Skip to main content
R/MADHYA PRADESH SOR 2023

Construction of Gravel Packed Tube Well rates

5 construction of gravel packed tube well items from the Madhya Pradesh Public Health Engineering Department (PHED), effective 2023-09-01.
Items
5
Lowest rate
₹292.00
Highest rate
₹937.00
Effective from
2023-09-01
S-01/RATE ITEMS5 ITEMS

Construction of Gravel Packed Tube Well rates in the Madhya Pradesh Unified Schedule of Rates 2023 run from ₹292.00 to ₹937.00. Transcribed from Madhya Pradesh PHED — Unified Schedule of Rates for Water Supply, Sewerage and Allied Works, in force from 1 September 2023. For reference only: verify against the official source before pricing a bid.

Download the full schedule (Excel)All 22 chapters
Unit

5 items. Scroll the table to browse

DescriptionUnit
22.1.1Boulders etc. and retaining the bore hole by using suitable drilling mud or foam or temporary housing pipe including all works pertaining to drilling such as transportation, installation and removal of drilling machine etc. complete300mm diameterMetre882.00
22.1.2Boulders etc. and retaining the bore hole by using suitable drilling mud or foam or temporary housing pipe including all works pertaining to drilling such as transportation, installation and removal of drilling machine etc. complete350mm diameterMetre937.00
22.3.12800 (PART-I) 2019 in the bottom of casing assembly100mm diaEach292.00
22.3.22800 (PART-I) 2019 in the bottom of casing assembly150mm diaEach368.00
22.3.32800 (PART-I) 2019 in the bottom of casing assembly200mm dia Providing gravel packing with uniformly graded gravel as per I.S. 4097 of 2019 (revised up to date) in the annular space between outer wall ofEach450.00
S-02/SOURCE RECORD2023
ISSUED BY
Madhya Pradesh Public Health Engineering Department (PHED)
EFFECTIVE
2023-09-01
RETRIEVED
2026-07-29
S-03/CHAPTERS20 MORE

Other chapters in this schedule

SHOW ALL 20 CHAPTERS
ARCHED / ESTIMATING

Pricing construction of gravel packed tube well against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.