Dismantling and Demolishing rates

53 dismantling and demolishing items from the Chhattisgarh Public Works Department (PWD), effective 2026-06-10.

Dismantling and Demolishing rates in the Chhattisgarh Building Schedule of Rates 2026 run from ₹0.60 to ₹653.00. Transcribed from Chhattisgarh PWD — Modified Building SOR, 10 June 2026. Reference only — verify against the official source before pricing a bid.

53 items — scroll the table to browse

DescriptionUnit
16.1Dismantling rammed moorum and boulders or rammed moorum and silt in foundation or under floor including all lead and liftsCum237.00
16.2Dismantling bricks laid flat or on edge (each layer), or cement concrete tiles in flooring or over roofs in cement/lime mortar including stacking of serviceable material and disposal of unserviceable material within 50 metre leadSqm19.00
16.3.3Demolishing brick masonry including arches, stacking of serviceable material disposal of unserviceable material within 50 metres lead.In cement mortarCum224.00
16.4.3Removing mortar from bricks and cleaning the bricks including stacking within 50 metre lead. (stacks of cleaned brick shall be measured).In cement mortarEach1.10
16.5.2Demolishing stone rubble masonry including arches, stacking of serviceable material and disposal of unserviceable material within 50 Metres lead.In cement mortarCum448.00
16.6.2Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work including arches, stacking of serviceable material and disposal of unserviceable material within 50 metres lead.In cement mortarCum513.00
16.7.2Removing mortars from stones and concrete articles and cleaning the same. (Stacks of cleaned material shall be measured).In cement mortarCum131.00
16.8Dismantling flag stone flooring laid in cement/lime mortar including stacking of serviceable material and disposal of unserviceable material within 50 metre leadSqm48.00
16.9Dismantling of old tarfelts of water proofing treatment of any course from the top of roof of any floor including disposal and removal of material with 50 metre leadSqm9.00
16.10Dismantling cement asbestos or other hard board ceiling or partition wall including stacking of serviceable material and disposal of unserviceable material within 50m leadSqm11.00
16.11Dismantling single Allahabad tiles or Manglore tiles or single wheel tiles including roof timber (excluding trusses), including stacking of serviceable material and disposal of unserviceable material within 50m leadSqm37.00
16.12Dismantling single Allahabad tiles or Manglore tiles or single wheel tiles excluding roof timber, including stacking of serviceable material and disposal of unserviceable material within 50m leadSqm23.00
16.13Dismantling double Allahabad tiles or Manglore tiles or single wheel tiles including roof timber (excluding trusses), including stacking of serviceable material and disposal of unserviceable material within 50m leadSqm56.00
16.14Dismantling double Allahabad tiles or Manglore tiles or single wheel tiles excluding roof timber, including stacking of serviceable material and disposal of unserviceable material within 50m leadSqm33.00
16.15Dismantling thatch roofing including mats, bamboo, jaffri etc. complete including stacking of serviceable materials & disposal of unserviceable materials within 50 m leadSqm9.00
16.16Dismantling jack arch roofing and floor including stacking of serviceable material and disposal of unserviceable material within 50 metre leadSqm47.00
16.17Dismantling G.I. sheet roofing including ridges hips, valleys and gutters etc. and stacking the material with 50 m leadSqm28.00
16.18Dismantling asbestos sheet roofing including ridges, hips valley and gutters and stacking the materials with 50 m leadSqm14.00
16.19Dismantling stone slab roofing over wooden karries or R.C.C. battens (dismantling of karries and battens to be paid separately) including stacking of serviceable materials and disposal of unserviceable material within 50 metres leadCum476.00
16.22.1Extra for dismantling wood work in frame, trusses purlins and rafters etc. for every additional height of one metre or part thereof beyond 5 metres.Sectional area 40 Sq. Cm and aboveCum156.00
16.22.2Extra for dismantling wood work in frame, trusses purlins and rafters etc. for every additional height of one metre or part thereof beyond 5 metres.Sectional area below 40 Sq.cmMetre0.60
16.24Dismantling wooden trellis work (excluding frame) including stacking the serviceable material within 50 metres leadSqm11.00
16.25.1Removing wooden boarding in lining of wall and partition (excluding supporting members) including stacking within 50 metres lead.Thickness up to 10mm thickSqm12.00
16.25.2Removing wooden boarding in lining of wall and partition (excluding supporting members) including stacking within 50 metres lead.Thickness above 10mm. & upto 25mmSqm14.00
16.25.3Removing wooden boarding in lining of wall and partition (excluding supporting members) including stacking within 50 metres lead.Thickness above 25mm. & upto 40mmSqm21.00
16.26Dismantling doors chowkhats with shutters (steel or wood) including architrave, hold fast etc. complete and stacking within 50 metres leadEach85.00
16.27Dismantling windows chowkhats with shutters (steel or wood) including architrave, hold fast etc. complete and stacking within 50 metres leadEach57.00
16.28Taking out door shutters (steel or wood) including stacking within 50 metres leadEach40.00
16.29Taking out window shutters (steel or wood) including stacking within 50 metres leadEach28.00
16.30Dismantling steel work in single section in RS Joists, channels, angles, flats, I-section and T-section including dismembering and stacking within 50 metres leadKG0.60
16.31Dismantling steel work in built-up section in angles, channels, flats I- section and T-section including all gusset plates, bolts, nuts, cutting rivets, welding etc., including dismembering and stacking within 50 metres leadKG0.90
16.32Dismantling steel work in built-up section without dismembering for a span upto 10 metre and height upto 5.0 metre above plinth level including stacking with in 50 metre leadKG0.80
16.35Extra for making structural steel work required to be re-erectedKG0.80
16.36Dismantling terrazzo or mosaic or glazed vitreous or patent cement or tiled flooring or dado skirting of any thickness without sub baseSqm19.00
16.37Dismantling lime/ cement plaster or skirting at any height raking out joints and cleaning the surface for plaster including disposal of rubbish within 50 metres leadSqm9.00
16.38Taking out stone/ concrete/wooden lintels from building masonry of doors windows or any other opening for thickness upto 15 cmMetre62.00
16.39Taking out of cut stone beams, slabs lintels, bracket etc. for thickness exceeding 15cm and upto 30 cmMetre140.00
16.40Dismantling expanded metal or welded fabrics with battens and beading including stacking the serviceable material within 50 metres leadSqm13.00
16.41.1Dismantling precast concrete or stone slabs in walls partitions etc. including stacking within 50 M lead.Thickness up to 38mmSqm51.00
16.41.2Dismantling precast concrete or stone slabs in walls partitions etc. including stacking within 50 M lead.Thickness above 38mm upto 75mmSqm72.00
16.42Demolishing R.C.C. work including stacking of steel bars and disposal of unserviceable material within 50 metre leadCum653.00
16.44Extra for cutting reinforcement bars in R.C.C. or R.B work. (Cross- sectional area of RCC/RB work to be measured)Sqm380.00
16.45Extra for scrapping cleaning and straitening reinforcement obtained on demolishing of R.C.C. or R.B. workKG2.00
16.46Demolishing lime brick coba concrete and disposal or within 50 metres leadCum168.00
16.47Removing and stacking within 50 metres lead Fencing posts or structure including all earth work and dismantling concrete etc. in the baseEach56.00
16.48Dismantling and stacking within 50 M lead R.C.C. fencing posts or structure including all earth work and dismantling of concrete etc. in the baseEach65.00
16.49Cutting ballies or wooden posts of fencing at the points of projection above the concrete or ground and stacking the same within 50 metre leadEach8.00
16.50Taking out R.C.C. jali at any place and positions and of any shape and thickness including finishing the openingSqm43.00
16.52Removing barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metre leadKG7.00
16.53.1Removing following vitreous china sanitorywares carefully for re-use including stacking within 50 metres lead.Wash basin of all sizes and shapesEach26.00
16.53.2Removing following vitreous china sanitorywares carefully for re-use including stacking within 50 metres lead.Urinals of all sizes and shapesEach32.00
16.53.3Removing following vitreous china sanitorywares carefully for re-use including stacking within 50 metres lead.European/ Anglo Indian WC pan of all sizesEach39.00
16.53.4Removing following vitreous china sanitorywares carefully for re-use including stacking within 50 metres lead.Cysten of all sizes and shapesEach29.00

Pricing dismantling and demolishing against a live tender

Mapping a tender BOQ to the right schedule items, applying the current cost index, and catching where rates have moved since the base edition is slow and easy to get wrong. Arched's estimation engine reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.