Skip to main content

Tamil Nadu SOR 2023-24

Rates for Miscellaneous Items rates

182 rates for miscellaneous items items from the Tamil Nadu Water Supply and Drainage (TWAD) Board, effective 2024-01-23.

Rates for Miscellaneous Items rates in the Tamil Nadu Water Works Schedule of Rates 2023-24 run from ₹2.05 to ₹15,320.03. Transcribed from Tamil Nadu TWAD Board — Standard Schedule of Rates 2023-24, effective 23 January 2024. Reference only — verify against the official source before pricing a bid.

182 items — scroll the table to browse

DescriptionUnit
1Earth work open well excavation, complying with relevant clauses of T.N.D.S.S. Well sinking and with lead up to 10 metres in sand, silt or other loose soil, Wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil - First depth of 2 metresCu.m74.85
1Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., completeCu.m52.35
1Concrete above ground levelAdd to the basic rate for works up to 4.50m height in ground floor (height to be reckoned from floor level i.e. plinth level in ground level)Cu.m119.85
1Concrete below ground levelAdd the basic rate for works above 1.5m depth and upto 4.5m depth below ground levelCu.m117.90
1Brick or stone masonry below ground levelAdd the basic rates for works above 1.5m depth and up to 4.5m depth below ground levelCu.m79.20
1Where vibrators are specified for consolidation in plain Cement concrete, this rate per cu.m over and above the provision made in the standard data book for consolidation with manual labour may be allowedCu.m69.80
1Clean removal of lime plaster from walls and racking out joints 20mm deep or from terraced roofs racking out joints 12mm deepSq.m9.40
1Thorough scrapping of old plastered surfaceSq.m4.20
1Removing old paint from doors and windows by blow lamp and scrapping, including removal and refitting of shuttersSq.m34.45
1Labour wrought and put up in position of frames inclusive of fixing holdfasts for doors, windows and ventilators etcCu.m13,690.00
1.aEarth work in all soils except hard rock requiring blasting and conveying for formation of bund with an extra lead of every 100 metre or part thereof deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., completeCu.m4.10
2Earth work open well excavation, complying with relevant clauses of T.N.D.S.S. Well sinking and with lead upto 10 metres in Hard stiff clay, stiff black cotton soil, hard red earth, shales,murrams gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil - First depth of 2 metresCu.m111.70
2Concrete below ground levelAdd the basic rate for works above 4.5m depth and upto 9.0 m depth below ground levelCu.m236.70
2Brick or stone masonry below ground levelAdd the basic rates for works above 4.5m depth and up to 9.0m depth below ground levelCu.m158.90
2Where vibrators are specified for consolidation in RCC, this rate per cu. m over and above the provision made in the standard data book for consolidation with manual labour may be allowedCu.m94.20
2Clean removal of lime plaster from wallsSq.m7.25
2Washing of plastered surface with soap, soda and water (or with soda, lime, brush and water)Sq.m5.25
2Removing old paint from doors and windows by scrapping and refitting of shuttersSq.m14.50
2Labour wrought and put up in position of shutters for fully panelled doors (external or internal) moulded panels including labour charges for fixing furniture fittings, complying with standard drawings and standard specificationSq.m1,537.00
3Earth work open well excavation, complying with relevant clauses of T.N.D.S.S. Well sinking and with lead up to 10 metres in soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting - First depth of 2 metresCu.m172.10
3Earth work excavation deploying earth moving machineries for desilting channel having a width of more than 10 m and forming bund on either side and depositing the earth on banks including jungle clearance etc., completeCu.m44.05
3Clean removal of cement plaster from wallsSq.m7.70
3Removing paint from doors, windows and wood works by manual labourSq.m9.85
3Labour wrought and put up in position of shutters for fully panelled doors internal five plywood panels including labour charges for fixing furniture fittings, complying with standard drawings and standard specificationSq.m1,281.00
4Labour charges for Painting TWAD Board Emblem in accordance with the size and specifications as approved by the Board on the Service Reservoirs including cost of all consumables, one coat of base paint, scaffolding charges including painting NRDWP Logo on the Service ReservoirsSqm3,104.60
4Open well excavation, complying with relevant clauses of T.N.D.S.S. Well sinking and with lead up to 10m in Medium rock and Dense medium rock not requiring blasting. First depth of 2 metresCu.m277.10
4Clean removal of cement plaster from walls and racking out joints 20mm deepSq.m10.20
4Removing old paint from structural steel by blow lamp or sand paperSq.m20.65
4Labour wrought and put up in position of shutters for glazed and panelled doors including labour charges for fixing furniture fittings, complying with standard drawings and standard specificationSq.m1,436.00
5Open well excavation complying with relevant clauses of T.N.D.S.S. well sinking and with lead up to 10m in Medium rock and Dense medium rock requiring blasting. First depth of 2 metresCu.m414.60
5Scrapping and removing old paint from structural steel by manual labourSq.m9.10
5Labour wrought and put up in position of shutters for framed and planked doors including labour charges for fixing furniture fittings, complying with standard drawings and standard specificationSq.m1,200.00
6Labour for refilling with sand the socket hollows of pipes including conveyance and stackingCu.m31.31
6Open well excavation complying with relevant clauses of T.N.D.S.S. well sinking and with lead up to 10m in hard granite measured in solid including blasting and stacking - First depth of 2 metresCu.m812.30
6Removing old paint from iron surface with sand paperSq.m8.55
6Labour wrought and put up in position of shutters for ledged and braced and planked doors including labour charges for fixing furniture fittings complying with standard drawings and standard specificationSq.m810.00
7Sinking well in loose soils, light black cotton soil, sandy loam and ordinary soil under water including bailing or pumping charges if necessary etc., complete - First depth of 2 metresCu.m115.97
7Repolishing the mosaic flooring including polishing stone and hire charges for polishing machine but excluding cost of electrical chargesSq.m20.30
7Labour wrought and put up in position of shutters for glazed windows including labour charges for fixing furniture fittings, complying with standard drawings and standard specificationSq.m1,436.00
8Sinking well in sand, including bailing or pumping charges if necessary etc. complete - First depth of 2 metresCu.m162.78
8Labour wrought and put up in position of shutters for windows panelled including labour charges for fixing furniture fittings, complying with standard drawings and standard specificationSq.m1,547.00
9Sinking well in hard stiff clay, light black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil including bailing or pumping charges if necessary etc. complete - First depth of 2 metresCu.m162.78
9Labour wrought and put up in position of shutters for windows, ledged, braced and planked doors including labour charges for fixing furniture fittings, complying with standard drawings and standard specificationSq.m810.00
10Labour wrought and put up in position frames, shutters for ventilators glazed fixed double frames and with wire netting complete fixed in position in accordance with standard drawings and standard specificationSq.m1,281.00
11Labour wrought and put up in position frames shutters for swing ventilators and fixed in position in accordance with standard drawings and standard specificationSq.m1,197.00
12Labour charges for fixing doors along with frames in position etc. complete(finished work)Sq.m228.50
13Labour charges for fixing windows and ventilators along with frames in position etc. completeSq.m286.60
14Labour wrought and put up in position flush shutters for single leaf shuttersSq.m214.10
15Labour wrought and put up in position flush shutters for Double leaf shuttersSq.m330.20
16Labour wrought and put up in position fly proof wire gauge shutters for doors, windows and ventilatorsSq.m825.00
17Labour wrought and put up for providing teak wood weld mesh screen with frames 3"x3" (0.075mx0.075m)Sq.m1,072.00
18Labour charges for fixing aluminium doors, windows and ventilatorsSq.m732.00
20Labour charges for putting bore holes of size 3" to 4" in river bed in sandy and other loose soils using hand boring sets including the cost of hire charges, conveyance charges of hand boring sets, collection of soil sample at frequent intervals and as directed by TWAD Board OfficersMetre534.64
21Desilting light or sandysoil or silt from infiltration wells below water level including the charges for special T&P and air compressor etc. completeCu.m2,128.10
37Conveyance of excavated earth from the narrow street (width less than 3.75m) to stock yard at nearest place (up to a lead of 5.00Km) including Head load charges from 10 meters to 100 meters and conveyance chargesCum125.69
38Re-Conveyance of earth from the stock yard to the narrow street (width less than 3.75m) for refilling the trenches after laying the pipe line (up to a lead of 5.00Km) including Head load charges from 10 meters to 100 meters and conveyance chargesCum125.69
39Disposal of surplus earth including loading and conveyance within a distance of 5 km (basic cost of earth is zero) including loading charges and Conveyance Charges of 5 kms distanceCum104.80
40Lighting arrangements (maintenance works) with gensetDay2,161.32
IUsing Hand Bore set (For Investigation purpose)Drilling of borewells of size 4" to 5" dia. in sedimentary formation using hand boresets including insertion of casing pipes and removal of casing pipes etc., including collection of samples as directed by the TWAD Board OfficersMetre737.59
aB.T. Roads (or) Maccadam roadCu.m845.44
aDrilling 140 / 150 mm dia Pilot Bore upto 60 m depth ending below ground levelMetre1,298.90
aClearing the siteClearing Heavy jungleSqm7.80
aHaving width upto 3 mCu.m30.85
aSize: 5 mm to 20mmCum4,491.32
a45. RATES FOR TRENCHLESS TECHNOLOGY FOR PIPE LAYING WORK IN RAILWAY/NHAI/SH/NH CROSSINGSFor 200mm dia MS encasing pipe for various thicknessRm9,880.00
bConcrete RoadsCu.m1,184.08
bUsing Hand Bore setDrilling of borewells of size 6" to 8" dia. in sedimentary formation using hand boreset including insertion of casing pipe etc., and supplying and packing of pebbles (Conveyance of hand bore set including loading and unloading to be done by the contractor)Metre1,165.53
bReaming from 140/150 mm dia pilot bore to 300 mm dia bore as directed by the TWAD Board Officers upto 60 m Depth ending from ground levelMetre366.47
bRemoving the chocked filter point with G.I. Pipes of 32 mm to 65 mm dia and re-erecting in another place within 1.00 KM radius after cleaning the filter points G.I. Pipes etc., Complete upto 8 m depthEach636.69
bLabour for tying barbed wire fencing vertically with required tensionMetre10.44
bClearing the siteClearing Light jungleSqm5.85
bHaving width of 3 m – 10 mCu.m37.85
bSize: 20 mm to 70 mmCum4,107.55
b45. RATES FOR TRENCHLESS TECHNOLOGY FOR PIPE LAYING WORK IN RAILWAY/NHAI/SH/NH CROSSINGSFor 250mm dia MS encasing pipe for various thicknessRm9,980.00
cLabour charges for inserting 150 mm dia M.S. Casing pipes assembly (With slots or without slots) in the drilled hole including welding the joints and packing annular space with pebbles of size and quality as approved by the Executive Engineer / TWAD BoardMetre329.36
cConveyance of Hand Pumps and its accessories from divisional stores to site of worksErection of shallow well hand pumpsEach585.66
cClearing the siteClearing Scrub jungleSqm5.40
c45. RATES FOR TRENCHLESS TECHNOLOGY FOR PIPE LAYING WORK IN RAILWAY/NHAI/SH/NH CROSSINGSFor 300mm dia MS encasing pipe for various thicknessRm10,100.00
dConveyance of Hand Pumps and its accessories from divisional stores to site of worksErection Extra deep well hand pumpsEach1,712.92
dClearing the siteUprooting and removing large palmyrah/ coconut stumpsEach161.00
eUsing Calyx DrillDrilling 4 1/2" dia meter bores by using In-Well rig in Hilly areasMetre1,561.00
eCharges for developing the borewell with air compressor of 300 CFM capacity (Minimum 8 Hours) including transportation labour and fuel charges for compressor as directed by TWAD Board Officers and conducting yield test by 'V' notch methodHour2,042.28
eClearing the siteUprooting and removing small palmyrah/ coconut stumpsEach115.65
fUsing Calyx DrillReaming from 6" Pilot bore to 12" size bore as directed by the TWAD Board OfficersMetre407.07
fDrilling of 12" dia vertical borewell so as to have a finished size of 6" dia borewell in boulder area to any required depth as decided by the TWAD Board Officers including Transportation from one place to anothr place with in Tamilnadu State by direct or reverse rotary mud circulation method using Contractor's rig tools, fuel, labourers, bentonite mud and water required for drilling at the site shown by the TWAD Officers including construction of mud pit etc. using only calyx rigsMetre2,499.22
fClearing the siteRemoving weeds in channel and drainSqm2.05
gUsing Calyx DrillLabour charges for inserting casing pipes assembly (With slot or without slot) in the drilled hole including welding the joint etc., complete and supplying and packing the annular space with pebbles of size and quality as approved by the Executive EngineerMetre389.67
gClearing the siteCleaning juliflora jungle with uprootingSqm8.90
hClearing the siteCleaning juliflora jungle without uprootingSqm6.75
iUsing Calyx DrillFor Hilly terrain areaMetre3,708.82
iRemoval of deep well hand pumps from borewellUp to 40 mEach1,326.73
iHire charges for Diesel Pump set for 3 HPHour255.75
iDismantling, clearing away and carefully stacking materials useful for reuse for any thickness of wallsBrick / stone in clay walls under 3 m highCu.m68.65
iBrick or stone masonry above ground levelAdd to the basic rates for works up to 4.50m height in ground floor (height to be reckoned from floor level i.e. plinth level in ground level)Cu.m78.90
iLabour charges for breaking 40mm metal from departmental blasted stonesCu.m406.10
iGrinding Mortar (Special Grinding lime)Cu.m368.20
iPetty iron work for truss, straps etc. (Wrought & fixed) labour onlyKG55.35
iBarricading work (Where, there is less traffic areas and broader roads etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia and 1.80m height) vertical with horizontal poles in three rows including painting the vertical poles in the road facing sides with ready mix paint, tying the vertical and horizontal poles with coir rope including fixing charges and fixing 75mm dia reflectors including earth work excavation for fixing vertical posts and finally removing and stacking the materials safely for further use etc., complete and as directed by TWAD Board officersRm55.00
iiUsing Hand Bore set (For Investigation purpose)Drilling of borewells of size 6" to 8" dia. in sedimentary formation using hand boresets including insertion of casing pipes and removal of casing pipes etc., including collection of samples as directed by the TWAD Board OfficersMetre864.00
iiUsing Calyx DrillFor Plain areaMetre3,064.01
iiDriving sheet piles for one metre length of gallery each side in sandy soilSecond depth of 2 mMetre1,174.81
iiRemoving sheet piles from one metre length of gallery on each side including stacking the sheet piles properlySecond depth of 2mMetre183.24
iiDrilling of 140/150 mm pilot boreFrom 60 m upto 90 m Depth ending from ground levelMetre1,929.79
iiReaming 300 mm dia pilot bore to 400mm/ 450mm dia bore as directed by the TWAD Board OfficerFrom 60 m depth and upto 90 m depth ending below ground levelMetre772.38
iiHire charges for Diesel Pump set for 5 HPHour322.72
iiDismantling, clearing away and carefully stacking materials useful for reuse for any thickness of wallsBrick / stone in clay walls, add for every additional 3 m or part there of over the initial height of 3 mCu.m22.75
iiBrick or stone masonry above ground levelAdd for works in every upper floor over the rate of preceeding floorCu.m159.20
iiDriving piles upto 15 cm dia in river bedRm26.99
iiLabour charges for breaking 20mm metal from departmental blasted stonesCu.m607.60
iiGrinding Mortar (Ordinary Grinding lime)Cu.m280.60
iiIron works for trusses & record racks (labour only)KG51.15
iiBarricading work (Where the lines are in narrow width of municipality area, busy streets like Market, Bus-stand and in the Highways etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia. and 1.80m height) vertical with horizontal poles in two rows, painting the vertical poles in the road facing sides with ready mix paint, tying the vertical and horizontal poles with coir rope including supplying, delivery and fixing of GI sheet (0.90m x 0.8mm thick) in the horizontal poles and fixing 75mm dia. reflectors including earth work excavation for fixing vertical posts and finally removing and stacking the materials safely for further use etc., complete and as directed by TWAD Board officersRm102.00
iiiDrilling of 140/150 mm pilot boreFrom 90 m upto 120 m Depth ending from ground levelMetre2,045.76
iiiReaming 140/150 mm dia pilot bore to 300mm dia bore as directed by the TWAD Board OfficerFrom 90 m upto 120 mt depth ending below ground levelMetre506.80
iiiBeyond 7.5 HP upto 20 HPEach15,320.03
iiiHire charges for Diesel Pump set for 7.5 HPHour439.44
iiiDismantling, clearing away and carefully stacking materials useful for reuse for any thickness of wallsMud / sun dried brick walls under 3 m highCu.m46.00
iiiPointing the edge and driving bamboo /casurina/ eucalyptus piles into river bed for the first 1m depth below ground levelEach23.05
iiiLabour charges for breaking 50mm metal from departmental blasted stonesCu.m243.70
iiiMixing Mortar – Cement by manualCu.m116.00
iiiFixing in position mild steel grills for windows, ventilators, etcKG32.00
ivDrilling of 140/150 mm pilot boreFrom 120 m upto 150 m Depth ending from ground levelMetre2,153.62
ivReaming 140/150 mm dia pilot bore to 300mm dia bore as directed by the TWAD Board OfficerFrom 120 m upto 150 mt depth ending below ground levelMetre514.92
ivHire charges for Diesel Pump set for 10 HPHour561.65
ivMud / sun dried brick walls, add for every additional 3 m or part thereof over the initial height of 3 mCu.m13.00
ivDriving bamboo/ Casurina/ eucalyptus piles into ground beyond 1m depth from ground level. For every 1m (or) part thereofRm23.04
ivMixing Mortar- Cement by Machine MixingCu.m152.90
ivFixing MS rods round/square for windowsKG29.65
ixDrilling of 140/150 mm pilot boreFrom 270 m upto 300 m Depth ending from ground levelMetre2,457.47
ixFrom 270 m upto 300 mt depth ending below ground levelMetre645.97
ixHire charges for Diesel Pump set for 50 HPHour1,741.58
ixTerracing work in roof or floorSqm69.70
vDrilling of 140/150 mm pilot boreFrom 150 m upto 180 m Depth ending from ground levelMetre2,187.25
vFrom 150 m upto 180 mt depth ending below ground levelMetre538.11
vHire charges for Diesel Pump set for 12.5 HPHour645.37
vBrick / stone masonry in lime mortar walls under 3 m highCu.m210.00
vFixing iron bars in windows and ventilatorsKG29.65
viDrilling of 140/150 mm pilot boreFrom 180 m upto 210 m Depth ending from ground levelMetre2,257.99
viFrom 180 m upto 210 mt depth ending below ground levelMetre565.95
viHire charges for Diesel Pump set for 15 HPHour723.58
viBrick / stone masonry in lime mortar walls, add for every additional 3 m or part thereof over the initial height of 3 mCu.m23.20
viiDrilling of 140/150 mm pilot boreFrom 210 m upto 240 m Depth ending from ground levelMetre2,322.94
viiFrom 210 m upto 240 mt depth ending below ground levelMetre591.46
viiHire charges for Diesel Pump set for 20 HPHour880.01
viiBrick / stone masonry in Cement mortar walls under 3 m highCu.m257.40
viiDriving casurina piles into bed including scaffolding etc., completeRm11.17
viiiDrilling of 140/150 mm pilot boreFrom 240 m upto 270 m Depth ending from ground levelMetre2,404.12
viiiFrom 240 m upto 270 mt depth ending below ground levelMetre612.34
viiiHire charges for Diesel Pump set for 40 HPHour1,467.22
viiiBrick / stone masonry in Cement mortar walls,add for every additional 3 m or part thereof over the initial height of 3 metreCu.m27.20
viiiCasurina walling pieces 40mm to 50mm diameter including fixing with nails and tying with ropesRm15.60
xDrilling of 140/150 mm pilot boreFrom 300 m upto 330 m Depth ending from ground levelMetre2,516.61
xFrom 300 m upto 330 mt depth ending below ground levelMetre671.48
xHire charges for Diesel Pump set for 60 HPHour2,054.44
xFlag stone in roof or floor including liftingSqm36.75
xiDrilling of 140/150 mm pilot boreFrom 330 m upto 360 m Depth ending from ground levelMetre2,569.96
xiFrom 330 m upto 360 mt depth ending below ground levelMetre695.84
xiHire charges for Diesel Pump set for 70 HPHour2,378.29
xiCut stone slab over culverts upto 3.3.m height below ground levelCu.m1,072.00
xiiCut stone slab over culverts over 3.3.m height below ground levelCu.m1,118.00
xiiiRemoval of cut stone slabs / RCC Cover slabsSqm466.30
xivRefixing cut stone slabs/ RCC Cover slabSqm511.60
xixOld Thatched roof, including tying materials into small bundles for reuseSqm7.80
xvPantile or Mangalore tiled roof without roof timbersSqm18.05
xviFlat and Pan tiles or Mangalore tiles over flat tiles, without roof timbersSqm25.30
xviiAsbestos cement sheets roofing without roof timbersSqm16.05
xviiiCorrugated iron sheet roofing over pan tiles, without roof timbersSqm27.20
xxWrought and put up framed timbers in roofs / floorsCu.m674.00
xxiDoors and windows including removal of frames, hinges and fasteningsSqm139.60
xxiiDrystone apron or revetment, stacking within 40m leadCu.m119.60
xxiiiGrouted stones apron or revetment, stacking within 40 m leadCu.m139.60
xxivDry stone masonry wallsCu.m101.80
xxixChipping of concrete and roughening the surfaceSqm36.70
xxvDismantling lime concreteCu.m321.70
xxviDismantling plain cement concreteCu.m442.00
xxviiiDismantling RCC by manual/ by using deploying machineriesCu.m3,917.00
xxxPressed tiles & weathering courseSqm41.80
xxxiOne course of pressed tile roof finish in Cement MortarSqm23.20
xxxiiOne course of terrace bricks roof finish in Cement MortarSqm27.10
xxxiiiTwo course of flat tiles roof finish in Cement MortarSqm27.10
xxxivMosaic-in-situ finish in cement mortar in flooring and in wall surfaceSqm57.50
xxxvFloor finish and dadooing walls in Cement Mortar with mosaic tiles/ glazed tiles/ cuddapah slabsSqm55.70

Pricing rates for miscellaneous items against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works