Skip to main content
R/2023

Madhya Pradesh Unified Schedule of Rates 2023

2,958 rate items from the Madhya Pradesh Public Health Engineering Department (PHED), effective 2023-09-01. Searchable, with Excel and CSV download.
Items reproduced
2,958
Chapters
22
Edition
2023
Effective from
2023-09-01
S-01/SOURCE RECORDRETRIEVED 2026-07-29
ISSUED BY
Madhya Pradesh Public Health Engineering Department (PHED)
EFFECTIVE
2023-09-01
RETRIEVED
2026-07-29

Transcribed from Madhya Pradesh PHED — Unified Schedule of Rates for Water Supply, Sewerage and Allied Works, in force from 1 September 2023. For reference only. Departments amend rates through correction slips between editions, so verify against the official source before pricing a bid. Items we could not transcribe unambiguously have been left out.

S-02/CHAPTERS22 CHAPTERS

Browse by chapter

2,958 items across 22 chapters. Each chapter is searchable and sortable.

S-03/SMALLER CHAPTERS2 ITEMS

Other items

2 items in 1 smaller chapters.

2 items. Scroll the table to browse

DescriptionUnit
25.3Cost of casing shoe (Guide Bush) for odex drilling Drilling of perfectly vertical bore hole by odex method of a diameter to receive 150 mm nominal diameter casing pipe up to desired depth below ground level inclusive of the labour charges for transporting, lowering and fixingEach5,060.00
25.6Cost of casing shoe (Guide Bush) for odex drilling MISCELLANEOUS ITEM OF TUBE WELL MISCELLANEOUS ITEM OF TUBE WELL 7 Rate HYDROFRACTURING AND CLEANING OF TUBE WELLEach5,850.00
S-04/HOW TO USEMADHYA PRADESH

How to use the Madhya Pradesh Schedule of Rates

The unified schedule of rates sets the department's accepted rate for each item of work, and estimates for Madhya Pradesh government projects are built by mapping a project's Bill of Quantities to these items. Rates here run from ₹2.00 per kg to ₹78,85,178.00 each, spanning 22 chapters from earthwork through to finishing trades.

Three things routinely go wrong. Estimators price against a superseded edition, because correction slips are published separately from the main schedule. They pick a nearly-similar item code rather than the exact one, which can pass an internal review and still be rejected by the department. And they miss that a rate is quoted for a different unit than the BOQ uses. A kg rate applied to a each quantity is a large error that looks reasonable on a spreadsheet.

For the schedules published by every other state, see the Schedule of Rates by state directory, and for how SOR items relate to a tender's BOQ, the guide to SOR vs BOQ.

ARCHED / ESTIMATING

Pricing a live tender against this schedule

Mapping a tender BOQ to the right SOR items by hand, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.