Arunachal Pradesh Building Schedule of Rates 2023

1,002 rate items from the Arunachal Pradesh PWD, effective 2024-12-30. Searchable, with Excel and CSV download.
Items reproduced
1,002
Chapters
21
Edition
2023
Effective from
2024-12-30
S-01/SOURCE RECORDRETRIEVED 2026-07-29
ISSUED BY
Arunachal Pradesh PWD
EFFECTIVE
2024-12-30Date the department published this edition on its Schedule of Rates page. APSR 2023 names only the year 2023 on its cover and prints no commencement date or enforcing notification; neither does the companion Analysis of Rates.
RETRIEVED
2026-07-29

Transcribed from Arunachal Pradesh PWD — APSR 2023, Schedule of Rates for Building Works and Services (zero lead based, excluding carriage cost), published under the authority of the Chief Engineer (CSQ), PWD Arunachal Pradesh, Itanagar; issued on the department's Schedule of Rates page 30 December 2024. For reference only. Departments amend rates through correction slips between editions, so verify against the official source before pricing a bid. Items we could not transcribe unambiguously have been left out.

S-02/CHAPTERS21 CHAPTERS

Browse by chapter

1,002 items across 21 chapters. Each chapter is searchable and sortable.

S-03/HOW TO USEARUNACHAL PRADESH

How to use the Arunachal Pradesh Schedule of Rates

The building schedule of rates sets the department's accepted rate for each item of work, and estimates for Arunachal Pradesh government projects are built by mapping a project's Bill of Quantities to these items. Rates here run from ₹0.30 per litre to ₹91,706.80 per cum, spanning 21 chapters from earthwork through to finishing trades.

Three things routinely go wrong. Estimators price against a superseded edition, because correction slips are published separately from the main schedule. They pick a nearly-similar item code rather than the exact one, which can pass an internal review and still be rejected by the department. And they miss that a rate is quoted for a different unit than the BOQ uses. A litre rate applied to a cum quantity is a large error that looks reasonable on a spreadsheet.

For the schedules published by every other state, see the Schedule of Rates by state directory, and for how SOR items relate to a tender's BOQ, the guide to SOR vs BOQ.

ARCHED / ESTIMATING

Pricing a live tender against this schedule

Mapping a tender BOQ to the right SOR items by hand, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.