Tamil Nadu SOR 2023-24
Rates for Electromechanical Items rates
12 rates for electromechanical items items from the Tamil Nadu Water Supply and Drainage (TWAD) Board, effective 2024-01-23.
Rates for Electromechanical Items rates in the Tamil Nadu Water Works Schedule of Rates 2023-24 run from ₹301.00 to ₹23,626.00. Transcribed from Tamil Nadu TWAD Board — Standard Schedule of Rates 2023-24, effective 23 January 2024. Reference only — verify against the official source before pricing a bid.
12 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| a | Voltmeter Selector Switch - 6A | Each | 301.00 |
| a | LED type, CT/PT, Voltage, Current, Frequency, Kilowatt, Kilo Volt Ampere, KVAR, KVAH, Run Hours, unbalance(V,A),Rpm, Phase angles,Thd - Class 1 With RS 485 Port | Each | 19,331.00 |
| a | SR 65 5D/5A C.T.operated-AC | Each | 597.00 |
| a | Voltmeter- Single Phase Class 1-AC | Each | 2,775.00 |
| a | Voltmeter SR 65 600V-AC | Each | 653.00 |
| b | Ammeter Selector Switch - 6A | Each | 580.00 |
| b | LED type, CT/PT, Voltage, Current, Frequency, Kilowatt, Kilo Volt Ampere, KVAR, KVAH, Run Hours, unbalance(V,A), Rpm, Phase angles,Thd - Class 0.5 With RS 485 Port | Each | 23,626.00 |
| b | SR 72 5D/5A C.T.operated-AC | Each | 774.00 |
| b | Voltmeter- Three Phase Class 1-AC | Each | 3,740.00 |
| b | Voltmeter SR 72 500V-AC | Each | 855.00 |
| c | SR 96 5D/5A C.T.operated-AC | Each | 828.00 |
| c | Voltmeter SR 96 600V-AC | Each | 948.00 |
Other chapters in this schedule
- Rates for Building Materials (74)
- Rates for Earthwork Excavation Other Than Pipe Laying Works and Open Wells (29)
- Rates for Earthwork Excavation Pipe Laying Works for Water Supply and Sewerage Works (8)
- Rates for Electrical Items (223)
- Rates for Labour (80)
- Rates for Materials (28)
- Rates for Miscellaneous Items (182)
- Rates for Other Construction Materials (194)
- Rates for Pumpsets (76)
- Rates for Works (8)
Pricing rates for electromechanical items against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works