Tamil Nadu SOR 2023-24

Rates for Building Materials rates

74 rates for building materials items from the Tamil Nadu Water Supply and Drainage (TWAD) Board, effective 2024-01-23.

Rates for Building Materials rates in the Tamil Nadu Water Works Schedule of Rates 2023-24 run from ₹6.05 to ₹1,85,200.00. Transcribed from Tamil Nadu TWAD Board — Standard Schedule of Rates 2023-24, effective 23 January 2024. Reference only — verify against the official source before pricing a bid.

74 items — scroll the table to browse

DescriptionUnit
17Rough stone for Masonry works (Hard Granite)Cu.m449.40
18Stone and Road materialsRough stone for revetment worksCu.m388.70
19Jeddy size for revetment (Hard granite)Cu.m428.00
20Cut stone pillar of size 0.15 x 0.15 x 2.1mEach165.60
21From boulders without blasting for revetmentCu.m114.10
22From boulders without blasting for masonryCu.m147.45
23Course Rubble stone for masonry worksCu.m358.50
24Stone and Road materialsCourse Rubble stone for Arch worksCu.m388.80
25Ashlar Arch Stone Fully Dressed to size all facesCu.m4,893.00
26Flooring Stone SS size (Not less than 10cm thick)Sq.m356.50
30Cut stone fully dressed to size on all facesCu.m6,443.00
31Cut stone roughly dressedCu.m4,433.00
33Stone slab for culvert (3 faces, two line dressed)Cu.m5,191.00
35Kilometre stone 1.65 x 0.45 x 0.15mEach443.30
42Laterite 40mm to 75mm sizeCu.m97.75
43Kankar 40mm to 75mm sizeCu.m97.75
44.aSoling stones 15cm cube (un blasted)Cu.m114.10
46.aQuarry rubbishCu.m96.65
49Clay for puddle and masonryCu.m37.35
51Shell Lime (Slacked and screened)Cu.m1,348.00
52Freshly Slacked and Screened Burnt Lime StoneCu.m993.00
53Stone Lime or Lime MetalCu.m85.60
54Unslaked freshly Burnt Lime for Heritage construction WorksCu.m10,345.00
55Teakwood scantlings (over 3m for joists and rafters) MalabarCu.m1,16,600.00
56Teakwood scantlings (for tiebeams and principal rafters) - MalabarCu.m1,14,700.00
57Teakwood scantlings (over 2m and below 3m in length) - MalabarCu.m1,11,600.00
58Teakwood scantlings(below 2m in length ) – MalabarCu.m99,400.00
59Bentonite Powder - Construction gradeKG6.05
61Seasoned Teakwood for Scantling and Planks for Heritage WorksCu.m1,85,200.00
64Country wood scantlings (for tiebeams and principal rafters for trusses)Cu.m36,200.00
65Jack wood Scantlings (up to 4m)Cu.m37,900.00
66Silver Oak ScantlingCu.m15,500.00
68.aJack wood planks 25 to 40mm thickCu.m41,300.00
71.aPalmyrah rafter (50mm to 60mm wide and 125mm depth)Rm49.50
74Eucalyptus Bullies 4cm to 5 cm dia & cross tiesRm12.00
75Casurina Bullies 4cm to 5cm dia & cross tiesRm13.50
77METAL AND IRON ITEMSMild steel plates or sheets BG 10KG53.00
78Mild Steel Angles 25mm x 25mm x 3mmKG53.00
79.aMETAL AND IRON ITEMSBinding wire (Black 18G)KG56.35
80G.I. sheets 30cm wide and 1.6mm thickSq.m391.10
82METAL AND IRON ITEMSChicken MeshSq.m40.65
83METAL AND IRON ITEMSFly Proof MeshSq.m116.55
84Supplying mild steel grills for windows, ventilators, etc., including priming coatKG70.15
bT.R.S. Bench Mark Stone neatly dressed the exposed surface to a height of 15cm including cutting lettersGuard stone (Top 0.70m chisel dressed and 0.50m bottom roughly dressed) 0.23m x 0.23m x 1.20m long (Two line dressed top 45cm) 23cm dia 1.0m longEach174.70
bSoling stones 15cm cube (blasted)Cu.m185.80
bSilver Oak plank (40mm thick)Cu.m17,600.00
bMETAL AND IRON ITEMSBinding wire (Galvanised – 18G)KG56.35
cGuard stone (Top 0.70m chisel dressed and 0.50m bottom roughly dressed) 0.23m x 0.23m x 0.9m long (Two line dressed top 45cm) 23cm dia 0.90m longEach163.60
cScreened Kankar GravelCu.m121.90
cPond Ash (wet /dry)Cu.m95.65
cBlue gum plankCu.m18,100.00
dGuard stone (Top 0.70m chisel dressed and 0.50m bottom roughly dressed) 0.15m x 0.15m x 0.90m long (Two line dressed top 45cm) 23cm dia 0.90m longEach114.10
dCrushed Stone Sand (M-Sand)Cu.m1,338.00
eBest Mangalore Glass Roofing TilesEach304.00
eDemarcation Stone with letters cut 0.75 x 0.15 x 0.15mEach123.20
eGuard stone 90cm long 23cm diaEach84.20
ePlastering sand (P- Sand)Cu.m1,343.00
fBest Mangalore Ventilating Tiles (Single)Each45.45
fEdge stone 0.45 x 0.15 x 0.15mEach56.00
gBest Mangalore Ventilating Tiles (Double)Each57.55
iOver 45cm wide and 12mm thickCu.m1,23,100.00
iUp to 4m in lengthCu.m34,300.00
iiCuddapah slab 38mm/40mm thickSq.m408.00
iiOver 30cm and up to 45cm wide and 12mm thickCu.m1,14,300.00
iiOver 4m in lengthCu.m36,200.00
iiiCuddapah slab 20mm/30mm thickSq.m376.70
iiiOver 30cm and up to 45cm wide and 12mm to 25mm thickCu.m1,07,000.00
ivOver 30cm and up to 45cm wide and 25mm to 40mm thickCu.m1,02,600.00
ixUp to 15cm wide and 12mm to 25mm thickCu.m91,300.00
vOver 15cm and up to 30cm wide and 12mm thickCu.m99,900.00
viOver 15cm and up to 30cm wide and 12mm to 25mm thickCu.m95,000.00
viiOver 15cm and upto 30cm wide and 25mm to 40mm thickCu.m93,100.00
viiiUp to 15cm wide and 12mm thickCu.m91,300.00
xUp to 15cm wide and 25mm to 40mm thickCu.m86,200.00

Pricing rates for building materials against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.