Chhattisgarh SOR 2026
Dismantling and Demolishing rates
53 dismantling and demolishing items from the Chhattisgarh Public Works Department (PWD), effective 2026-06-10.
Dismantling and Demolishing rates in the Chhattisgarh Building Schedule of Rates 2026 run from ₹0.60 to ₹653.00. Transcribed from Chhattisgarh PWD — Modified Building SOR, 10 June 2026. Reference only — verify against the official source before pricing a bid.
/
53 items — scroll the table to browse
| Description | Unit | ||
|---|---|---|---|
| 16.1 | Dismantling rammed moorum and boulders or rammed moorum and silt in foundation or under floor including all lead and lifts | Cum | 237.00 |
| 16.2 | Dismantling bricks laid flat or on edge (each layer), or cement concrete tiles in flooring or over roofs in cement/lime mortar including stacking of serviceable material and disposal of unserviceable material within 50 metre lead | Sqm | 19.00 |
| 16.3.3 | Demolishing brick masonry including arches, stacking of serviceable material disposal of unserviceable material within 50 metres lead.In cement mortar | Cum | 224.00 |
| 16.4.3 | Removing mortar from bricks and cleaning the bricks including stacking within 50 metre lead. (stacks of cleaned brick shall be measured).In cement mortar | Each | 1.10 |
| 16.5.2 | Demolishing stone rubble masonry including arches, stacking of serviceable material and disposal of unserviceable material within 50 Metres lead.In cement mortar | Cum | 448.00 |
| 16.6.2 | Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work including arches, stacking of serviceable material and disposal of unserviceable material within 50 metres lead.In cement mortar | Cum | 513.00 |
| 16.7.2 | Removing mortars from stones and concrete articles and cleaning the same. (Stacks of cleaned material shall be measured).In cement mortar | Cum | 131.00 |
| 16.8 | Dismantling flag stone flooring laid in cement/lime mortar including stacking of serviceable material and disposal of unserviceable material within 50 metre lead | Sqm | 48.00 |
| 16.9 | Dismantling of old tarfelts of water proofing treatment of any course from the top of roof of any floor including disposal and removal of material with 50 metre lead | Sqm | 9.00 |
| 16.10 | Dismantling cement asbestos or other hard board ceiling or partition wall including stacking of serviceable material and disposal of unserviceable material within 50m lead | Sqm | 11.00 |
| 16.11 | Dismantling single Allahabad tiles or Manglore tiles or single wheel tiles including roof timber (excluding trusses), including stacking of serviceable material and disposal of unserviceable material within 50m lead | Sqm | 37.00 |
| 16.12 | Dismantling single Allahabad tiles or Manglore tiles or single wheel tiles excluding roof timber, including stacking of serviceable material and disposal of unserviceable material within 50m lead | Sqm | 23.00 |
| 16.13 | Dismantling double Allahabad tiles or Manglore tiles or single wheel tiles including roof timber (excluding trusses), including stacking of serviceable material and disposal of unserviceable material within 50m lead | Sqm | 56.00 |
| 16.14 | Dismantling double Allahabad tiles or Manglore tiles or single wheel tiles excluding roof timber, including stacking of serviceable material and disposal of unserviceable material within 50m lead | Sqm | 33.00 |
| 16.15 | Dismantling thatch roofing including mats, bamboo, jaffri etc. complete including stacking of serviceable materials & disposal of unserviceable materials within 50 m lead | Sqm | 9.00 |
| 16.16 | Dismantling jack arch roofing and floor including stacking of serviceable material and disposal of unserviceable material within 50 metre lead | Sqm | 47.00 |
| 16.17 | Dismantling G.I. sheet roofing including ridges hips, valleys and gutters etc. and stacking the material with 50 m lead | Sqm | 28.00 |
| 16.18 | Dismantling asbestos sheet roofing including ridges, hips valley and gutters and stacking the materials with 50 m lead | Sqm | 14.00 |
| 16.19 | Dismantling stone slab roofing over wooden karries or R.C.C. battens (dismantling of karries and battens to be paid separately) including stacking of serviceable materials and disposal of unserviceable material within 50 metres lead | Cum | 476.00 |
| 16.22.1 | Extra for dismantling wood work in frame, trusses purlins and rafters etc. for every additional height of one metre or part thereof beyond 5 metres.Sectional area 40 Sq. Cm and above | Cum | 156.00 |
| 16.22.2 | Extra for dismantling wood work in frame, trusses purlins and rafters etc. for every additional height of one metre or part thereof beyond 5 metres.Sectional area below 40 Sq.cm | Metre | 0.60 |
| 16.24 | Dismantling wooden trellis work (excluding frame) including stacking the serviceable material within 50 metres lead | Sqm | 11.00 |
| 16.25.1 | Removing wooden boarding in lining of wall and partition (excluding supporting members) including stacking within 50 metres lead.Thickness up to 10mm thick | Sqm | 12.00 |
| 16.25.2 | Removing wooden boarding in lining of wall and partition (excluding supporting members) including stacking within 50 metres lead.Thickness above 10mm. & upto 25mm | Sqm | 14.00 |
| 16.25.3 | Removing wooden boarding in lining of wall and partition (excluding supporting members) including stacking within 50 metres lead.Thickness above 25mm. & upto 40mm | Sqm | 21.00 |
| 16.26 | Dismantling doors chowkhats with shutters (steel or wood) including architrave, hold fast etc. complete and stacking within 50 metres lead | Each | 85.00 |
| 16.27 | Dismantling windows chowkhats with shutters (steel or wood) including architrave, hold fast etc. complete and stacking within 50 metres lead | Each | 57.00 |
| 16.28 | Taking out door shutters (steel or wood) including stacking within 50 metres lead | Each | 40.00 |
| 16.29 | Taking out window shutters (steel or wood) including stacking within 50 metres lead | Each | 28.00 |
| 16.30 | Dismantling steel work in single section in RS Joists, channels, angles, flats, I-section and T-section including dismembering and stacking within 50 metres lead | KG | 0.60 |
| 16.31 | Dismantling steel work in built-up section in angles, channels, flats I- section and T-section including all gusset plates, bolts, nuts, cutting rivets, welding etc., including dismembering and stacking within 50 metres lead | KG | 0.90 |
| 16.32 | Dismantling steel work in built-up section without dismembering for a span upto 10 metre and height upto 5.0 metre above plinth level including stacking with in 50 metre lead | KG | 0.80 |
| 16.35 | Extra for making structural steel work required to be re-erected | KG | 0.80 |
| 16.36 | Dismantling terrazzo or mosaic or glazed vitreous or patent cement or tiled flooring or dado skirting of any thickness without sub base | Sqm | 19.00 |
| 16.37 | Dismantling lime/ cement plaster or skirting at any height raking out joints and cleaning the surface for plaster including disposal of rubbish within 50 metres lead | Sqm | 9.00 |
| 16.38 | Taking out stone/ concrete/wooden lintels from building masonry of doors windows or any other opening for thickness upto 15 cm | Metre | 62.00 |
| 16.39 | Taking out of cut stone beams, slabs lintels, bracket etc. for thickness exceeding 15cm and upto 30 cm | Metre | 140.00 |
| 16.40 | Dismantling expanded metal or welded fabrics with battens and beading including stacking the serviceable material within 50 metres lead | Sqm | 13.00 |
| 16.41.1 | Dismantling precast concrete or stone slabs in walls partitions etc. including stacking within 50 M lead.Thickness up to 38mm | Sqm | 51.00 |
| 16.41.2 | Dismantling precast concrete or stone slabs in walls partitions etc. including stacking within 50 M lead.Thickness above 38mm upto 75mm | Sqm | 72.00 |
| 16.42 | Demolishing R.C.C. work including stacking of steel bars and disposal of unserviceable material within 50 metre lead | Cum | 653.00 |
| 16.44 | Extra for cutting reinforcement bars in R.C.C. or R.B work. (Cross- sectional area of RCC/RB work to be measured) | Sqm | 380.00 |
| 16.45 | Extra for scrapping cleaning and straitening reinforcement obtained on demolishing of R.C.C. or R.B. work | KG | 2.00 |
| 16.46 | Demolishing lime brick coba concrete and disposal or within 50 metres lead | Cum | 168.00 |
| 16.47 | Removing and stacking within 50 metres lead Fencing posts or structure including all earth work and dismantling concrete etc. in the base | Each | 56.00 |
| 16.48 | Dismantling and stacking within 50 M lead R.C.C. fencing posts or structure including all earth work and dismantling of concrete etc. in the base | Each | 65.00 |
| 16.49 | Cutting ballies or wooden posts of fencing at the points of projection above the concrete or ground and stacking the same within 50 metre lead | Each | 8.00 |
| 16.50 | Taking out R.C.C. jali at any place and positions and of any shape and thickness including finishing the opening | Sqm | 43.00 |
| 16.52 | Removing barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metre lead | KG | 7.00 |
| 16.53.1 | Removing following vitreous china sanitorywares carefully for re-use including stacking within 50 metres lead.Wash basin of all sizes and shapes | Each | 26.00 |
| 16.53.2 | Removing following vitreous china sanitorywares carefully for re-use including stacking within 50 metres lead.Urinals of all sizes and shapes | Each | 32.00 |
| 16.53.3 | Removing following vitreous china sanitorywares carefully for re-use including stacking within 50 metres lead.European/ Anglo Indian WC pan of all sizes | Each | 39.00 |
| 16.53.4 | Removing following vitreous china sanitorywares carefully for re-use including stacking within 50 metres lead.Cysten of all sizes and shapes | Each | 29.00 |
Other chapters in this schedule
- Earth Work (46)
- Form Work (20)
- Cement Concrete (Plain and Reinforced) (24)
- Water Proofing (25)
- Stone Work (12)
- Brick Work (44)
- Wood and PVC Work (128)
- Steel and Aluminium Work (73)
- Roofing and Ceiling (77)
- Plastering and Pointing (52)
- Flooring (87)
- Marble & Stone Wall Lining Work (24)
- Distempering, Painting and Finishing (57)
- Repair to Buildings (49)
- Sanitary Installations (64)
- Water Supply (64)
- Drainage (48)
- Tube Well & Rain Water Harvesting (8)
- Horticulture & Landscaping (32)
- Fire Fighting (30)
- Miscellaneous (8)
Pricing dismantling and demolishing against a live tender
Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.