Tamil Nadu Water Works Schedule of Rates 2023-24
- Items reproduced
- 914
- Chapters
- 11
- Edition
- 2023-24
- Effective from
- 2024-01-23
- ISSUED BY
- Tamil Nadu Water Supply and Drainage (TWAD) Board
- EFFECTIVE
- 2024-01-23
- RETRIEVED
- 2026-07-29
Transcribed from Tamil Nadu TWAD Board — Standard Schedule of Rates 2023-24, effective 23 January 2024. For reference only. Departments amend rates through correction slips between editions, so verify against the official source before pricing a bid. Items we could not transcribe unambiguously have been left out.
Browse by chapter
914 items across 11 chapters. Each chapter is searchable and sortable.
- 01Rates for Building Materials74
- 02Rates for Earthwork Excavation Other Than Pipe Laying Works and Open Wells29
- 03Rates for Earthwork Excavation Pipe Laying Works for Water Supply and Sewerage Works8
- 04Rates for Electrical Items223
- 05Rates for Electromechanical Items12
- 06Rates for Labour80
- 07Rates for Materials28
- 08Rates for Miscellaneous Items182
- 09Rates for Other Construction Materials194
- 10Rates for Pumpsets76
- 11Rates for Works8
How to use the Tamil Nadu Schedule of Rates
The water works schedule of rates sets the department's accepted rate for each item of work, and estimates for Tamil Nadu government projects are built by mapping a project's Bill of Quantities to these items. Rates here run from ₹1.07 per rm to ₹38,62,111.00 each, spanning 11 chapters from earthwork through to finishing trades.
Three things routinely go wrong. Estimators price against a superseded edition, because correction slips are published separately from the main schedule. They pick a nearly-similar item code rather than the exact one, which can pass an internal review and still be rejected by the department. And they miss that a rate is quoted for a different unit than the BOQ uses. A rm rate applied to a nos quantity is a large error that looks reasonable on a spreadsheet.
For the schedules published by every other state, see the Schedule of Rates by state directory, and for how SOR items relate to a tender's BOQ, the guide to SOR vs BOQ.
Pricing a live tender against this schedule
Mapping a tender BOQ to the right SOR items by hand, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.