Skip to main content
R/ARUNACHAL PRADESH SOR 2023

Temporary Item rates

19 temporary item items from the Arunachal Pradesh PWD, effective 2024-12-30.
Items
19
Lowest rate
₹16.10
Highest rate
₹11,299.00
Effective from
2024-12-30
S-01/RATE ITEMS19 ITEMS

Temporary Item rates in the Arunachal Pradesh Building Schedule of Rates 2023 run from ₹16.10 to ₹11,299.00. Transcribed from Arunachal Pradesh PWD — APSR 2023, Schedule of Rates for Building Works and Services (zero lead based, excluding carriage cost), published under the authority of the Chief Engineer (CSQ), PWD Arunachal Pradesh, Itanagar; issued on the department's Schedule of Rates page 30 December 2024. For reference only: verify against the official source before pricing a bid.

Download the full schedule (Excel)All 21 chapters
Unit

19 items. Scroll the table to browse

DescriptionUnit
1.1(a)Mild steel reinforment for RCC workQuintal10,894.30
1.1(d)Applying Coal tarring, two coats on new wood workSqm59.40
1.1(e)Second class brick work in cement mortar 1 : 6 (1 cement : 6 coarse sand)Cum8,249.70
1.2(a)Painting on brick flooring with cement mortar 1 : 2 (1 cement : 2 fine sand)Flush paintingSqm118.50
1.4(a)Cement concrete 1 : 1 : 2 (1 cement : 1 coarse sand : 2 stone aggregate 20 mm nominal size)Cum11,299.00
1.4(c)Centring and shuttering including strutting, propping (for chajjas) etcSqm1,075.70
1.4(d)Extra labour for RCC workCum262.90
1.5(a)Wooden plugs including cutting brick work and fixing in cement mortarEach16.10
1.5(b)Applying priming coat with ready mixed primer of approved brand and manufacture on wood work completeSqm59.20
1.6(a)Applying priming coat with ready mixed red lead paint of approved brand and manufacture on steel workSqm56.50
1.6(b)Applying priming coat with ready mixed zinc chromate yellow primer of approved brand and manufacture on steel, galvanized iron/steel worksSqm47.10
1.7Second class brick edging with full brick width and half brick depth including excavation, refilling and disposal of surplus earth lead up to 50 mMetre201.10
1.8(a)Providing 2nd class 50 x 50 x 50 mm Indian teak wood plugs including cutting brick work and fixing in cement mortar 1 : 3 (1 cement : 3 fine sand)Each23.60
1.8(b)Painting two or more coats (excluding priming coat) with ordinary ready mixed paint of approved brand and manufacture in all shades except white or green on new work to give an even shadeSqm149.70
1.8(c)Painting CI cistern with bitumastic or any other anti-corrosive paint inside and white paint over a coat of ready mixed primer on the outside surface of the cistern, flush, pipe, other fittings etc. complete for new workEach794.00
1.9(a)Pre-cast cement concrete blocks of size 40 x 40 x 10 cmEach109.80
1.10Mud plasteringSqm87.50
1.11(b)Brick flooring with best quality brick in cement mortar 1 : 4Sqm1,201.70
1.11(c)Providing and laying cement concrete 1 : 2 : 4 with jhama aggregateCum7,064.40
S-02/SOURCE RECORD2023
ISSUED BY
Arunachal Pradesh PWD
EFFECTIVE
2024-12-30Date the department published this edition on its Schedule of Rates page. APSR 2023 names only the year 2023 on its cover and prints no commencement date or enforcing notification; neither does the companion Analysis of Rates.
RETRIEVED
2026-07-29
S-03/CHAPTERS20 MORE

Other chapters in this schedule

SHOW ALL 20 CHAPTERS
ARCHED / ESTIMATING

Pricing temporary item against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.