Arunachal Pradesh SOR 2023
Mortar rates
16 mortar items from the Arunachal Pradesh PWD, effective 2024-12-30.
Mortar rates in the Arunachal Pradesh Building Schedule of Rates 2023 run from ₹541.90 to ₹25,471.50. Transcribed from Arunachal Pradesh PWD — APSR 2023, Schedule of Rates for Building Works and Services (zero lead based, excluding carriage cost), published under the authority of the Chief Engineer (CSQ), PWD Arunachal Pradesh, Itanagar; issued on the department's Schedule of Rates page 30 December 2024. Reference only — verify against the official source before pricing a bid.
16 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 3.1 | Cement mortar 1 : 1 (1 cement : 1 fine sand) | Cum | 10,157.70 |
| 3.2 | Cement mortar 1 : 2 (1 cement : 2 fine sand) | Cum | 7,218.00 |
| 3.3 | Cement mortar 1 : 3 (1 cement : 3 fine sand) | Cum | 5,749.00 |
| 3.4 | Cement mortar 1 : 4 (1 cement : 4 fine sand) | Cum | 4,566.00 |
| 3.5 | Cement mortar 1 : 5 (1 cement : 5 fine sand) | Cum | 3,929.00 |
| 3.6 | Cement mortar 1 : 6 (1 cement : 6 fine sand) | Cum | 3,383.00 |
| 3.7 | Lime mortar 1 : 2 (1 lime putty : 2 surkhi) | Cum | 5,207.20 |
| 3.8 | Mud mortar | Cum | 541.90 |
| 3.9 | Lime mortar 1 : 1 : 1 (1 lime putty : 1 surkhi : 1 fine sand) | Cum | 5,190.10 |
| 3.10 | Cement mortar 1 : 2 (1 cement : 2 coarse sand) | Cum | 7,218.00 |
| 3.11 | Cement mortar 1 : 3 (1 cement : 3 coarse sand) | Cum | 5,749.00 |
| 3.12 | Cement mortar 1 : 4 (1 cement : 4 coarse sand) | Cum | 4,566.00 |
| 3.13 | Cement mortar 1 : 5 (1 cement : 5 coarse sand) | Cum | 3,929.00 |
| 3.14 | Cement mortar 1 : 6 (1 cement : 6 coarse sand) | Cum | 3,383.00 |
| 3.15 | Cement mortar 1 : 2 (1 white cement : 2 marble dust) | Cum | 25,471.50 |
| 3.16 | Lime mortar 1 : 1 : 1 (1 lime : 1 surkhi : 1 coarse sand) | Cum | 5,190.10 |
Other chapters in this schedule
- Temporary Item (19)
- Earth Work (33)
- Concrete Work (49)
- RCC Work (53)
- Brick Work (21)
- Stone Work (23)
- Walling (10)
- Wood Work (88)
- Steel Work (34)
- Flooring (97)
- Roofing (85)
- Finishing (102)
- Repair of Buildings (26)
- Dismantling (43)
- Miscellaneous (57)
- Drainage (21)
- Water Supply (118)
- Sanitary Installation (70)
- Aluminium Work (25)
- PVC & uPVC Work (12)
Pricing mortar against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works