamboo Mat board confonning to IS:13958-1994 for partition to frame by bucking or studding with screws etc. complete (Frames,9mm thicknessSqm3,891.00
18.22.5Providing and fixing at Bamboo Mat board confonning to IS:13958-1994 for partition to frame by bucking or studding with screws etc. complete (Frames,12mm thicknessSqm4,494.00
18.23.1Providing and fixing at all height wall panelling with phenol bonded Bamboo Mat board confonning to IS:13958-1994 including providing and fixing to frame work made of 50mm x 50mm hardwood plugs including cutting brick work and fixing in cement mortar and making good the wall etc. and also providing and fixing wooden moulded corner beading of triangular shape to the junction of panelling etc. with iron screws all complete as per direction of Engineer-in-Charge9mm thicknessSqm4,220.00
18.23.2Providing and fixing at all height wall panelling with phenol bonded Bamboo Mat board confonning to IS:13958-1994 including providing and fixing to frame work made of 50mm x 50mm hardwood plugs including cutting brick work and fixing in cement mortar and making good the wall etc. and also providing and fixing wooden moulded corner beading of triangular shape to the junction of panelling etc. with iron screws all complete as per direction of Engineer-in-Charge12mm thickness CLADDINGSqm4,825.00
18.24Providing & fixing in position Phenol bonded Bamboo wood wall cladding at all height with planks of sizes 10mm thick, 1800mm length (minimum) and 130 mm wide (minimum), in approved colour, texture and finish, having Perfonnance Appraisal Certificate (PAC) issued by Building Materials & Technology Promotion Council (BMTPC), with necessary profiled edges fixed with 40mm SS screws 5 Nos. in each tile to frame work made of second class teak wood of size 20x15 mm in centre of each tile and bottom and top of work height, 40x15mm placed at ends of each tile. The cladding shall be laid over back layer of 1.00 mm thick expanded polyethylene foam of density 40kg/cum in two layers, first layer on wall surface before fixing wooden frame and second layer on frame under cladding. The bamboo wood planks shall have minimum density of 1000 kg/cum & minimum Hardness 1000 kgf. with Eco friendly UV coating, all complete as per direction of the Engineer in­ charge. uPVC PROFILED PRODUCTSSqm5,309.00
18.25Providing and fixing factory made solid Foam uPVC profile for kitchen cabinet frame (45 x 20 mm) of approved shade, quality and make. The profile shall be laminated on both sides, made from rigid foam sheets (Single extruded) having density 600 kg/cum and the exposed edges sealed with PVC edge beading of same shade and colour. The frame shall be fire retardant with necessary screw holding capacity. Frame shall be fixed to wall using Expendable Fastener with necessary stainless steel screws, all complete as per direction of Engineer-in-chargeMetre321.00
18.26Providing and fixing factory made Kitchen Cabinet Shutter/Partition 20 mm nominal thickness of approved shade, quality and make, made from rigid foam sheets (Single extruded) having density 600 kg/cum and laminated on both side by laminate SheeUPVC foil lamination. The exposed edges shall be sealed with PVC edge beading of same shade and colour. The shutter shall be fire retardant having necessary screw holding capacity. Shutter shall be fixed to frame using approved hinges with necessary stainless steel screws, all complete as per direction of Engineer-in-charge. PE-AL-PE COMPOSITE PRESSURE PIPESqm3,599.00
18.27.1Providing and fixing Polyethylene-Aluminium-Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot & cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers & connectors etc., with clamps at 1.00 metre spacing. This includes testing of joints complete as per direction of the Engineer-in-charge. INTERNAL WORK • EXPOSED ON WALL1216 (16 mm OD) pipeMetre168.00
18.27.2Providing and fixing Polyethylene-Aluminium-Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot & cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers & connectors etc., with clamps at 1.00 metre spacing. This includes testing of joints complete as per direction of the Engineer-in-charge. INTERNAL WORK • EXPOSED ON WALL1620 (20 mm OD) pipeMetre202.00
18.27.3Providing and fixing Polyethylene-Aluminium-Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot & cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers & connectors etc., with clamps at 1.00 metre spacing. This includes testing of joints complete as per direction of the Engineer-in-charge. INTERNAL WORK • EXPOSED ON WALL2025 (25 mm OD) pipeMetre264.00
18.27.4Providing and fixing Polyethylene-Aluminium-Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot & cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers & connectors etc., with clamps at 1.00 metre spacing. This includes testing of joints complete as per direction of the Engineer-in-charge. INTERNAL WORK • EXPOSED ON WALL2532 (32 mm OD) pipeMetre351.00
18.27.5Providing and fixing Polyethylene-Aluminium-Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot & cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers & connectors etc., with clamps at 1.00 metre spacing. This includes testing of joints complete as per direction of the Engineer-in-charge. INTERNAL WORK • EXPOSED ON WALL3240 (40 mm OD) pipeMetre506.00
18.27.6Providing and fixing Polyethylene-Aluminium-Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot & cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers & connectors etc., with clamps at 1.00 metre spacing. This includes testing of joints complete as per direction of the Engineer-in-charge. INTERNAL WORK • EXPOSED ON WALL4050 (50 mm OD) pipeMetre667.00
18.28.1Providing and fixing Polyethylene-Aluminium- Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot & cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers & connectors etc., with clamps at 1.00 metre spacing. This includes the costs of cutting chases and including testing of joints complete as per direction of the engineer in charge. Concealed work, including cutting chases and making good1216 (16 mm OD) pipeMetre269.00
18.28.2Providing and fixing Polyethylene-Aluminium- Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot & cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers & connectors etc., with clamps at 1.00 metre spacing. This includes the costs of cutting chases and including testing of joints complete as per direction of the engineer in charge. Concealed work, including cutting chases and making good1620 (20 mm OD) pipeMetre305.00
18.28.3Providing and fixing Polyethylene-Aluminium- Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot & cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers & connectors etc., with clamps at 1.00 metre spacing. This includes the costs of cutting chases and including testing of joints complete as per direction of the engineer in charge. Concealed work, including cutting chases and making good2025 (25 mm OD) pipeMetre378.00
18.28.4Providing and fixing Polyethylene-Aluminium- Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot & cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers & connectors etc., with clamps at 1.00 metre spacing. This includes the costs of cutting chases and including testing of joints complete as per direction of the engineer in charge. Concealed work, including cutting chases and making good2532 (32 mm OD) pipeMetre485.00
18.29.1Providing and fixing Polyethylene-Aluminium- Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot & cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers & connectors etc., with trenching, refilling and testing of joints complete as per direction of the engineer in charge. External work1216 (16 mm OD) pipeMetre144.00
18.29.2Providing and fixing Polyethylene-Aluminium- Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot & cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers & connectors etc., with trenching, refilling and testing of joints complete as per direction of the engineer in charge. External work1620 (20 mm OD ) pipeMetre171.00
18.29.3Providing and fixing Polyethylene-Aluminium- Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot & cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers & connectors etc., with trenching, refilling and testing of joints complete as per direction of the engineer in charge. External work2025 (25 mm OD ) pipeMetre225.00
18.29.4Providing and fixing Polyethylene-Aluminium- Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot & cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers & connectors etc., with trenching, refilling and testing of joints complete as per direction of the engineer in charge. External work2532 (32 mm OD ) pipeMetre304.00
18.29.5Providing and fixing Polyethylene-Aluminium- Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot & cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers & connectors etc., with trenching, refilling and testing of joints complete as per direction of the engineer in charge. External work3240 (40 mm OD ) pipeMetre443.00
18.29.6Providing and fixing Polyethylene-Aluminium- Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot & cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers & connectors etc., with trenching, refilling and testing of joints complete as per direction of the engineer in charge. External work4050 (50 mm OD ) pipe PP-R PIPESMetre604.00
18.30.1Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes confirming to IS 15801, UV stabilized & anti - microbial fusion welded, having thermal stability for hot & cold water supply, including all PP - R plain & brass threaded polypropylene random fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes testing of joints complete as per direction of Engineer-in- Charge. Internal Exposed on wallsPN - 16 Pipe, 20mm OD (SDR-7.4)Metre143.00
18.30.2Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes confirming to IS 15801, UV stabilized & anti - microbial fusion welded, having thermal stability for hot & cold water supply, including all PP - R plain & brass threaded polypropylene random fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes testing of joints complete as per direction of Engineer-in- Charge. Internal Exposed on wallsPN -16 Pipe, 25mm OD (SDR-7.4)Metre191.00
18.30.3Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes confirming to IS 15801, UV stabilized & anti - microbial fusion welded, having thermal stability for hot & cold water supply, including all PP - R plain & brass threaded polypropylene random fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes testing of joints complete as per direction of Engineer-in- Charge. Internal Exposed on wallsPN - 16 Pipe, 32mm OD (SDR-7.4)Metre245.00
18.30.4Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes confirming to IS 15801, UV stabilized & anti - microbial fusion welded, having thermal stability for hot & cold water supply, including all PP - R plain & brass threaded polypropylene random fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes testing of joints complete as per direction of Engineer-in- Charge. Internal Exposed on wallsPN - 16 Pipe, 40mm OD (SDR-7.4)Metre350.00
18.30.5Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes confirming to IS 15801, UV stabilized & anti - microbial fusion welded, having thermal stability for hot & cold water supply, including all PP - R plain & brass threaded polypropylene random fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes testing of joints complete as per direction of Engineer-in- Charge. Internal Exposed on wallsPN -10 Pipe, 50mm OD (SDR-11)Metre486.00
18.31.1Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes confirming to IS: 15801, UV stabilized & anti -microbial fusion welded, having thermal stability for hot & cold water supply, including all PP - R plain & brass threaded polypropylene random fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer-in- Charge. Concealed work, including cutting chases and making good the wall etcPN -16 Pipe, 20mm OD (SDR-7.4)Metre226.00
18.31.2Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes confirming to IS: 15801, UV stabilized & anti -microbial fusion welded, having thermal stability for hot & cold water supply, including all PP - R plain & brass threaded polypropylene random fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer-in- Charge. Concealed work, including cutting chases and making good the wall etcPN -16 Pipe, 25mm OD (SDR-7.4)Metre280.00
18.31.3Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes confirming to IS: 15801, UV stabilized & anti -microbial fusion welded, having thermal stability for hot & cold water supply, including all PP - R plain & brass threaded polypropylene random fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer-in- Charge. Concealed work, including cutting chases and making good the wall etcPN - 16 Pipe, 32mm OD (SDR-7.4)Metre336.00
18.32.1Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes confirming to IS:15801 UV stabilized & anti - microbial fusion welded, having thermal stability for hot & cold water supply, including all PP -R plain & brass threaded polypropylene random fittings, including trenching, refilling & testing of joints complete as per direction of Engineer-in-Charge. External workPN - 16 Pipe, 20mm OD (SDR-7.4)Metre121.00
18.32.2Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes confirming to IS:15801 UV stabilized & anti - microbial fusion welded, having thermal stability for hot & cold water supply, including all PP -R plain & brass threaded polypropylene random fittings, including trenching, refilling & testing of joints complete as per direction of Engineer-in-Charge. External workPN -16 Pipe, 25 mm OD (SDR-7.4)Metre163.00
18.32.3Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes confirming to IS:15801 UV stabilized & anti - microbial fusion welded, having thermal stability for hot & cold water supply, including all PP -R plain & brass threaded polypropylene random fittings, including trenching, refilling & testing of joints complete as per direction of Engineer-in-Charge. External workPN -16 Pipe, 32 mm OD (SDR-7.4)Metre225.00
18.32.4Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes confirming to IS:15801 UV stabilized & anti - microbial fusion welded, having thermal stability for hot & cold water supply, including all PP -R plain & brass threaded polypropylene random fittings, including trenching, refilling & testing of joints complete as per direction of Engineer-in-Charge. External workPN - 16 Pipe, 40 mm OD (SDR-7.4)Metre313.00
18.32.5Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes confirming to IS:15801 UV stabilized & anti - microbial fusion welded, having thermal stability for hot & cold water supply, including all PP -R plain & brass threaded polypropylene random fittings, including trenching, refilling & testing of joints complete as per direction of Engineer-in-Charge. External workPN - 10 Pipe, 50 mm OD (SDR-11)Metre455.00
18.32.6Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes confirming to IS:15801 UV stabilized & anti - microbial fusion welded, having thermal stability for hot & cold water supply, including all PP -R plain & brass threaded polypropylene random fittings, including trenching, refilling & testing of joints complete as per direction of Engineer-in-Charge. External workPN -10 Pipe, 63 mm OD (SDR-11)Metre514.00
18.32.7Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes confirming to IS:15801 UV stabilized & anti - microbial fusion welded, having thermal stability for hot & cold water supply, including all PP -R plain & brass threaded polypropylene random fittings, including trenching, refilling & testing of joints complete as per direction of Engineer-in-Charge. External workPN - 10 Pipe, 75 mm OD (SDR-11)Metre726.00
18.32.8Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes confirming to IS:15801 UV stabilized & anti - microbial fusion welded, having thermal stability for hot & cold water supply, including all PP -R plain & brass threaded polypropylene random fittings, including trenching, refilling & testing of joints complete as per direction of Engineer-in-Charge. External workPN -10 Pipe, 90 mm OD (SDR-11)Metre1,029.00
18.33.1Providing and fixing PPR UnionsPPR Union 20mmEach143.00
18.33.2Providing and fixing PPR UnionsPPR Union 25mmEach207.00
18.33.3Providing and fixing PPR UnionsPPR Union 32mmEach259.00
18.33.4Providing and fixing PPR UnionsPPR Union 40mmEach321.00
18.33.5Providing and fixing PPR UnionsPPR Union 50mmEach539.00
18.33.6Providing and fixing PPR UnionsPPR Union 63mmEach709.00
18.33.7Providing and fixing PPR UnionsPPR Union 75mm WATER PROOFINGEach1,292.00
18.34Water proofing treatment of Vertical joints (of external side and internal side) between door frame, window & ventilator frames (on all four sides) of outer wall over the Zycosil/equivalent & Zycoprime/equivalent solution already applied (before the installation of door/ window/ ventilator frames in position) and fine finish with Grout RW/equivalentSqm28.00
18.36In-filling / sealing of joint between RCC lintel cum sunshade and wall (on external side) in all floors by pushing in Grout RW/equivalent in paste form and coving 20 mm x 20 mm after applying a coat of Zycosil/equivalent & Zycoprime/equivalent solution before cement plastering of top, bottom and sides of RCC sunshade. OTHER USEFUL BUILDING CONSTRUCTION ITEMSSqm28.00
18.37Supplying and installation of moisture resistant/fire resistant 6 mm thick Heavy duty fibre cement board (High pressure steam cured) conforming to IS 14862:2000 of category Ill type Bas per standard sizes fixed with self-drilling / taping screws. Screws shall be of counter sunk rib head of 1.60mm to 4 mm thick of 8 to 1O gauge of length varying from 25 to 45 mmSqm925.00
18.38Providing and fixing Scaffolding net of required width made of high density Polyethylene UV stabilized knitted on warp knitting machines having density 100grams/sqm and shading coefficient minimum 75% around the construction site/ for vertical extension as per requirement including fastening/tying with building/scaffolding pipes or with any other fixtures etc. complete as per direction of Engineer-in-Charge. (One time payment shall be made for providing Scaffolding net from start of work till completion of work including shifting if any. The Scaffolding net shall be the property of the contractor on completion of the work)Sqm22.00
18.39Providing and fixing in all exterior face panels breathable vapour barrier underneath the cement fibre board as per National Building Code 2009 complete as per direction of Engineer-in-chargeSqm266.00
18.40Supplying & laying of drainage composite for use behind walls, between two different fills, alongside drains of road, below concrete lining of canals etc. Geocomposite for planar drainage, realized by thermo bonding a draining core in extruded monofilaments with two filtering nonwoven geotextile that may also be working as separation or protecting layers. The draining three dimensional core will have a "W· configuration as longitudinal parallel channels. Minimum thickness to be 7.2mm, with two filtering UV stabilized polypropylene nonwoven geotextile of minimum thickness of 0.75mm characteristic opening size (090) of 11 O micron and tensile strength of 8.0 kN/m that will be working as separation or protecting layer, Geocomposite having in plane flow capacity of 2.1 L / (m.s) at hydraulic gradient of 1.0 & 20 kPa pressure and tensile strength of 18 kN/m, with mass per unit area of 7 40 gsm, supplied in the form of roll for easy transportation to site of work as per detailed specification all complete as per directions of Engineer in chargeSqm767.00
18.41Supplying & laying of drainage composite for use behind walls, between two different fills, alongside drains of road, below concrete lining of canals etc. having thermo bonding a draining core - HDPE geonet comprises of two sets of parallel overlaid ribs integrally connected to have a rhomboidal shape with a polyethylene film and a nonwoven geotextile having mass per unit area 130 gsm and tensile strength of 8.0 kN/m that will be working as separation or protecting layer, Geocomposite having in plane flow capacity of 0.7 L / (m.s) at hydraulic gradient of 1.0 & 20 kPa pressure and tensile strength of 13.5 kN/m, with mass per unit area of 830 gsm, at easily accessible location including top and bottom, with all leads and lifts, manpower and machinery, materials, labour etc. complete and as directed by Engineer - In - ChargeSqm910.00
18.42Mud mortar made with local clay good earth. SECURITY GUARDSCum461.00
18.43Providing round the clock security guard without gun for watch & ward of Government premises and its all belongings by deploying neatly dressed security guards in 8 hour's shift including necessary T&P like torch, lathi and uniform etc.complete, as per the direction of Engineer-in-charge. (One job means 8 hour's duty)Day575.00
18.44Providing round the clock security guard with gun for watch & ward of Government premises and its all belongings by deploying neatly dressed security guards in 8 hour's shift including necessary T&P like torch, lathi and uniform etc.complete, as per the direction of Engineer-in-charge.(One job means 8 hour's duty)Day604.00
18.46Drilling holes in girdersEach20.00
18.47.1Cutting/Fixing of copper sheetsCutting of copper sheets 1.5 mm, thick flashingMetre68.00
18.47.2Cutting/Fixing of copper sheetsFixing copper flashing into positionMetre27.00
18.48Assembling 40 mm. pressure pipesMetre15.00
18.49Boring and fixing 40 mm pressure pipesMetre75.00
18.50.1.3Boring for hand-pump in clay fitting strainer and pipeExceeding 30 mMetre338.00
18.50.2.3Boring for hand-pump in clay fitting strainer and pipeExceeding 30 mMetre338.00
18.52.1Pulling out pipe and filtersMetre28.00
18.52.2Lowering pipe in the hole up to 40mm diaMetre28.00
18.53Fixing E.I gauges flush with masonry including cost of hooksMetre111.00
18.54Fixing handles to iron rammers including cost of handlesEach50.00
18.56Felling trees, cutting and stacking fuel wood from plantationQuintal70.00
18.57Splitting fuel woodQuintal100.00
18.60Supply of bamboo jhandies 3 m to 3.5 m including iron shoes and flags 40 cm Square painted black and whiteEach170.00
18.61Fixing glass pieces on top of wallsMetre44.00
18.62Digging pits and fixing distance marks or boundary stonesEach50.00
18.63Supplying manure or compost, including carriage of 100 mCum430.00
18.64Ploughing two timesHectare3,000.00
18.65Filling 200 litres drums with diesel oil (not payable to diesel dealer)Each14.00
18.66Jungle clearance. Notes for Item No.18.64 to 18.66 (i) The rates are applicable to areas acquired for new canals, and drains, extension of channels and for construction of roads and Buildings. (ii) The rate is to be decided by the Executive Engineer according to density of jungle to be clearedHectare1,076.00
18.67.1Ordinary jungle clearance of both banks of running distributaries, minors and drains with discharge up to 9cum/s including boundary roadDischarge up to 1.5 cum/sKM1,398.00
18.67.2Ordinary jungle clearance of both banks of running distributaries, minors and drains with discharge up to 9cum/s including boundary roadDischarge exceeding 1.5 cum/s but up to 4.5 cum/sKM2,151.00
18.67.3Ordinary jungle clearance of both banks of running distributaries, minors and drains with discharge up to 9cum/s including boundary roadDischarge exceeding 4.5 cum/sKM2,796.00
18.68.1Jungle clearance on running canals and branches, and drains with discharge more than 9 cum/sLightKM8,606.00
18.68.2Jungle clearance on running canals and branches, and drains with discharge more than 9 cum/sMediumKM10,752.00
18.68.3Jungle clearance on running canals and branches, and drains with discharge more than 9 cum/sHeavyKM21,504.00
18.69Filling loose cement in empty cement bags weighing, sewing and stacking with in 30m including cost of stringBag9.00
18.70Filling cement bags with steam coal or kankar lime, sewing including cost of stringCum98.00
18.72Tempering of Kassies, Belchas, Khurpas and pick axes etc. A. Laying of C.I. Pipes and SpecialsEach50.00

Pricing miscellaneous (buildings) against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works