R/TAMIL NADU SOR 2023-24
Rates for Labour rates
80 rates for labour items from the Tamil Nadu Water Supply and Drainage (TWAD) Board, effective 2024-01-23.
- Items
- 80
- Lowest rate
- ₹513.00
- Highest rate
- ₹1,216.00
- Effective from
- 2024-01-23
S-01/RATE ITEMS80 ITEMS
Rates for Labour rates in the Tamil Nadu Water Works Schedule of Rates 2023-24 run from ₹513.00 to ₹1,216.00. Transcribed from Tamil Nadu TWAD Board — Standard Schedule of Rates 2023-24, effective 23 January 2024. For reference only: verify against the official source before pricing a bid.
/
80 items. Scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 1 | Technical Assistant Gr.I (BE passed) | Day | 1,216.00 |
| 3 | Technical Assistant Gr.III (Diploma in | Day | 926.00 |
| 4 | Engg. Failed / ITI (Civil) passedLaboratory Assistant. Gr.I | Day | 926.00 |
| 5 | Laboratory Assistant. Gr.II (Degree in Science/ | Day | 849.00 |
| 6 | Laboratory Assistant Grade III (with Degree qualification to work as works clerk) | Day | 763.00 |
| 7 | B.Sc., (Agriculture) Passed- Technical Assistant | Day | 1,096.00 |
| 8 | Computer Operator Gr.I [B.E. (Computer | Day | 1,216.00 |
| 9 | Computer Operator Gr.II [B.Sc., (Computer | Day | 1,096.00 |
| 10 | Wireman Grade I/ Electrician Grade I | Day | 826.00 |
| 12 | Irrigation Community Organiser Grade II | Day | 976.00 |
| 13 | SKILLED CATEGORYBlacksmith - 1st Class | Day | 769.00 |
| 14 | SKILLED CATEGORYCarpenter I Class | Day | 976.00 |
| 15 | SKILLED CATEGORYCleaner I Gr | Day | 519.00 |
| 16 | SKILLED CATEGORYFitter I Class | Day | 881.00 |
| 17 | Fitter (Pipe laying / Bar bending) I Class | Day | 866.00 |
| 18 | SKILLED CATEGORYFloor Polisher | Day | 769.00 |
| 19 | SKILLED CATEGORYHammer Mazdoor | Day | 618.00 |
| 20 | SKILLED CATEGORYDriver (Light duty) | Day | 769.00 |
| 21 | SKILLED CATEGORYDriver (Heavy duty) | Day | 820.00 |
| 24 | Mason for Brick Work - I Class | Day | 999.00 |
| 25 | Mason for Stone Work - I Class | Day | 999.00 |
| 26 | Mechanic - 1st Class | Day | 769.00 |
| 27 | Painter/Varnisher-I Class | Day | 797.00 |
| 29 | Plumber I Class | Day | 866.00 |
| 31 | Smith 1st Class | Day | 766.00 |
| 32 | Stone cutter- I Class | Day | 766.00 |
| 33 | Syrang-1st Class | Day | 766.00 |
| 34 | Tinker 1 st Class | Day | 618.00 |
| 35 | Turner 1 st Class | Day | 708.00 |
| 36 | Time Keeper Ist Class | Day | 766.00 |
| 37 | Welder/ Bracer - I Class | Day | 766.00 |
| 39 | Compressor Operator | Day | 677.00 |
| 40 | Geological Assistant | Day | 947.00 |
| 41 | Stone & Crusher Operator | Day | 677.00 |
| 42 | Wireman Grade II/ Electrician Grade II | Day | 820.00 |
| 43 | Lift Operator | Day | 740.00 |
| 44 | Laboratory Attendant | Day | 551.00 |
| 45 | Sound Service Operator | Day | 618.00 |
| 46 | Electrical Maistry | Day | 947.00 |
| 47 | Boat Mazdoor | Day | 644.00 |
| 48 | Head Mazdoor for Well sinking | Day | 644.00 |
| 49 | Moplah - I Class | Day | 766.00 |
| 50 | Navagonies or Javali Man - 1st Class | Day | 644.00 |
| 51 | Well Diver for removing silt - 1 st Class | Day | 766.00 |
| 52 | Well sinker - 1st Class | Day | 866.00 |
| 54 | SEMI SKILLED CATEGORYAxe Mazdoor | Day | 608.00 |
| 55 | SEMI SKILLED CATEGORYBlacksmith - 2nd Class | Day | 738.00 |
| 56 | Bullocks pair with driver (with bandy) | Day | 1,204.00 |
| 57 | Bullocks single with driver (with bandy) | Day | 866.00 |
| 58 | SEMI SKILLED CATEGORYCarpenter II Class | Day | 932.00 |
| 59 | SEMI SKILLED CATEGORYCleaner II Gr | Day | 513.00 |
| 60 | SEMI SKILLED CATEGORYFitter II Class | Day | 856.00 |
| 61 | Fitter (Pipe laying / Bar bending) II Class | Day | 839.00 |
| 63 | Jumper Mazdoor | Day | 608.00 |
| 64 | Mason for Brick Work - II Class | Day | 932.00 |
| 65 | Mason for Stone Work - II Class | Day | 932.00 |
| 66 | Mazdoor Category I | Day | 651.00 |
| 67 | Head Mazdoor | Day | 674.00 |
| 68 | Mechanic - 2nd Class | Day | 738.00 |
| 69 | Painter/Varnisher-II Class | Day | 772.00 |
| 70 | Plumber II Class | Day | 839.00 |
| 72 | Smith 2nd Class | Day | 738.00 |
| 73 | Stone cutter- II Class | Day | 738.00 |
| 74 | Syrang-2 nd Class | Day | 738.00 |
| 76 | Tinker 2 nd Class | Day | 608.00 |
| 77 | Turner 2 nd Class | Day | 674.00 |
| 78 | Time Keeper 2nd Class | Day | 738.00 |
| 79 | Welder/ Bracer - II Class | Day | 738.00 |
| 80 | Mazdoor employed for Geological maping | Day | 652.00 |
| 82 | Sampling and Drilling worksMazdoor employed for Geophysical | Day | 652.00 |
| 83 | Head Mazdoor to supervise exploratory works | Day | 688.00 |
| 84 | Mixer Operator (including concrete mixer ) | Day | 708.00 |
| 85 | Investigation worksMixer Driver | Day | 674.00 |
| 86 | Investigation worksHeavy Mazdoor | Day | 708.00 |
| 87 | Investigation worksElectrical Helper | Day | 644.00 |
| 88 | Investigation worksFerry Mazdoor | Day | 674.00 |
| 89 | Investigation worksMoplah - II Class | Day | 738.00 |
| 90 | Well Diver for removing silt - 2nd Class | Day | 738.00 |
| 91 | Investigation worksWell sinker - 2nd Class | Day | 839.00 |
| 92 | UN- SKILLED CATEGORYMazdoor Category II | Day | 534.00 |
S-02/SOURCE RECORD2023-24
- ISSUED BY
- Tamil Nadu Water Supply and Drainage (TWAD) Board
- EFFECTIVE
- 2024-01-23
- RETRIEVED
- 2026-07-29
S-03/CHAPTERS10 MORE
Other chapters in this schedule
- Rates for Building Materials74
- Rates for Earthwork Excavation Other Than Pipe Laying Works and Open Wells29
- Rates for Earthwork Excavation Pipe Laying Works for Water Supply and Sewerage Works8
- Rates for Electrical Items223
- Rates for Electromechanical Items12
- Rates for Materials28
- Rates for Miscellaneous Items182
- Rates for Other Construction Materials194
- Rates for Pumpsets76
- Rates for Works8
ARCHED / ESTIMATING
Pricing rates for labour against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index and catching where rates have moved since the base edition takes time and is easy to get wrong. We can do it for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.