Brick Work rates
- Items
- 21
- Lowest rate
- ₹23.70
- Highest rate
- ₹10,771.40
- Effective from
- 2024-12-30
Brick Work rates in the Arunachal Pradesh Building Schedule of Rates 2023 run from ₹23.70 to ₹10,771.40. Transcribed from Arunachal Pradesh PWD — APSR 2023, Schedule of Rates for Building Works and Services (zero lead based, excluding carriage cost), published under the authority of the Chief Engineer (CSQ), PWD Arunachal Pradesh, Itanagar; issued on the department's Schedule of Rates page 30 December 2024. For reference only: verify against the official source before pricing a bid.
21 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 6.1 | Brick work with best available local bricks in foundation and plinth in cement mortar 1:3 (1 cement : 3 fine sand) | Cum | 10,771.40 |
| 6.2 | Brick work with best available local bricks in foundations and plinth in cement mortar 1:4 (1 cement : 4 fine sand) | Cum | 10,420.40 |
| 6.3 | Brick work with best available local bricks in foundations and plinth in cement mortar 1:5 (1 cement : 5 fine sand) | Cum | 10,231.50 |
| 6.4 | Brick work with best available local bricks in foundations and plinth in cement mortar 1:6 (1 cement : 6 fine sand) | Cum | 10,069.50 |
| 6.5 | Extra for brick work with best available local bricks in superstructure above plinth level up to floor two level | Cum | 314.50 |
| 6.7 | Deduct for using 2nd class bricks instead of 1st class, in plain brick work | Cum | 656.60 |
| 6.8 | Extra for brick work in square or rectangular pillars | Cum | 528.50 |
| 6.9 | Extra for using best available local bricks in circular pillar | Cum | 3,488.80 |
| 6.10 | Extra for making tapered surface of brick masonry | Sqm | 612.10 |
| 6.11 | Half brick masonry (with best available local bricks) in cement mortar 1:3 (1 cement : 3 coarse sand) in foundation and plinth | Sqm | 1,319.60 |
| 6.12 | Half brick masonry (with best available local bricks) in cement mortar 1:4 (1 cement : 4 coarse sand) in foundation and plinth | Sqm | 1,279.70 |
| 6.13 | Extra for half brick masonry in superstructure above plinth level and up to floor two level | Sqm | 58.50 |
| 6.16 | Brick work with best available local bricks 75 mm thick in cement mortar 1:3 (1 cement : 3 coarse sand) | Sqm | 920.10 |
| 6.17 | Extra for cutting or chamfering of bricks to required shape in masonry work | Metre | 23.70 |
| 6.18 | Best quality local brick honey-comb half brick work in cement mortar 1:4 (1 cement : 4 fine sand) | Sqm | 889.70 |
| 6.20 | Best quality local brick honey-comb half brick work in cement mortar 1:6 (1 cement : 6 fine sand) | Sqm | 861.60 |
| 6.22 | Exra for laying brick work in or under foul position | Cum | 354.90 |
| 6.23 | Joining old brick work with new work | Sqm | 479.80 |
| 6.24 | Providing 75 mm thick 1st class brick drip course at junctions of roofs and walls in cement mortar 1:4 (1 cement : 4 fine sand) | Metre | 125.10 |
| 6.25 | Providing 1st class brick on edge drip course at junctions of roofs and walls in cement mortar 1:6 (1 cement : 6 fine sand) | Metre | 185.10 |
| 6.26 | Providing 75 mm thick 6 cm projected 1st class brick string course in cement mortar 1:4 (1 cement : 4 fine sand) | Metre | 52.20 |
- ISSUED BY
- Arunachal Pradesh PWD
- EFFECTIVE
- 2024-12-30Date the department published this edition on its Schedule of Rates page. APSR 2023 names only the year 2023 on its cover and prints no commencement date or enforcing notification; neither does the companion Analysis of Rates.
- RETRIEVED
- 2026-07-29
Other chapters in this schedule
Pricing brick work against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.