Tamil Nadu SOR 2023-24
Rates for Labour rates
80 rates for labour items from the Tamil Nadu Water Supply and Drainage (TWAD) Board, effective 2024-01-23.
Rates for Labour rates in the Tamil Nadu Water Works Schedule of Rates 2023-24 run from ₹513.00 to ₹1,216.00. Transcribed from Tamil Nadu TWAD Board — Standard Schedule of Rates 2023-24, effective 23 January 2024. Reference only — verify against the official source before pricing a bid.
80 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 1 | Technical Assistant Gr.I (BE passed) | Day | 1,216.00 |
| 3 | Technical Assistant Gr.III (Diploma in | Day | 926.00 |
| 4 | Engg. Failed / ITI (Civil) passedLaboratory Assistant. Gr.I | Day | 926.00 |
| 5 | Laboratory Assistant. Gr.II (Degree in Science/ | Day | 849.00 |
| 6 | Laboratory Assistant Grade III (with Degree qualification to work as works clerk) | Day | 763.00 |
| 7 | B.Sc., (Agriculture) Passed- Technical Assistant | Day | 1,096.00 |
| 8 | Computer Operator Gr.I [B.E. (Computer | Day | 1,216.00 |
| 9 | Computer Operator Gr.II [B.Sc., (Computer | Day | 1,096.00 |
| 10 | Wireman Grade I/ Electrician Grade I | Day | 826.00 |
| 12 | Irrigation Community Organiser Grade II | Day | 976.00 |
| 13 | SKILLED CATEGORYBlacksmith - 1st Class | Day | 769.00 |
| 14 | SKILLED CATEGORYCarpenter I Class | Day | 976.00 |
| 15 | SKILLED CATEGORYCleaner I Gr | Day | 519.00 |
| 16 | SKILLED CATEGORYFitter I Class | Day | 881.00 |
| 17 | Fitter (Pipe laying / Bar bending) I Class | Day | 866.00 |
| 18 | SKILLED CATEGORYFloor Polisher | Day | 769.00 |
| 19 | SKILLED CATEGORYHammer Mazdoor | Day | 618.00 |
| 20 | SKILLED CATEGORYDriver (Light duty) | Day | 769.00 |
| 21 | SKILLED CATEGORYDriver (Heavy duty) | Day | 820.00 |
| 24 | Mason for Brick Work - I Class | Day | 999.00 |
| 25 | Mason for Stone Work - I Class | Day | 999.00 |
| 26 | Mechanic - 1st Class | Day | 769.00 |
| 27 | Painter/Varnisher-I Class | Day | 797.00 |
| 29 | Plumber I Class | Day | 866.00 |
| 31 | Smith 1st Class | Day | 766.00 |
| 32 | Stone cutter- I Class | Day | 766.00 |
| 33 | Syrang-1st Class | Day | 766.00 |
| 34 | Tinker 1 st Class | Day | 618.00 |
| 35 | Turner 1 st Class | Day | 708.00 |
| 36 | Time Keeper Ist Class | Day | 766.00 |
| 37 | Welder/ Bracer - I Class | Day | 766.00 |
| 39 | Compressor Operator | Day | 677.00 |
| 40 | Geological Assistant | Day | 947.00 |
| 41 | Stone & Crusher Operator | Day | 677.00 |
| 42 | Wireman Grade II/ Electrician Grade II | Day | 820.00 |
| 43 | Lift Operator | Day | 740.00 |
| 44 | Laboratory Attendant | Day | 551.00 |
| 45 | Sound Service Operator | Day | 618.00 |
| 46 | Electrical Maistry | Day | 947.00 |
| 47 | Boat Mazdoor | Day | 644.00 |
| 48 | Head Mazdoor for Well sinking | Day | 644.00 |
| 49 | Moplah - I Class | Day | 766.00 |
| 50 | Navagonies or Javali Man - 1st Class | Day | 644.00 |
| 51 | Well Diver for removing silt - 1 st Class | Day | 766.00 |
| 52 | Well sinker - 1st Class | Day | 866.00 |
| 54 | SEMI SKILLED CATEGORYAxe Mazdoor | Day | 608.00 |
| 55 | SEMI SKILLED CATEGORYBlacksmith - 2nd Class | Day | 738.00 |
| 56 | Bullocks pair with driver (with bandy) | Day | 1,204.00 |
| 57 | Bullocks single with driver (with bandy) | Day | 866.00 |
| 58 | SEMI SKILLED CATEGORYCarpenter II Class | Day | 932.00 |
| 59 | SEMI SKILLED CATEGORYCleaner II Gr | Day | 513.00 |
| 60 | SEMI SKILLED CATEGORYFitter II Class | Day | 856.00 |
| 61 | Fitter (Pipe laying / Bar bending) II Class | Day | 839.00 |
| 63 | Jumper Mazdoor | Day | 608.00 |
| 64 | Mason for Brick Work - II Class | Day | 932.00 |
| 65 | Mason for Stone Work - II Class | Day | 932.00 |
| 66 | Mazdoor Category I | Day | 651.00 |
| 67 | Head Mazdoor | Day | 674.00 |
| 68 | Mechanic - 2nd Class | Day | 738.00 |
| 69 | Painter/Varnisher-II Class | Day | 772.00 |
| 70 | Plumber II Class | Day | 839.00 |
| 72 | Smith 2nd Class | Day | 738.00 |
| 73 | Stone cutter- II Class | Day | 738.00 |
| 74 | Syrang-2 nd Class | Day | 738.00 |
| 76 | Tinker 2 nd Class | Day | 608.00 |
| 77 | Turner 2 nd Class | Day | 674.00 |
| 78 | Time Keeper 2nd Class | Day | 738.00 |
| 79 | Welder/ Bracer - II Class | Day | 738.00 |
| 80 | Mazdoor employed for Geological maping | Day | 652.00 |
| 82 | Sampling and Drilling worksMazdoor employed for Geophysical | Day | 652.00 |
| 83 | Head Mazdoor to supervise exploratory works | Day | 688.00 |
| 84 | Mixer Operator (including concrete mixer ) | Day | 708.00 |
| 85 | Investigation worksMixer Driver | Day | 674.00 |
| 86 | Investigation worksHeavy Mazdoor | Day | 708.00 |
| 87 | Investigation worksElectrical Helper | Day | 644.00 |
| 88 | Investigation worksFerry Mazdoor | Day | 674.00 |
| 89 | Investigation worksMoplah - II Class | Day | 738.00 |
| 90 | Well Diver for removing silt - 2nd Class | Day | 738.00 |
| 91 | Investigation worksWell sinker - 2nd Class | Day | 839.00 |
| 92 | UN- SKILLED CATEGORYMazdoor Category II | Day | 534.00 |
Other chapters in this schedule
- Rates for Building Materials (74)
- Rates for Earthwork Excavation Other Than Pipe Laying Works and Open Wells (29)
- Rates for Earthwork Excavation Pipe Laying Works for Water Supply and Sewerage Works (8)
- Rates for Electrical Items (223)
- Rates for Electromechanical Items (12)
- Rates for Materials (28)
- Rates for Miscellaneous Items (182)
- Rates for Other Construction Materials (194)
- Rates for Pumpsets (76)
- Rates for Works (8)
Pricing rates for labour against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works