Tamil Nadu SOR 2023-24
Rates for Building Materials rates
74 rates for building materials items from the Tamil Nadu Water Supply and Drainage (TWAD) Board, effective 2024-01-23.
Rates for Building Materials rates in the Tamil Nadu Water Works Schedule of Rates 2023-24 run from ₹6.05 to ₹1,85,200.00. Transcribed from Tamil Nadu TWAD Board — Standard Schedule of Rates 2023-24, effective 23 January 2024. Reference only — verify against the official source before pricing a bid.
74 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 17 | Rough stone for Masonry works (Hard Granite) | Cu.m | 449.40 |
| 18 | Stone and Road materialsRough stone for revetment works | Cu.m | 388.70 |
| 19 | Jeddy size for revetment (Hard granite) | Cu.m | 428.00 |
| 20 | Cut stone pillar of size 0.15 x 0.15 x 2.1m | Each | 165.60 |
| 21 | From boulders without blasting for revetment | Cu.m | 114.10 |
| 22 | From boulders without blasting for masonry | Cu.m | 147.45 |
| 23 | Course Rubble stone for masonry works | Cu.m | 358.50 |
| 24 | Stone and Road materialsCourse Rubble stone for Arch works | Cu.m | 388.80 |
| 25 | Ashlar Arch Stone Fully Dressed to size all faces | Cu.m | 4,893.00 |
| 26 | Flooring Stone SS size (Not less than 10cm thick) | Sq.m | 356.50 |
| 30 | Cut stone fully dressed to size on all faces | Cu.m | 6,443.00 |
| 31 | Cut stone roughly dressed | Cu.m | 4,433.00 |
| 33 | Stone slab for culvert (3 faces, two line dressed) | Cu.m | 5,191.00 |
| 35 | Kilometre stone 1.65 x 0.45 x 0.15m | Each | 443.30 |
| 42 | Laterite 40mm to 75mm size | Cu.m | 97.75 |
| 43 | Kankar 40mm to 75mm size | Cu.m | 97.75 |
| 44.a | Soling stones 15cm cube (un blasted) | Cu.m | 114.10 |
| 46.a | Quarry rubbish | Cu.m | 96.65 |
| 49 | Clay for puddle and masonry | Cu.m | 37.35 |
| 51 | Shell Lime (Slacked and screened) | Cu.m | 1,348.00 |
| 52 | Freshly Slacked and Screened Burnt Lime Stone | Cu.m | 993.00 |
| 53 | Stone Lime or Lime Metal | Cu.m | 85.60 |
| 54 | Unslaked freshly Burnt Lime for Heritage construction Works | Cu.m | 10,345.00 |
| 55 | Teakwood scantlings (over 3m for joists and rafters) Malabar | Cu.m | 1,16,600.00 |
| 56 | Teakwood scantlings (for tiebeams and principal rafters) - Malabar | Cu.m | 1,14,700.00 |
| 57 | Teakwood scantlings (over 2m and below 3m in length) - Malabar | Cu.m | 1,11,600.00 |
| 58 | Teakwood scantlings(below 2m in length ) – Malabar | Cu.m | 99,400.00 |
| 59 | Bentonite Powder - Construction grade | KG | 6.05 |
| 61 | Seasoned Teakwood for Scantling and Planks for Heritage Works | Cu.m | 1,85,200.00 |
| 64 | Country wood scantlings (for tiebeams and principal rafters for trusses) | Cu.m | 36,200.00 |
| 65 | Jack wood Scantlings (up to 4m) | Cu.m | 37,900.00 |
| 66 | Silver Oak Scantling | Cu.m | 15,500.00 |
| 68.a | Jack wood planks 25 to 40mm thick | Cu.m | 41,300.00 |
| 71.a | Palmyrah rafter (50mm to 60mm wide and 125mm depth) | Rm | 49.50 |
| 74 | Eucalyptus Bullies 4cm to 5 cm dia & cross ties | Rm | 12.00 |
| 75 | Casurina Bullies 4cm to 5cm dia & cross ties | Rm | 13.50 |
| 77 | METAL AND IRON ITEMSMild steel plates or sheets BG 10 | KG | 53.00 |
| 78 | Mild Steel Angles 25mm x 25mm x 3mm | KG | 53.00 |
| 79.a | METAL AND IRON ITEMSBinding wire (Black 18G) | KG | 56.35 |
| 80 | G.I. sheets 30cm wide and 1.6mm thick | Sq.m | 391.10 |
| 82 | METAL AND IRON ITEMSChicken Mesh | Sq.m | 40.65 |
| 83 | METAL AND IRON ITEMSFly Proof Mesh | Sq.m | 116.55 |
| 84 | Supplying mild steel grills for windows, ventilators, etc., including priming coat | KG | 70.15 |
| b | T.R.S. Bench Mark Stone neatly dressed the exposed surface to a height of 15cm including cutting lettersGuard stone (Top 0.70m chisel dressed and 0.50m bottom roughly dressed) 0.23m x 0.23m x 1.20m long (Two line dressed top 45cm) 23cm dia 1.0m long | Each | 174.70 |
| b | Soling stones 15cm cube (blasted) | Cu.m | 185.80 |
| b | Silver Oak plank (40mm thick) | Cu.m | 17,600.00 |
| b | METAL AND IRON ITEMSBinding wire (Galvanised – 18G) | KG | 56.35 |
| c | Guard stone (Top 0.70m chisel dressed and 0.50m bottom roughly dressed) 0.23m x 0.23m x 0.9m long (Two line dressed top 45cm) 23cm dia 0.90m long | Each | 163.60 |
| c | Screened Kankar Gravel | Cu.m | 121.90 |
| c | Pond Ash (wet /dry) | Cu.m | 95.65 |
| c | Blue gum plank | Cu.m | 18,100.00 |
| d | Guard stone (Top 0.70m chisel dressed and 0.50m bottom roughly dressed) 0.15m x 0.15m x 0.90m long (Two line dressed top 45cm) 23cm dia 0.90m long | Each | 114.10 |
| d | Crushed Stone Sand (M-Sand) | Cu.m | 1,338.00 |
| e | Best Mangalore Glass Roofing Tiles | Each | 304.00 |
| e | Demarcation Stone with letters cut 0.75 x 0.15 x 0.15m | Each | 123.20 |
| e | Guard stone 90cm long 23cm dia | Each | 84.20 |
| e | Plastering sand (P- Sand) | Cu.m | 1,343.00 |
| f | Best Mangalore Ventilating Tiles (Single) | Each | 45.45 |
| f | Edge stone 0.45 x 0.15 x 0.15m | Each | 56.00 |
| g | Best Mangalore Ventilating Tiles (Double) | Each | 57.55 |
| i | Over 45cm wide and 12mm thick | Cu.m | 1,23,100.00 |
| i | Up to 4m in length | Cu.m | 34,300.00 |
| ii | Cuddapah slab 38mm/40mm thick | Sq.m | 408.00 |
| ii | Over 30cm and up to 45cm wide and 12mm thick | Cu.m | 1,14,300.00 |
| ii | Over 4m in length | Cu.m | 36,200.00 |
| iii | Cuddapah slab 20mm/30mm thick | Sq.m | 376.70 |
| iii | Over 30cm and up to 45cm wide and 12mm to 25mm thick | Cu.m | 1,07,000.00 |
| iv | Over 30cm and up to 45cm wide and 25mm to 40mm thick | Cu.m | 1,02,600.00 |
| ix | Up to 15cm wide and 12mm to 25mm thick | Cu.m | 91,300.00 |
| v | Over 15cm and up to 30cm wide and 12mm thick | Cu.m | 99,900.00 |
| vi | Over 15cm and up to 30cm wide and 12mm to 25mm thick | Cu.m | 95,000.00 |
| vii | Over 15cm and upto 30cm wide and 25mm to 40mm thick | Cu.m | 93,100.00 |
| viii | Up to 15cm wide and 12mm thick | Cu.m | 91,300.00 |
| x | Up to 15cm wide and 25mm to 40mm thick | Cu.m | 86,200.00 |
Other chapters in this schedule
- Rates for Earthwork Excavation Other Than Pipe Laying Works and Open Wells (29)
- Rates for Earthwork Excavation Pipe Laying Works for Water Supply and Sewerage Works (8)
- Rates for Electrical Items (223)
- Rates for Electromechanical Items (12)
- Rates for Labour (80)
- Rates for Materials (28)
- Rates for Miscellaneous Items (182)
- Rates for Other Construction Materials (194)
- Rates for Pumpsets (76)
- Rates for Works (8)
Pricing rates for building materials against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.