Chhattisgarh SOR 2026

Stone Work rates

12 stone work items from the Chhattisgarh Public Works Department (PWD), effective 2026-06-10.

Stone Work rates in the Chhattisgarh Building Schedule of Rates 2026 run from ₹82.00 to ₹2,209.00. Transcribed from Chhattisgarh PWD — Modified Building SOR, 10 June 2026. Reference only — verify against the official source before pricing a bid.

12 items — scroll the table to browse

DescriptionUnit
6.1Random rubble masonry with hard stone in foundation and plinth in Cement Mortar 1:6 (1 Cement: 6 Coarse Sand) including leveling up with cement concrete 1:6:12 (1 cement: 6 coarse sand: 12 stone aggregate 20mm nominal size) upto plinth levelCum2,138.00
6.2Extra for random rubble masonry with hard stone in superstructure above plinth level for every floor or part thereof in addition to rate for foundation and plinthCum173.00
6.3Extra for random rubble masonry with hard stone in square or rectangular pillarsCum162.00
6.4Extra for random rubble masonry with hard stone in circular pillarsCum553.00
6.5Extra for random rubble masonry with hard stone curved on plan for a mean radius not exceeding 6.00mCum244.00
6.6Coursed rubble masonry (Second sort) with hard stone in Cement mortar 1:6 (1 cement: 6 coarse sand) upto plinth levelCum2,209.00
6.7Extra for Coursed rubble masonry with hard stone (Second Sort) in superstructure above plinth level for every floor or part thereof in addition to rate for foundation and plinthCum224.00
6.8Extra for coursed rubble masonry with hard stone (Second Sort) in square or rectangular pillarsCum180.00
6.9Extra for coursed rubble masonry with hard stone (Second sort) in circular pillarsCum624.00
6.10Extra for coursed rubble masonry with hard stone (Second Sort) curved on plan for a mean radius not exceeding 6.0mCum244.00
6.11Extra for laying stone work, in or under water and or liquid, mud including cost of pumping/ bailing out water and removing slush etc. completeCum310.00
6.12Extra for laying stone work, in or under foul conditionsCum82.00

Pricing stone work against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.