Skip to main content

Chhattisgarh SOR 2026

Form Work rates

20 form work items from the Chhattisgarh Public Works Department (PWD), effective 2026-06-10.

Form Work rates in the Chhattisgarh Building Schedule of Rates 2026 run from ₹14.00 to ₹6,172.00. Transcribed from Chhattisgarh PWD — Modified Building SOR, 10 June 2026. Reference only — verify against the official source before pricing a bid.

20 items — scroll the table to browse

DescriptionUnit
2.1.1Providing and fixing form work including centering, shuttering, strutting, staging, propping bracing etc. complete and including its removal at all levels, for:Foundations, footings, bases of columns plinth beam, curtain wall in any shape and size and all type of wall below plinth levelSqm118.00
2.1.2Providing and fixing form work including centering, shuttering, strutting, staging, propping bracing etc. complete and including its removal at all levels, for:Wall of any thickness including attached pilasters, buttresses etc. in super structureSqm194.00
2.1.3Providing and fixing form work including centering, shuttering, strutting, staging, propping bracing etc. complete and including its removal at all levels, for:Window sills, anchor blocks, string course, bends, copings, bed plates and likeSqm156.00
2.1.4Providing and fixing form work including centering, shuttering, strutting, staging, propping bracing etc. complete and including its removal at all levels, for:Edge of slab, breaks in floor and walls upto 200mmMetre29.00
2.1.5Providing and fixing form work including centering, shuttering, strutting, staging, propping bracing etc. complete and including its removal at all levels, for:Columns, Pillars, Piers and likes- rectangular or square in shapeSqm252.00
2.1.6Providing and fixing form work including centering, shuttering, strutting, staging, propping bracing etc. complete and including its removal at all levels, for:Columns, beams & walls- circular or any other geometrical shape other than square and rectangular in all sizesSqm303.00
2.1.7Providing and fixing form work including centering, shuttering, strutting, staging, propping bracing etc. complete and including its removal at all levels, for:Suspended floors, roofs, access platform, balconies (plain surfaces) and shelves (cast in situ)Sqm200.00
2.1.8Providing and fixing form work including centering, shuttering, strutting, staging, propping bracing etc. complete and including its removal at all levels, for:Beams, lintels, cantilevers & wallsSqm172.00
2.1.9Providing and fixing form work including centering, shuttering, strutting, staging, propping bracing etc. complete and including its removal at all levels, for:Vertical and horizontal fins individually or forming box, louvers bands, almirah shelves and likesSqm286.00
2.1.10Providing and fixing form work including centering, shuttering, strutting, staging, propping bracing etc. complete and including its removal at all levels, for:Folded plates slabsSqm165.00
2.1.11Providing and fixing form work including centering, shuttering, strutting, staging, propping bracing etc. complete and including its removal at all levels, for:Arches, domes and likes, upto 6 M. SpanSqm496.00
2.1.12Providing and fixing form work including centering, shuttering, strutting, staging, propping bracing etc. complete and including its removal at all levels, for:Arches, domes and likes, exceeding 6 M. spanSqm757.00
2.1.13Providing and fixing form work including centering, shuttering, strutting, staging, propping bracing etc. complete and including its removal at all levels, for:Weather shade, chhajja, Cornices and mouldingsSqm250.00
2.1.14Providing and fixing form work including centering, shuttering, strutting, staging, propping bracing etc. complete and including its removal at all levels, for:Spiral / folded plate type stair cases including risers and landingsSqm261.00
2.1.15Providing and fixing form work including centering, shuttering, strutting, staging, propping bracing etc. complete and including its removal at all levels, for:Stair cases of all types excluding spiral and folded plate type, including risers and landingsSqm196.00
2.1.16Providing and fixing form work including centering, shuttering, strutting, staging, propping bracing etc. complete and including its removal at all levels, for:Coffer/ waffle/ Grid slab of any size or shape. Note: (1) Any grid box of area less than 1 sqm will only be paid in this item. (2) Only plan area is to be measured and paid and grid beams or fins will not be paid separatelySqm434.00
2.2Extra for additional height every 1m or part thereof where height of staging for form work exceeds 4.0 metre with adequate bracing, propping etc at all levels, for suspended floor, roof, landing, beam and balcony. (only plan area is to be measured)Sqm34.00
2.3Extra for providing fixing and removing of propping from lower floor upwards for the concreting. Propping should be provided two floors below. The props of lower floor must be 50% of the props of the floor above including wedging etc. complete. In case propping is done in one floor below, only half the rate shall be paidSqm14.00
2.3± 0.2 mm and single glazing bead / double glazing bead of appropriate dimension. (Area of window above 1.75 sqm)Sqm6,172.00
2.4Extra for unsupported individual columns with height more than 4.0 m from the immediate lower level in every floor. (full area of column is to be paid)Sqm25.00

Pricing form work against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works