R/HARYANA SOR 2021

Bridges (Substructure, Superstructure, Bearings & Expansion Joints) rates

32 bridges (substructure, superstructure, bearings & expansion joints) items from the Haryana PWD (Buildings & Roads), effective 2021-03-31.
Items
32
Lowest rate
₹69.00
Highest rate
₹68,876.00
Effective from
2021-03-31
S-01/RATE ITEMS32 ITEMS

Bridges (Substructure, Superstructure, Bearings & Expansion Joints) rates in the Haryana Haryana Schedule of Rates 2021 run from ₹69.00 to ₹68,876.00. Transcribed from Haryana PWD (B&R) — Haryana Schedule of Rates 2021, issued with the approval of the Direction Committee of Chief Engineers, 31 March 2021. For reference only: verify against the official source before pricing a bid.

Download the full schedule (Excel)All 28 chapters
Unit

32 items. Scroll the table to browse

DescriptionUnit
27.1Brick masonry work in 1:3 in sub-structure including scaffolding complete excluding pointing and plastering, as per drawing and MoRT&H Specifications 1300 and 2200Cum5,467.00
27.2Pointing with cement mortar (1:3) on brick work in substructure as per MoRT&H Specifications Scaffolding is already included in item 27.1Sqm69.00
27.3Plastering (12 mm thick) with cement mortar (1:3 ) on brick work in sub-structure as per MoRT&H Specifications 1.Scaffolding is already included in item no. 27.1 2.The number of masons and Mazdoors already catered in the cement mortar have been taken into account while providing these categories in brick masonry, pointing and plasteringSqm121.00
27.4.1Stone masonry work in cement mortar 1:3 for substructure including scaffolding complete as per drawing and MoRT&H MORT&H Specifications 1400 and 2200Random Rubble Masonry ( coursed/uncoursed)Cum4,941.00
27.4.2Stone masonry work in cement mortar 1:3 for substructure including scaffolding complete as per drawing and MoRT&H MORT&H Specifications 1400 and 2200Coursed rubble masonry (first sort)Cum5,291.00
27.4.3Stone masonry work in cement mortar 1:3 for substructure including scaffolding complete as per drawing and MoRT&H MORT&H Specifications 1400 and 2200Ashlar masonry ( first sort ) Plain ashlar The labour already considered in the cement mortar have been taken into account while providing these categories in the stone masonry works. PlainlReinforced cement concrete in sub- structure complete as per drawing and MORT&H MoRT&H Specifications 1500,1700 and 2200Cum6,604.00
27.5PCC Grade M15 (with concrete Mixer) Height up to 5mCum4,462.00
27.6PCC Grade M20 (with concrete Mixer) Height up to 5mCum5,068.00
27.7.1Height up to 5m 27. 7. 1.1 Using concrete MixerCum5,456.00
27.7.2Height 5m to 10m 27. 7.2.1 Using concrete Mixer 27.7. 2.2 With Batching Plant, Transit Mixer and Concrete PumpCum5,555.00
27.7.3Height above 1O m 27. 7.3.1 Using concrete MixerCum5,903.00
27.13Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and MoRT&H SpecificationsTonne68,876.00
27.14Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and MoRT&H SpecificationTonne67,302.00
27.15Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ retum wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing force. Complete as per drawing and MoRT&H SpecificationsNos258.00
27.16.1Back tilling behind abutment, wing wall and return wall complete as per drawing and MoRT&H SpecificationGranular materialCum1,411.00
27.25RCC Grade M20, Using Concrete MixerCum4,590.00
27.25.1.1For solid slab super-structure, Add 20-30 per cent of labour, material and machinery cost for FormworkHeight up to 5mCum5,508.00
27.25.1.2For solid slab super-structure, Add 20-30 per cent of labour, material and machinery cost for FormworkHeight 5m to 10mCum5,738.00
27.25.1.3For solid slab super-structure, Add 20-30 per cent of labour, material and machinery cost for FormworkHeight above 1 OmCum5,967.00
27.26RCC M-20, Using Batching Plant, Transit Mixer and Concrete PumpCum3,949.00
27.26.1.2For solid slab super-etructure, 20-30 per cent of labour, material and machinery costHeight 5m to 1O mCum4,936.00
27.27RCC Grade M25 Using Concrete Mixer For formwork and staging add the followingCum4,960.00
27.27.1.3For solid slab super-structure, 20-30 per cent of labour, material and machinery costHeight above 1 OmCum6,448.00
27.28Using Batching Plant, Transit Mixer and Concrete Pump For formwork and staging add the followingCum4,324.00
27.28.1.3For solid slab super-structure, 20-30 per cent of labour, material and machinery costHeight above 10mCum5,621.00
27.29RCC Grade M 30 Using Concrete MixerCum5,040.00
27.29.1.1For solid slab supar-etructure, 20-30 par cant of labour, material and machinery costHeight up to 5mCum6,048.00
27.29.1.2For solid slab supar-etructure, 20-30 par cant of labour, material and machinery costHeight 5m to 10mCum6,299.00
27.29.1.3For solid slab supar-etructure, 20-30 par cant of labour, material and machinery costHeight above 1 OmCum6,551.00
27.29.2.2For T-beam & slab, 25-35 per cent of labour, material and machinery costHeight 5m to 1 OmCum6,551.00
27.30Using Batching Plant, Transit Mixer and Concrete Pump. For formwork and staging add the followingCum4,376.00
27.30.1.2For solid slab super-etructure, 20-30 per cent of labour, material and machinery costHeight 5m to 10mCum5,470.00
S-02/SOURCE RECORD2021
ISSUED BY
Haryana PWD (Buildings & Roads)
EFFECTIVE
2021-03-31HSR 2021 states no commencement date. This is the date the foreword records the schedule as issued, with the approval of the Direction Committee of Chief Engineers, and is inferred rather than transcribed.
RETRIEVED
2026-07-29
S-03/CHAPTERS27 MORE

Other chapters in this schedule

SHOW ALL 27 CHAPTERS
ARCHED / ESTIMATING

Pricing bridges (substructure, superstructure, bearings & expansion joints) against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.