Arunachal Pradesh SOR 2023
Dismantling rates
43 dismantling items from the Arunachal Pradesh PWD, effective 2024-12-30.
Dismantling rates in the Arunachal Pradesh Building Schedule of Rates 2023 run from ₹4.30 to ₹2,640.40. Transcribed from Arunachal Pradesh PWD — APSR 2023, Schedule of Rates for Building Works and Services (zero lead based, excluding carriage cost), published under the authority of the Chief Engineer (CSQ), PWD Arunachal Pradesh, Itanagar; issued on the department's Schedule of Rates page 30 December 2024. Reference only — verify against the official source before pricing a bid.
43 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 15.1 | Demolishing lime concrete and disposal of material within 50 m lead | Cum | 464.20 |
| 15.2 | Demolishing cement concrete 1 : 3 : 6 or richer mix including disposal off material within 50 metres lead | Cum | 1,325.60 |
| 15.3 | Demolishing cement concrete 1 : 4 : 8 or leaner mix including disposal of material within 50 m lead | Cum | 819.60 |
| 15.4 | Demolishing RCC work including stacking of steel bars and disposal of un-serviceable materials within 50 metres lead | Cum | 1,933.80 |
| 15.5 | Demolishing RB work including stacking of steel bars and disposal of unserviceable materials within 50 m lead | Cum | 1,731.30 |
| 15.6 | Extra for cutting reinforcement bars in RCC or RB work | Sqm | 671.20 |
| 15.7 | Extra for scrapping, cleaning and straightening reinforcement from RCC or RB work. Total weight = 94.80 Kg or 0.948 Quintal | Quintal | 512.10 |
| 15.8 | Demolishing brick work in mud mortar including stacking of serviceable material and disposal of unserviceable materials within 50 metres lead | Cum | 384.20 |
| 15.9 | Demolishing brick work in lime mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead | Cum | 464.20 |
| 15.10 | Demolishing brick work in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead | Cum | 1,123.10 |
| 15.11(a) | Removing mortar from and cleaning bricks (Stacks of clean bricks shall be measured)From brick work in mud mortar | Cum | 1,292.90 |
| 15.11(b) | Removing mortar from and cleaning bricks (Stacks of clean bricks shall be measured)From brick work in lime mortar | Cum | 1,502.20 |
| 15.11(c) | Removing mortar from and cleaning bricks (Stacks of clean bricks shall be measured)From brick work in cement mortar | Cum | 1,894.10 |
| 15.12 | Dismantling wood work of sectional area 40 Sq.cm. and above wrought, framed and fixed in frames, other frames and trusses including stacking the material within 50 m lead | Cum | 2,640.40 |
| 15.13 | Dismantling wood work of sectional area below 40 Sq.cm. and above wrought, framed and fixed in frames, other frames and trusses including stacking the material within 50 m lead | Metre | 10.60 |
| 15.16 | Dismantling wooden chajjas and sunshades including stacking of serviceable material and disposal of unserviceable material within 50 m lead | Sqm | 82.40 |
| 15.17 | Dismantling steel work in single section in RS joists including dismembering and stacking within 50 m lead | Quintal | 182.90 |
| 15.18 | Dismantling steel work in single section in channels, angles, tees and flats including dismembering and stacking within 50 m lead | Quintal | 125.70 |
| 15.19 | Dismantling steel work in built up section in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc including dismembering and stacking within 50 m lead | Quintal | 315.80 |
| 15.20 | Dismantling steel work in built up section excluding dismembering and stacking within 50 m lead | Quintal | 202.90 |
| 15.21 | Extra for dismantling trusses, rafters, purlins etc of steel work for every additional span of one metre or part thereof beyond 10 m | Quintal | 46.10 |
| 15.22 | Extra for marking structural steel work requried to be re-erected | Quintal | 274.20 |
| 15.23(a) | Dismantling the tile work in floors and roofs laid in cement including stacking of materials within 50 m leadFor thickness of tiles 10 mm to 25 mm | Sqm | 43.20 |
| 15.23(b) | Dismantling the tile work in floors and roofs laid in cement including stacking of materials within 50 m leadFor thickness of tiles above 25 mm and up to 40 mm | Sqm | 68.10 |
| 15.24 | Dismantling dry brick pitching in floors, drains etc including stacking of serviceable material and disposal of unserviceable material within 50 m lead | Cum | 717.40 |
| 15.25 | Dismantling GI sheet roofing including ridges, hips, valleys and gutters etc and stacking the material within 50 m lead | Sqm | 95.00 |
| 15.26 | Dismantling asbestos sheet roofing including ridges, hips, valleys and gutters stacking the material within 50 m lead | Sqm | 44.00 |
| 15.27 | Demolishing thatch roofing including mats, bamboo jafri etc complete including stacking of serviceable material and disposal of unserviceable material within 50 m lead | Sqm | 31.20 |
| 15.28 | Dismantling ballies in posts, purlins or rafters including stacking within 50 m lead | Metre | 11.50 |
| 15.29(a) | Dismantling CI or asbestos, rain water pipes with fittings and clamps including stacking the materials within 50 m lead75 mm dia pipe | Metre | 41.30 |
| 15.29(b) | Dismantling CI or asbestos, rain water pipes with fittings and clamps including stacking the materials within 50 m lead100 mm dia pipe | Metre | 42.50 |
| 15.29(c) | Dismantling CI or asbestos, rain water pipes with fittings and clamps including stacking the materials within 50 m lead150 mm dia pipe | Metre | 49.40 |
| 15.30 | Dismantling of barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 m lead | Quintal | 2,006.50 |
| 15.31 | Dismantling wooden trellis work in position excluding frames but including stacking the serviceable material within 50 m lead | Sqm | 50.60 |
| 15.32 | Dismantling expanded metal or IRC fabrics in the necessary battens and beading including stacking the sreviceable material within 50 m lead | Sqm | 42.10 |
| 15.33(a) | Dismantling wooden boarding in lining of walls and partitions excluding supporting members but including stacking within 50 m leadUp to 10 mm thick | Sqm | 34.60 |
| 15.33(b) | Dismantling wooden boarding in lining of walls and partitions excluding supporting members but including stacking within 50 m leadThickness above 10 mm and up to 25 mm | Sqm | 44.10 |
| 15.33(c) | Dismantling wooden boarding in lining of walls and partitions excluding supporting members but including stacking within 50 m leadThickness above 25 mm and up to 40 mm | Sqm | 50.50 |
| 15.34(a) | Dismantling precast concrete or stone slabs in wall, partition walls etc including stacking within 50 m leadThickness up to 38 mm | Sqm | 159.20 |
| 15.34(b) | Dismantling precast concrete or stone slabs in wall, partition walls etc including stacking within 50 m leadThickness above 38 mm and up to 75 mm | Sqm | 238.60 |
| 15.35 | Dismantling cement, asbestos, celotax or other ceiling or partition hard board partition wall including stacking of serviceable materials and disposal of unserviceable materials within 50 m lead | Sqm | 32.50 |
| 15.36(a) | Dismantling and stacking within 50 m lead fencing posts or struts including all earth work and dismantling of concrete etc in the base ofI or L iron or pipes | Each | 115.00 |
| 15.37 | Cutting ballies or wooden posts of fencing at the point of projection above the concrete or ground and stacking the same within 50 m lead | Each | 4.30 |
Other chapters in this schedule
- Temporary Item (19)
- Earth Work (33)
- Mortar (16)
- Concrete Work (49)
- RCC Work (53)
- Brick Work (21)
- Stone Work (23)
- Walling (10)
- Wood Work (88)
- Steel Work (34)
- Flooring (97)
- Roofing (85)
- Finishing (102)
- Repair of Buildings (26)
- Miscellaneous (57)
- Drainage (21)
- Water Supply (118)
- Sanitary Installation (70)
- Aluminium Work (25)
- PVC & uPVC Work (12)
Pricing dismantling against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works