Haryana SOR 2021

Dismantling and Demolition rates

93 dismantling and demolition items from the Haryana PWD (Buildings & Roads), effective 2021-03-31.

Dismantling and Demolition rates in the Haryana Haryana Schedule of Rates 2021 run from ₹1.00 to ₹3,582.00. Transcribed from Haryana PWD (B&R) — Haryana Schedule of Rates 2021, issued with the approval of the Direction Committee of Chief Engineers, 31 March 2021. Reference only — verify against the official source before pricing a bid.

93 items — scroll the table to browse

DescriptionUnit
5.1.1Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/ by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in- chargeIn lime mortarCum598.00
5.1.2Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/ by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in- chargeIn cement mortarCum749.00
5.2.1Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-chargeIn lime mortarCum455.00
5.2.2Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-chargeIn cement mortarCum745.00
5.3.1.1Dismantling Stone PitchingStone pitching dryCum169.00
5.3.1.2Dismantling Stone PitchingStone pitching laid dry, but grouted with natural silt and clayCum315.00
5.4.1Dismantling Stone Spalls or Brickbats FillingIn dryCum158.00
5.4.2Dismantling Stone Spalls or Brickbats FillingGrouted with natural silt and clayCum222.00
5.5.1Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured)In lime mortarCum122.00
5.5.2Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured)In cement mortarCum170.00
5.6Demolishing dry brick pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within 50 metres leadCum298.00
5.7.1Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-chargeIn mud mortarCum252.00
5.7.2Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-chargeIn lime mortar with old mughal bricksCum403.00
5.7.3Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-chargeIn lime mortarCum389.00
5.7.4Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-chargeIn cement mortarCum655.00
5.9Demolishing thatch roofing including mats, bamboo, Jaffri etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres leadSqm16.00
5.10Dismantling jack arch roofing and floors including stacking of serviceable material and disposal of unserviceable material within 50 metres leadSqm57.00
5.11Demolishing mud phaska in terracing and disposal of material within 50 metres leadCum207.00
5.12Dismantling stone slab roofing over wooden karries or R.C.C. battens (dismantling karries and battens to be paid for separately), including stacking of serviceable material and disposal of unserviceable material within 50 metres leadCum606.00
5.13Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres leadSqm47.00
5.14Demolishing brick tile covering in terracing including stacking of serviceable material and disposal of unserviceable material within 50 metres leadSqm39.00
5.15.1Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead ofG.S. SheetSqm48.00
5.15.2Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead ofAsbestos Cement sheetSqm22.00
5.21Demolishing lime concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of Engineer- in-chargeCum193.00
5.22Demolishing R.B. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in- chargeCum1,403.00
5.27Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer-in-chargeCum366.00
5.28Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work. 5.23 Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 5.23.1 Nominal concrete 1: 1.5:3 or richer mix (i/c equivalent design mix) 5.23.2 Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) 5.24 Dismantling of cement concrete platform along with curtain walls and base concrete etc. including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead 5.24.1 120 x 120 cm (outside to outside) 5.24.2 210 x 120 cm (outside to outside) 5.24.3 320 x 120 cm (outside to outside) 5.25 Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in­ charge. 5.26 Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars. 5.27 Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer-in-charge. 5.28 Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. workKG3.00
5.31Dismantling expanded metal or I.R.C. fabrics with necessary battens and beading including stacking the serviceable material within 50 metres leadSqm19.00
5.32.1Dismantling steel work in single sections including dismembering and stacking within 50 metres lead inR.S. JoistsKG1.00
5.32.2Dismantling steel work in single sections including dismembering and stacking within 50 metres lead inChannels, angles, tees and flatsKG1.00
5.33Dismantling steel work in built up sections in angles, tees, flats and channels Including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres leadKG2.00
5.34Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of Engineer-in-chargeKG1.00
5.35Extra for marking of structural steel work required to be re- erectedKG1.00
5.36.1Dismantling and stacking within 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base ofT' or 'L' iron or pipeEach54.00
5.36.2Dismantling and stacking within 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base ofR.C.CEach60.00
5.37Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres leadKG8.00
5.38Dismantling wooden ballies in posts and struts including stacking within 50metres leadMetre5.00
5.39Cutting ballies or wooden posts of fencing at the point of projection above the concrete or ground and stacking the same within 50 metres leadEach4.00
5.40Dismantling wooden trellis work excluding frames but including stacking the serviceable material within 50 metres leadSqm17.00
5.41Removing rolling shutters including top cover, brackets and side guides etc.completeSqm34.00
5.42Dismantling cement conglomerate / terrazzo floors 25 mm to 50 mm manually/ by mechanical means and disposal of material within standard lead as per direction of Engineer- in-chargeSqm109.00
5.43.1Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres leadFor thickness of tiles 1 O mm to 25 mmSqm25.00
5.43.2Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres leadFor thickness of tiles above 25 mm and up to 40 mmSqm42.00
5.44Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres leadSqm60.00
5.45Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres leadSqm37.00
5.46.1Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres leadUp to 10 mm thickSqm17.00
5.46.2Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres leadThickness above 10 mm up to 25 mmSqm22.00
5.46.3Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres leadThickness above 25 mm up to 40 mmSqm25.00
5.47.1Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 metres leadThickness up to 40 mmSqm71.00
5.47.2Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 metres leadThickness above 40 mm up to 75 mmSqm106.00
5.48Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials and disposal of unserviceable materials within 50 metres leadSqm17.00
5.49Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-chargeSqm17.00
5.50Removal of old broken glass panes (any thickness or size, quality or description) from wooden frames, glazed with putty or fixed with beadsSqm50.00
5.51Removing old broken/serviceable glass of any thickness or size or description except polished plate glass from old wood or metal frames etc.(any thickness or size) hacking out old putty etc. including making good breakages in talking out and handling completeSqm65.00
5.52Dismantling stone-ware drains and of concreteMetre20.00
5.54.1Dismantling C.I. or asbestos rain water pipe with fittings and clamps including stacking the material within 50 metres lead75 to 80 mm dia pipeMetre17.00
5.54.2Dismantling C.I. or asbestos rain water pipe with fittings and clamps including stacking the material within 50 metres lead100 mm dia pipeMetre18.00
5.54.3Dismantling C.I. or asbestos rain water pipe with fittings and clamps including stacking the material within 50 metres lead150 mm dia pipeMetre18.00
5.55.1Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 metres lead as oer direction of Enaineer-in-charae15 mm to 40 mm nominal boreMetre34.00
5.56.1Dismantling C.I. pipes including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metre lead as per direction of Engineer-in-chargeUp to 150 mm diameterMetre101.00
5.57.1Dismantling steel cylinder R.C. pipes including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metres lead as per direction of Engineer-in-chargeUp to 600 mm diameterMetre188.00
5.58.1Dismantling asbestos cement pressure pipes including excavation and refilling trenches after taking out the pipes manually/ by mechanical means and stacking the pipes within 50 metres lead as per direction of Engineer-in-chargeUp to 150 mm diameterMetre77.00
5.59Taking out C.I. cover with frame from R.C.C. top slab of manholes of various sizes including demolishing of R.C.C. work manually/ by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead as per direction of Engineer-in-chargeEach159.00
5.60Taking out C.I. cover with frame from R.C.C. top slab of inspection chambers of various sizes including demolishing of R.C.C. work manually/ by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead as per direction of Engineer-in­ chargeEach92.00
5.61Dismantling of R.C.C. spun vent shaft including excavating the cement concrete pit completely, taking out the shaft, refilling the excavated gap, stacking the useful materials near the site and disposal of unserviceable materials within 50 metres leadEach1,476.00
5.62Dismantling of road gully chamber of various sizes including C.I. grating with frame including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead including refilling the excavated gapEach218.00
5.63Dismantling of flushing cistern of all types (C.I.IPVCNitreous China) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres leadEach256.00
5.64.1Dismantling of C.I. sluice valve including stacking of useful materials within a lead of 50 metresUp to 150 mm diameterEach94.00
5.65Dismantling of spindle fire hydrant including stacking of useful materials within 50 metres leadEach215.00
5.66.1Dismantling old C.I. pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks, including stacking of pipes at site lead up to 50 metre80 mm diameter C.I. pipeMetre96.00
5.66.2Dismantling old C.I. pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks, including stacking of pipes at site lead up to 50 metre100 mm diameter C.I. pipeMetre102.00
5.66.3Dismantling old C.I. pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks, including stacking of pipes at site lead up to 50 metre125 mm diameter C.I. pipeMetre107.00
5.66.4Dismantling old C.I. pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks, including stacking of pipes at site lead up to 50 metre150 mm diameter C.I. pipeMetre112.00
5.66.5Dismantling old C.I. pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks, including stacking of pipes at site lead up to 50 metre200 mm diameter C.I. pipeMetre127.00
5.66.6Dismantling old C.I. pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks, including stacking of pipes at site lead up to 50 metre250 mm diameter C.I. pipeMetre142.00
5.66.7Dismantling old C.I. pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks, including stacking of pipes at site lead up to 50 metre300 mm diameter C.I. pipeMetre154.00
5.67.1Dismantling of old S.W. pipes including breaking of joints and bed concrete stacking of useful materials near the site within 50 m lead and disposal of unserviceable materials into municipal dumps100 mm diameterMetre20.00
5.67.2Dismantling of old S.W. pipes including breaking of joints and bed concrete stacking of useful materials near the site within 50 m lead and disposal of unserviceable materials into municipal dumps150 mm diameterMetre22.00
5.67.3Dismantling of old S.W. pipes including breaking of joints and bed concrete stacking of useful materials near the site within 50 m lead and disposal of unserviceable materials into municipal dumps200 mm diameterMetre24.00
5.67.4Dismantling of old S.W. pipes including breaking of joints and bed concrete stacking of useful materials near the site within 50 m lead and disposal of unserviceable materials into municipal dumps250 mm diameterMetre25.00
5.67.5Dismantling of old S.W. pipes including breaking of joints and bed concrete stacking of useful materials near the site within 50 m lead and disposal of unserviceable materials into municipal dumps300 mm diameterMetre26.00
5.67.6Dismantling of old S.W. pipes including breaking of joints and bed concrete stacking of useful materials near the site within 50 m lead and disposal of unserviceable materials into municipal dumps350 mm diameterMetre30.00
5.67.7Dismantling of old S.W. pipes including breaking of joints and bed concrete stacking of useful materials near the site within 50 m lead and disposal of unserviceable materials into municipal dumps400 mm diameterMetre33.00
5.67.8Dismantling of old S.W. pipes including breaking of joints and bed concrete stacking of useful materials near the site within 50 m lead and disposal of unserviceable materials into municipal dumps450 mm diameterMetre35.00
5.68.1Dismantling of manhole including R.C.C. top slab, C.I. cover with frame, including stacking of useful materials near the site and disposal of unserviceable materials within 50 m lead as per direction of Engineer-in-chargeRectangular manhole 90x80 cm and 45 cm deepEach1,398.00
5.68.2Dismantling of manhole including R.C.C. top slab, C.I. cover with frame, including stacking of useful materials near the site and disposal of unserviceable materials within 50 m lead as per direction of Engineer-in-chargeRectangular manhole 120x90 cm and 90 cm deepEach2,226.00
5.68.3Dismantling of manhole including R.C.C. top slab, C.I. cover with frame, including stacking of useful materials near the site and disposal of unserviceable materials within 50 m lead as per direction of Engineer-in-chargeRectangular arch type manhole 140x90 cm and 2.45 m deepEach3,582.00
5.68.4Dismantling of manhole including R.C.C. top slab, C.I. cover with frame, including stacking of useful materials near the site and disposal of unserviceable materials within 50 m lead as per direction of Engineer-in-chargeCircular manhole 122 cm diameter and 1.68 m deepEach3,075.00
5.69.1Extra for depth of manholes dismantledRectangular manhole 90x80 cm and beyond 45 cm depthMetre650.00
5.69.2Extra for depth of manholes dismantledRectangular manhole 120x90 cm and beyond 90 cm depthMetre774.00
5.69.3Extra for depth of manholes dismantledRectangular arch type manhole 140x90 cm and beyond 2.45 m depth (up to 4.25 m depth)Metre702.00
5.69.4Extra for depth of manholes dismantledCircular manhole 122 cm diameter and beyond 1.68 m depth (up to 2.29 m depth)Metre709.00
5.70Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. A. CEMENT CONCRETE (CAST IN SITU)Cum96.00

Pricing dismantling and demolition against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.